Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
Tender Value
₹39.0 L
EMD Value
₹40,000
Closing Date
25 Aug 2022, 4:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
The Project Director, DRDA, Sivagangai
O/o The Project Director, DRDA, Sivagangai
AGAMT II 2021-22 Rejuvenation of water bodies works at Kallal Block in Sivagangai District - Package No. 112
2022_RDTN_247640_1
112_Pack_AGAMT II 21-22/KLL
Open Tender
Civil Works
Item Rate
30 days
SIVAGANGAI
Please refer Tender documents.
4 documents required · 4 mandatory
₹0
₹40,000
Yes
5 Sept 2022
20 Aug 2022
25 Aug 2022
20 Aug 2022
25 Aug 2022
20 Aug 2022
Amount
Improvements and construction of Sluice 3no Poyyalur Mechi Kanmoi at poyyalur panchayat
Clearing Juli Flora Jungle without Uprooting, Sl no 7 Item 9D
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Sl no:86 Item no: 1
Tank Bund and Closing Add to relevant T.N.D.S.S no.20.A, rates for new Tank bund and closing Breaches for extra watering and consolidation By power roller including Hire Charges Sl.no;71 Item no:13
Construction of Sluice No-1
Earth Work excavation and depositing on bank with a initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton,hand red earth,shales,murram,gravel,stoney earth and earth mixed with small size of boulders hard gravelly soil
Dismantling without damaging the near by strectures if any,clearing away and carefully stacking matrials useful for reuse for any thickness of wall in brick or stone masonry in cement mortar walls under 3m high etc..complete
Dismantling without damaging the near by strectures if any,clearing away and carefully stacking matrials useful for reuse for any thickness of Plain Cements Concrete in cement mortar walls under 3m high etc..complete
Earthwork excavation in all classes of soil such as hard stiff clay. Stiff block hard red earth shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as st
Filling with clear river sand in foundation including cost and conveyance to site and labour charges for watering ramming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Supply,Laying,Jointing and fixing in position of Rcc Hume Pipes of NP3 Class of 900mm dia with Suitable collard including labour charges and jointing materials etc..complete
Supplying and fixing Cut Stone roughly dressed to size all faces and set in cm1:3 including incidental charges such as finishing and etc…Complete
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:2:4 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Fabricating and Supply of Country Wood Plug size of 40x40 cm and 45cm to 60cm height .The plug rod with 20mm dia mild steel rod and etc..complete
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut wherever necessary in layers including all labour charges and etc…complete
Construction of Sluice No-2
Earth Work excavation and depositing on bank with a initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton,hand red earth,shales,murram,gravel,stoney earth and earth mixed with small size of boulders hard gravelly soil
Dismantling without damaging the near by strectures if any,clearing away and carefully stacking matrials useful for reuse for any thickness of wall in brick or stone masonry in cement mortar walls under 3m high etc..complete
Dismantling without damaging the near by strectures if any,clearing away and carefully stacking matrials useful for reuse for any thickness of Plain Cements Concrete in cement mortar walls under 3m high etc..complete
Earthwork excavation in all classes of soil such as hard stiff clay. Stiff block hard red earth shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as st
Filling with clear river sand in foundation including cost and conveyance to site and labour charges for watering ramming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Supply,Laying,Jointing and fixing in position of Rcc Hume Pipes of NP3 Class of 900mm dia with Suitable collard including labour charges and jointing materials etc..complete
Supplying and fixing Cut Stone roughly dressed to size all faces and set in cm1:3 including incidental charges such as finishing and etc…Complete
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:2:4 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Fabricating and Supply of Country Wood Plug size of 40x40 cm and 45cm to 60cm height .The plug rod with 20mm dia mild steel rod and etc..complete
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut wherever necessary in layers including all labour charges and etc…complete
Construction of Sluice No-3
Earth Work excavation and depositing on bank with a initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton,hand red earth,shales,murram,gravel,stoney earth and earth mixed with small size of boulders hard gravelly soil
Dismantling without damaging the near by strectures if any,clearing away and carefully stacking matrials useful for reuse for any thickness of wall in brick or stone masonry in cement mortar walls under 3m high etc..complete
Dismantling without damaging the near by strectures if any,clearing away and carefully stacking matrials useful for reuse for any thickness of Plain Cements Concrete in cement mortar walls under 3m high etc..complete
Earthwork excavation in all classes of soil such as hard stiff clay. Stiff block hard red earth shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as st
Filling with clear river sand in foundation including cost and conveyance to site and labour charges for watering ramming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Supply,Laying,Jointing and fixing in position of Rcc Hume Pipes of NP3 Class of 900mm dia with Suitable collard including labour charges and jointing materials etc..complete
Supplying and fixing Cut Stone roughly dressed to size all faces and set in cm1:3 including incidental charges such as finishing and etc…Complete
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:2:4 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Fabricating and Supply of Country Wood Plug size of 40x40 cm and 45cm to 60cm height .The plug rod with 20mm dia mild steel rod and etc..complete
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut wherever necessary in layers including all labour charges and etc…complete
Concstruction of Bathing Ghat and and Retaining Wall at Senthani Oorani at Kurunthampattu Panchayat
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Construction of Bathing Ghat
Earthwork excavation in all classes of soil such as hard stiff clay. Stiff block hard red earth shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as st
Filling with clear river sand in foundation including cost and conveyance to site and labour charges for watering ramming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Construction of Retaining Wall
Earthwork excavation in all classes of soil such as hard stiff clay. Stiff block hard red earth shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as st
Filling with clear river sand in foundation including cost and conveyance to site and labour charges for watering ramming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Improvements and Construction of Bhathing Ghat (1Nos) at Navalkanniyan Madam Oorani
Earth work excavation in all classes of soils and subsoils except in hard rock requiring blastering and coveying for formation of bund with lead of 0 to 100m deploying earth moving machineries and tippers including benching and formation of bunds sectioning etc., completed. (Annexure III - F1)
Construction of Bathing Ghat
Earthwork excavation in all classes of soil such as hard stiff clay. Stiff block hard red earth shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as st
Filling with clear river sand in foundation including cost and conveyance to site and labour charges for watering ramming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Construction of Leading channel
Earthwork excavation in all classes of soil such as hard stiff clay. Stiff block hard red earth shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as st
Filling with clear river sand in foundation including cost and conveyance to site and labour charges for watering ramming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:2:4 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Construction of Retaining Wall
Earthwork excavation in all classes of soil such as hard stiff clay. Stiff block hard red earth shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as st
Filling with clear river sand in foundation including cost and conveyance to site and labour charges for watering ramming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Improvements and Desilting and Reconstruction of Sluice (1 Nos) Chinna Vavari Kanmoi
Clearing Juli Flora Jungle without Uprooting, Sl no 7 Item 9D
Earth work in all soils except hard rock requiring blasting and conveying for formation of bund with lead of 0 to 100 metre deploying earth moving machinery and tippers including benching, formation of bunds, breaking clods, sectioning etc., complete Sl no:86 Item no: 1
Tank Bund and Closing Add to relevant T.N.D.S.S no.20.A, rates for new Tank bund and closing Breaches for extra watering and consolidation By power roller including Hire Charges Sl.no;71 Item no:13
Construction of Sluice No-1
Earth Work excavation and depositing on bank with a initial lead of 10m & initial lift of 2m in hard stiff clay stiff black cotton,hand red earth,shales,murram,gravel,stoney earth and earth mixed with small size of boulders hard gravelly soil
Dismantling without damaging the near by strectures if any,clearing away and carefully stacking matrials useful for reuse for any thickness of wall in brick or stone masonry in cement mortar walls under 3m high etc..complete
Dismantling without damaging the near by strectures if any,clearing away and carefully stacking matrials useful for reuse for any thickness of Plain Cements Concrete in cement mortar walls under 3m high etc..complete
Earthwork excavation in all classes of soil such as hard stiff clay. Stiff block hard red earth shales, murram, gravel, stoney earth expect hard rock requiring blassing and depositing on bank with all leads and lifts and all incidental charges such as st
Filling with clear river sand in foundation including cost and conveyance to site and labour charges for watering ramming and all other incidental charges etc., complete.
Cement Concrete 1:4:8 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Supply,Laying,Jointing and fixing in position of Rcc Hume Pipes of NP3 Class of 900mm dia with Suitable collard including labour charges and jointing materials etc..complete
Supplying and fixing Cut Stone roughly dressed to size all faces and set in cm1:3 including incidental charges such as finishing and etc…Complete
Supply and erecting centering for sides of steps including all cost of material and labour charges etc., complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:2:4 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Cement Concrete 1:3:6 mix using 40mm ISS HBG metal including cost and Conveyance of all materials to site including cost of cement and all other incidental charges etc. ,complete.
Fabricating and Supply of Country Wood Plug size of 40x40 cm and 45cm to 60cm height .The plug rod with 20mm dia mild steel rod and etc..complete
Refilling with excavated earth (other than sand) with all leads and lifts for filling the open cut wherever necessary in layers including all labour charges and etc…complete
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SP.KARUNKAPPAN CONTRACTOR
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .