Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹58.0 LAccepted-AOC A 14 USHA SADAN NEAR POST OFFICE COLABA MUMBAI 05 | MUMBAI | MUMBAI | MAHARASHTRA | 400005 | L1 | Accepted-AOC LOWEST BIDDER | |
| 2 | L2₹71.2 L+₹11.4 L (19.0%)Rejected-Finance 3 M S SATGURU ENTERPRISES VISHWAKARMA DHARAMSHALA HISAR HARYANA 125001 | HISAR | HARYANA | 125001 | L2 | Rejected-Finance OTHER THAN LOWEST | |
| 3 | L3₹97.7 L+₹37.8 L (63.2%)Rejected-AOC FLAT NO A 102 ASHOKVAN RAJSHIV CO OP HSG SOC SHIV VALLABH ROAD DAHISAR EAST MUMBAI 400 068 | MUMBAI SUBURBAN | MAHARASHTRA | 400068 | L3 | Rejected-AOC OTHER THAN LOWEST | |
| 4 | L4₹1.2 Cr+₹57.5 L (96.2%)Rejected-Finance NOT AVAILABLE | L4 | Rejected-Finance OTHER THAN LOWEST | |
| 5 | Rejected-Technical FLAT NO 402 4TH FLOOR BLDG NO 31 HANSGEET CO OP HSG SOCIETY PANT NAGAR GHATKOPAR E MUMBAI 400 075 | MUMBAI SUBURBAN | MAHARASHTRA | 400075 | - | Rejected-Technical Not Meeting eligibility criteria |
| Sl No | Description | Qty | Unit | S S ENTERPRISES L1 | Bob Enterprises L3 | SHREE JAGDISH FURNITURE CO. L4 | SATGURU ENTERPRISE L2 |
|---|---|---|---|---|---|---|---|
| 1.00 | Demolition of cement concrete (unreinforced) of any description and in any position not otherwise specifically provided for including china mozaic, WC etc complete all as specified and as directed by Engineer-in-charge. | 15 | Cum | 10 ₹150 Lowest | 360 ₹5,400 | 185 ₹2,775 | 300 ₹4,500 |
| 2.00 | Material & Labour forTreatment of sunken floor slab comprises of the following specifications and all as specified
(i) Material & Labour for cleaning of the sunken /lowered portion of the RCC slab surface (including vertical total depth plus skirting height) of floors by wire brush, chiesel out any mortar sticking to the surface and brooming / washing completely. 40 mm avg thik pcc 1:2:4 type B-0 using 12.5 mm graded aggregate as in padding conc to achieve proper slope including 50 mm dia 350 mm long medium grade GI pipe spouts with wire guage on inside mouth to be fixed
(ii) Rendering of uneven surfaces with 6 mm thick CM 1:4 mixed with and incl integral WPC @3% of weight of cement consumed. fill it with water and check dampness and seepage. where dampness and seepage noticed nozzles shall be fixed and grouting carried out
(iii) All junctions points of side walls where CI/GI pipes are passing through shall be sealed with epoxy putty
(iv) After drying putty wash the slab and sides of sunken portion with water and make it clean and clear
(v) Material & Labour for applying two coat of polymer modified cementious water proofing coating as per manufactures instructions to bottom and vertical sides up to finished flooor level +100 mm height. The thickness of two layer shall be 1 mm. When the second layer is still sticky , coarse sand spry shall be carried out or vertical and bottom surface of the sunken portion all as specified and directed.
(vi) Plaster the bottom and sides up to bottom of the skirting with minimum 20 mm thk cm 1:4 mixed with and incl integral WPC 3 % of cement consumes as per manufacures specification including rounding of corners and junctions sloping towards spout
Note:Test the water proofed area (ponding test) by filling water for atleast 72 hours and tested for leakage seepage and to the entire satisfaction of GE . Test shall be done in presence of reps of PMG and record for each sunken slab shall be maintained. the treatment shall be carried out by authorised applicators of chemicals.
(vii) All pipes laid in sunken portion shall be covered with 50 mm thk PCC 1:3:6 all around after painting with anticorrossive black japan paint. | 200 | Sqm | 150 ₹30,000 Lowest | 270 ₹54,000 | 1,247 ₹2,49,400 | 200 ₹40,000 |
| 3.00 | Material and labour for cutting holes in brick / RCC walls in cement mortar exc half & n.exc. one brick depth of embedded portion of hold fast complete all as specified and as directed by Engr-in-Charge. | 50 | Each | 200 ₹10,000 | 40 ₹2,000 Lowest | 222 ₹11,100 | 100 ₹5,000 |
| 4.00 | Supply, laying, connecting and test GI Tubing,50 mm dia. medium grade with all fittings and fixed complete laid in floor complete all as specified and directed by the Engineer-in- charge. | 25 | RM | 200 ₹5,000 | 360 ₹9,000 | 410 ₹10,250 | 100 ₹2,500 Lowest |
| 5.00 | Material & Labour cement concrete 1:5:10 E2 type with with 40mm graded stone coarse aggregate in sunken floor complete all as specified and directed by Engr-in-Charge. | 12 | Cum | 1,500 ₹18,000 | 1,900 ₹22,800 | 2,700 ₹32,400 | 1,000 ₹12,000 Lowest |
| 6.00 | Dismantling floor hearth or wall tiling including cement mortar bedding / backing coat and removal of rubbish out side MD land complete all as specified and directed by Engineer -in-Charge.
Note: The place of disposal shall be find out by the contractor. | 2,485 | Sqm | 20 ₹49,700 | 11 ₹27,335 | 25 ₹62,125 | 10 ₹24,850 Lowest |
| 7.00 | Material & Labour non-skid coloured Ceramic tiles 300x300x 7-8mm thick (square/rectangular) area of each tile exceeding 0.06sqm but not excceding 0.11 sqm, in floors etc, set and jointed in cement mortar and pointed in white of coloured cement to match including 20 mm thick screed bed in CM 1:6 complete all as specified and directed by Engineer -in-Charge. | 210 | Sqm | 300 ₹63,000 Lowest | 590 ₹1,23,900 | 685 ₹1,43,850 | 400 ₹84,000 |
| 8.00 | M & L Coloured glazed ceramic tiles in vertical surfaces 300 x 200 x 7-8 mm set & jointed in neat cement slurry and pointed in white cement mixed with pigment complete all as specified and directed by Engineer -in-Charge. | 500 | Sqm | 300 ₹1,50,000 Lowest | 500 ₹2,50,000 | 547 ₹2,73,500 | 400 ₹2,00,000 |
| 9.00 | M&L for rendering 10mm thick in cement mortar 1:4 on fair faces of brick work or concrete surfaces complete all as specified and directed. | 500 | Sqm | 100 ₹50,000 | 105 ₹52,500 | 111 ₹55,500 | 70 ₹35,000 Lowest |
| 10.00 | M&L non-skid coloured Ceramic tiles 400x400x 7 - 8mm thick (square/rectangular) area of each tile exceeding 0.11sqm but not excceding 0.18 sqm, in floors etc, set and jointed in epoxy mortar and pointed in white of coloured cement to match including 15 mm thick screed bed in CM 1:6 complete all as specified and directed by Engineer -in-Charge. | 1,700 | Sqm | 300 ₹5,10,000 Lowest | 600 ₹10,20,000 | 847 ₹14,39,900 | 400 ₹6,80,000 |
Tender Value
₹1.2 Cr
EMD Value
₹1.9 L
Closing Date
1 Sept 2025, 6:00 pmClosed
CWE (NW) Mumbai
CWE (NW) Mumbai
REPAIR TO LEAKAGE/SEEPAGE OF SHAFT AREA REMOVING OF VEGETATION GROWTH, REAPAIR TO CI/PVC PIPE LINE CRUMPLE SHEET AND OTHER CONNECTED WORKS AT RS COLABA , RASHI AREA REPAIR TO INTER LOCKING PAVER BLOCKS REPAIR/REPLACEMENT OF GULLY TRAP REPAIR TO FENC
2025_MES_723073_1
8228/CWE(NW)Mumbai/E8
Open Tender
Civil Works
Item Rate
180 days
GE (NW) Navy Nagar
Class B
Category a (i)
7 documents required · 7 mandatory
₹1,000
GE (NW) Navy Nagar
₹1.9 L
Yes
2 Jan 2026
29 Jul 2025
3 Sept 2025
29 Jul 2025
1 Sept 2025
19 Aug 2025
29 Jul 2025 - 18 Aug 2025
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .