Tender Value
₹1.6 Cr
EMD Value
₹2.3 L
Closing Date
2 Apr 2026, 3:00 pmClosed
No
No
Single Packet System
Normal Tender
No
Not Applicable
Lowest to Highest
60 days
Expenditure
Capital (Works)
DEN/WS/KGP
21 conditions · 2 needing a document upload
The tenderer must have minimum average annual contractual turnover of 'V/N' or 'V'; whichever is less, where 'V'= Advertised value of the tender in crores of Rupees and 'N'= Number of years prescribed for completion of work for which bids have been invited. ( Click here to download Format)
The average annual contractual turnover shall be calculated as an average of "total contractual payments" in the previous three financial years, as per the audited balance sheet. However, in case balance sheet of the previous year is yet to be prepared/ audited, the audited balance sheet of the fourth previous year shall be considered for calculating average annual contractual turnover.
The tenderers shall submit requisite information as per Annexure-VIB, along with copies of Audited Balance Sheets duly certified by the Chartered Accountant/ Certificate from Chartered Accountant duly supported by Audited Balance Sheet.
The Balance Sheet and all other financial documents attested/ certified by CAs to substantiate fulfilment of Financial Eligibility Criteria should be with UDIN, failing which the offer is likely to be rejected without any further refrence.
The tenderer must have successfully completed or substantially completed any one of the following categories of work(s) during last 07 (seven) years, ending last day of month previous to the one in which tender is invited: (i) Three similar works each costing not less than the amount equal to 30% of advertised value of the tender, or (ii) Two similar works each costing not less than the amount equal to 40% of advertised value of the tender, or (iii) One similar work costing not less than the amount equal to 60% of advertised value of the tender.
Definition of similar work: Execution of P.Way works on running line.
Work experience certificate from private individual shall not be considered. However, in addition to work experience certificates issued by any Govt. Organisation, work experience certificate issued by Public listed company having average annual turnover of Rs 500 crore and above in last 3 financial years excluding the current financial year, listed on National Stock Exchange or Bombay Stock Exchange, incorporated/registered at least 5 years prior to the date of closing of tender, shall also be considered provided the work experience certificate has been issued by a person authorized by the Public listed company to issue such certificates.
In case tenderer submits work experience certificate issued by public listed company, the tenderer shall also submit along with work experience certificate, the relevant copy of work order, bill of quantities, 1.2.1 bill wise details of payment received duly certified by Chartered Accountant, TDS certificates for all payments received and copy of final/last bill paid by company in support of above work experience certificate.
Explanation for Eligibility criteria: 1. Substantially Completed Work means an ongoing work in which payment equal to or more than 90% of the present contract value (excluding the payment made for adjustment of Price variation (PVC), if any) has been made to the contractor in that ongoing contract and no proceedings of termination of contract on Contractor's default has been initiated. The credential certificate in this regard should have been issued not prior to 60 days of date of invitation of present tender. 2. In case a work is started prior to 07 (seven) years, ending last day of month previous to the one in which tender is invited, but completed in last 07 (seven) years, ending last day of month previous to the one in which tender is invited, the completed work shall be considered for fulfillment of credentials. 3. If a work is physically completed and completion certificate to this extent is issued by the concerned organization but final bill is pending, such work shall be considered for fulfillment of credentials 4. In case of completed work, the value of final bill (gross amount) including the PVC amount (if paid) shall be considered as the completion cost of work. In case final bill is pending, only the total gross amount already paid including the PVC amount (if paid) shall be considered as the completion cost of work. In case of substantially completed work, the total gross amount already paid including the PVC amount (if paid), as mentioned in the certificate, shall be considered as the cost of substantially completed work. 5. If a bidder has successfully completed a work as subcontractor and the work experience certificate has been issued for such work to the subcontractor by a Govt. Organization or public listed company as defined in Note for Item 10.1 Para 10 of the Tender Form (Second Sheet), the same shall be considered for the purpose of fulfillment of credentials. 6. In case a work is considered similar in nature for fulfillment of technical credentials, the overall cost including the PVC amount (if paid) of that completed work or substantially completed work, shall be considered and no separate evaluation for each component of that work shall be made to decide eligibility. 7. In case of newly formed partnership firm, the credentials of individual partners from previous propriety firm(s) or dissolved previous partnership firm(s) or split previous partnership firm(s), shall be considered only to the extent of their share in previous entity on the date of dissolution / split and their share in newly formed partnership firm. For example, a partner A had 30% share in previous entity and his share in present partnership firm is 20%. In the present tender under consideration, the credentials of partner A will be considered to the extent of 0.3*0.2*value of the work done in the previous entity. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc.
8. In case of existing partnership firm, if any one or more partners quit the partnership firm, the credentials of remaining partnership firm shall be re-worked out i.e., the quitting partner(s) shall take away his credentials to the extent of his share on the date of quitting the partnership firm (e.g. in a partnership firm of partners A, B & C having share 30%, 30% & 40% respectively and credentials of Rs 10 crore; in case partner C quits the firm, the credentials of this partnership firm shall remain as Rs 6 crore). For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deed(s), dissolution deed(s) and proof of surrender of PAN No.(s) in case of dissolution of partnership firm(s) etc. 9. In case of existing partnership firm if any new partner(s) joins the firm without any modification in the name and PAN/TAN no. of the firm, the credentials of partnership firm shall get enhanced to the extent of credentials of newly added partner(s) on the same principles as mentioned in item 6 above. For this purpose, the tenderer shall submit along with his bid all the relevant documents which include copy of previous partnership deeds, dissolution/splitting deeds and proof of surrender of PAN No.(s) in case of dissolution of partnership firm etc. 10. Any partner in a partnership firm cannot use or claim his credentials in any other firm without leaving the 1.3.1 partnership firm i.e., In a partnership firm of A&B partners, A or B partner cannot use credentials of partnership firm of A&B partners in any other partnership firm or propriety firm without leaving partnership firm of A&B partners. 11. In case a partner in a partnership firm is replaced due to succession as per succession law, the proportion of credentials of the previous partner will be passed on to the successor. 12. If the percentage share among partners of a partnership firm is changed, but the partners remain the same, the credentials of the firm before such modification in the share will continue to be considered for the firm as it is without any change in their value. Further, in case a partner of partnership firm retires without taking away any credentials from the firm, the credentials of partnership firm shall remain the same as it is without any change in their value. 13. In a partnership firm "AB" of A&B partners, in case A also works as propriety firm "P" or partner in some other partnership firm "AX", credentials of A in propriety firm "P" or in other partnership firm "AX" earned after the date of becoming a partner of the firm AB shall not be added in partnership firm AB. 14. In case a tenderer is LLP, the credentials of tenderer shall be worked out on above lines similar to a partnership firm. 15. In case company A is merged with company B, then company B would get the credentials of company A also.]
34 conditions
All the bidders / tenderers should ensure that they are GST compliant and their quoted rates are as per GST law.
Tender value is inclusive of GST. Agencies must quote their rates including GST.
In the instant tender GST is applicable at rate of Eighteen percent (18%).
However, inter se ranking will be done on the quoted value including GST applicable on the date of opening.
In case of increase or decrease in GST rate, same will be either paid by railway or recovered from the agency as the case may be.
Please enter the percentage of local content in the material being offered. Please enter 0 for fully imported items, and 100 for fully indigenous items. The definition and calculation of local content shall be in accordance with the Make in India policy as incorporated in the tender conditions.
If any discrepancy arises in given conditions in instant tender, S.E.Railway Standard GCC-2022 with updated correction slips will be followed.
If necessary, the contractor has to make the structural drawing including soil testing of the work and has to made it approved by a Govt. College/University/Institution. No extra payment will be admissible on this account.
The items covered under CPWD DSR-2023, CPWD Horticulture- 2020 and SER-IR-USSOR-2021 are tentative and approximate and these are considered for evaluation of DV only. However the items covered under CPWD DSR-2023, CPWD Horticulture-2020 and SER-IR-USSOR-2021 may be altered within the scope of work as per instruction of Engineer- in Charge according to site requirement if required. Decision of Engineer in Charge in this regard will be final and binding to all.
In case damage is caused to OFC / Quad cable / signaling cable during execution of the work, the contractor is liable to pay a penalty for damaging the cable. Penalty shall not be levied in case of the following: (i) Detailed cable route plan not provided by concerned department or cable is not protected as per laid down procedures, (ii) The alignment of the cable does not tally with the information provided to the contractor, (iii) The cable depth is found to be less than 800 mm from normal ground level, (iv) No representative of S&T department / Rail Tel was available at site guarding the cables on the fixed pre determined date and time. Penalty to be imposed for damages to cable shall be as under: (a) Only Quad cable or Signaling cable ----- Rs.1.00 Lakh per location, (b) Only OFC ----- Rs.1.25 Lakh per location, (c) Both OFC & Quad -- --- Rs.1.50 Lakh per location, (d) Electrical Cable ----- Rs.1.00 Lakh per location. (Telecom Circular No. 17/2013 issued by Railway Board vide No. 2003/Tele/RCIL/1 Pt.IX dated 24.06.2013 is binding to this contract and should be followed in spirit).
IF required, contractor should mobillse to do night working for which they will be required to have their own sufficient lighting arrangement. No extra payment will be admissible on this account.
The Contractor with the help of his Engineer or Diploma holder , as the case be , shall make necessary Drawings, sketches, plotting, peg markings etc. as desired by the Engineer-in-charge. No extra cost shall be claimed on this account.
The quantities specified in the tender schedule are only approximate and liable to vary.
Execution of the work of (i) Through Turnout Renewal (TTR) work with TWS at inside & outside of Kharagpur Workshop, NWS and NS Yard, and (ii) TRR(S) for 14.725 Tr. Km. under the jurisdiction of DEN/WSP/KGP.
E-KGPW-DEN-04-2026
E-KGPW-DEN-04-2026
Open
Works - General
12 Months
Paschim Medinipur, West Bengal
₹0
₹2.3 L
2 Apr 2026
3 Mar 2026
19 Mar 2026
40 items across 1 schedule · ₹1,55,61,664.77 total
| # | Description | Unit | Qty | Rate | Amount |
|---|---|---|---|---|---|
| 1 | For Through Rail Renewal work | TRM | 4000.00 | 46.36 | 1,85,440 |
| 2 | For PSC wider base sleepers - For location of work not involving deep screening | Each | 6890.00 | 357.81 | 24,65,310.9 |
| 3 | Lubrication of Elastic Rail Clips on PSC sleepers as per procedure prescribed in latest edition of IRPWM with Railway's grease. | ERC | 39840.00 | 2.33 | 92,827.2 |
| 4 | In-situ situation | Each | 40.00 | 290.99 | 11,639.6 |
| 5 | On Cess | Each | 1457.00 | 309.38 | 4,50,766.66 |
| 6 | Hole of dia. 26.5mm and above | Each | 4376.00 | 280.48 | 12,27,380.48 |
| 7 | Rail section of 90R and below | Each | 975.00 | 125.5 | 1,22,362.5 |
| 8 | 1 in 8½ Turnout (Under Traffic Block) | Set | 4.00 | 30,959.52 | 1,23,838.08 |
| 9 | 1 in 12 Turnout (Under Traffic Block) | Set | 1.00 | 35,521.8 | 35,521.8 |
| 10 | 1 in 8½ Turnouts | Set | 4.00 | 18,076.87 | 72,307.48 |
| 11 | 1 in 12 Turnouts | Set | 1.00 | 20,846.35 | 20,846.35 |
| 12 | 1 in 8½ Turnouts | Set | 4.00 | 43,746.23 | 1,74,984.92 |
| 13 | 1 in 12 Turnouts | Set | 1.00 | 51,034.51 | 51,034.51 |
| 14 | For 1 in 8½ Points & Crossing | Set | 4.00 | 7,895.79 | 31,583.16 |
| 15 | For 1 in 12 Points & Crossing | Set | 1.00 | 9,962.86 | 9,962.86 |
| 16 | 25mm gap 'in-situ' welding during traffic block using Railway's welding portion & Welder and finishing of weld to meet the prescribed tolerances and pass all stipulated tests with all required labour, materials, consumables, tools, equipments etc. to complete the work in all respect as per IR's "Manual for Fusion Welding of Rails by Alumino - Thermic Process" with latest correction slips, including marking of welded joint, painting weld collar with anticorrosive paint, restoration of track near weld joint to original position and fixing of joggled fish plate at new weld, to be removed after passing of weld in USFD test as directed by Engineer in charge. Note: 1. Only welding portion and related accessories as per Annexure - I and Welder shall be supplied by Railways. 2. Hydraulic Weld trimmer shall be used for chipping and profile Grinder for finishing. 3. Required nos. of Joggled fish plates shall be supplied by Railway at nearest P. Way Stores and the same shall be returned at nearest P. Way Store or at other location as per direction of Engineer-in-Charge after release from track. | Each | 235.00 | 1,599.21 | 3,75,814.35 |
| 17 | For 60 Kg - 90 UTS Rail | Each | 263.00 | 3,241.26 | 8,52,451.38 |
| 18 | Spreading of ballast, from existing stacks available along formation on top or at cess, in required uniform thickness, compaction of ballast layer laid on new formation at all the locations with smooth wheeled power roller of 8-10 tonne capacity to sufficient number of passes to form consolidated ballast bed of approximately 250mm thickness to a width of 4m symmetrical to centre line of proposed track in correct line & level with all ascents & descents, as directed by Engineer in-charge. Note: Item is inclusive of (a) providing ramp for taking roller to formation and removing the same & making good formation after completion of work; (b) redistribution & leveling of excess ballast while rolling to obtain uniform plane cambered surface. | cum | 7476.00 | 43.18 | 3,22,813.68 |
| 19 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 6000.00 | 137.85 | 8,27,100 |
| 20 | For PSC Sleeper Track with Sleeper Density of 1660 | TRM | 6000.00 | 106.04 | 6,36,240 |
| 21 | 1 in 8½ PSC layout | Set | 10.00 | 11,468.01 | 1,14,680.1 |
| 22 | 1 in 12 PSC layout | Set | 2.00 | 14,919.82 | 29,839.64 |
| 23 | For PSC sleeper Track with Sleeper Density of 1540 sleepers/Km or more | TRM | 150.00 | 178.07 | 26,710.5 |
| 24 | For 60 Kg Rails | TRM | 6000.00 | 86.13 | 5,16,780 |
| 25 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 525.72 | 119.83 | 62,997.03 |
| 26 | I n Wagon where mechanical handling is possible and traffic block is not required or in Truck/trailer. | MT | 23.00 | 118.89 | 2,734.47 |
| 27 | For lead up to 500 metre. | MT | 1002.72 | 385.33 | 3,86,378.1 |
| 28 | From Wagon where mechanical handling is possible and traffic block is not required or in Truck / trailer. | MT | 525.72 | 88.97 | 46,773.31 |
| 29 | I n Wagon/Truck / trailer where mechanical handling is possible a n d traffic block is not required. | MT | 2404.80 | 118.45 | 2,84,848.56 |
| 30 | For lead beyond 500 metre and up to 1 Km | MT | 4224.80 | 444.11 | 18,76,275.93 |
| 31 | Lead up to 5 Km | MT | 102.00 | 168.25 | 17,161.5 |
| 32 | Lead beyond 100 Km and up to 150 Km | MT | 102.00 | 980.11 | 99,971.22 |
| 33 | Lead beyond 5 Km and up to 10 km | MT | 2910.52 | 96.02 | 2,79,468.13 |
| 34 | Lead beyond 100 Km and up to 150 Km | MT | 2910.52 | 865.27 | 25,18,385.64 |
| 35 | From Truck / Trailer | MT | 2404.80 | 87.5 | 2,10,420 |
| 36 | From Truck / Trailer | MT | 23.00 | 119.99 | 2,759.77 |
| 37 | Rails, switches, crossings, SEJ, Glued Joints, Check Rails etc. | MT | 395.00 | 381.86 | 1,50,834.7 |
| 38 | All type of PSC sleepers | MT | 1795.00 | 416.98 | 7,48,479.1 |
| 39 | P.Way fittings of all types and other similar loose items | MT | 88.00 | 387.38 | 34,089.44 |
| 40 | Tractor with Trolley for local transportation or other misc. works. | Hour | 268.00 | 230.79 | 61,851.72 |
| Schedule total | ₹1,55,61,664.77 | ||||
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
HTML
nit.pdf
NIT
VenderMandateForm_1.pdf
ATTACHMENT
AnnexureVIA_1.pdf
ATTACHMENT
AnnexureVIB.pdf
ATTACHMENT
Annexure-II.pdf
ATTACHMENT
2018_CE-I_CT_9Date04_06_2018.pdf
ATTACHMENT
CertificateofInformationregardingEmployment_1.pdf Retired Rly Employee Declaration
ATTACHMENT
MinimumwagesPFESIShramikKalyanPortal.pdf
ATTACHMENT
SpecialConditionofcontractforallcontract.pdf
ATTACHMENT
ACS-1ofGCC-April2022.pdf
ATTACHMENT
ACS-2ofGCC-April2022.pdf
ATTACHMENT
ACS-3ofGCC-April2022.pdf
ATTACHMENT
ACS-4ofGCC-April2022.pdf
ATTACHMENT
ACS-5ofGCC-April2022.pdf
ATTACHMENT
ACS-6ofGCC-April2022.pdf
ATTACHMENT
ACS-7ofGCC-April2022.pdf
ATTACHMENT
ACS-8ofGCC-April2022.pdf
ATTACHMENT
CertificateofInformationregardingEmployment_1.pdf
ATTACHMENT
ACS-9ofGCC-April2022.pdf
ATTACHMENT
ACS-10ofGCC-April2022.pdf
ATTACHMENT
NewModifiedGCC2022.pdf
ATTACHMENT
CableCuttingCircular.pdf
ATTACHMENT
SPECIALCONDITIONSFORP-WAYWork.pdf
ATTACHMENT
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .