| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | 1st₹1.5 CrAccepted-AOC | ₹1.5 Cr | 1st | Accepted-AOC L1 |
| 2 | 2nd₹1.5 Cr+₹673.78 (<0.01%)Rejected-Finance | ₹1.5 Cr+₹673.78 (<0.01%) | 2nd | Rejected-Finance L2 |
Tender Value
Refer Docs
EMD Value
₹3.0 L
Closing Date
11 Mar 2023, 4:00 pmClosed
Executive Engineer, Doimukh Division, APPWD
O/o the Executive Engineer, Doimukh Division, APPWD, Doimukh
C/o Road from PMGSY Link Road to Deepo Village Upper Jumi Under Kimin Circle.
2023_PWDAP_1135_1
DD/2022-23/07
Open Tender
Civil Works – Roads
Works
730 days
Kimin
Please refer Tender documents.
3 documents required · 3 mandatory
₹2,000
Executive Engineer, Doimukh Division, APPWD
₹3.0 L
21 Dec 2023
4 Mar 2023
14 Mar 2023
4 Mar 2023
11 Mar 2023
4 Mar 2023
Amount
SH:-Site clearance
Clearing and grubbing road land by mechanical means including uprooting rank vegetation, grass, bushes, shrubs saplings and trees of girth upto 300 mm, removal of stumps and stumps of trees cut earlier and disposal of unserviceable materials and staking of serviceable material with all lead up to 1000m including removal and disposal of top organic soil not exceeding 150mm in thickness.
By Mechanical Means ; In area of thorny jungle.
Cutting of trees, including cutting of trunks, branches and removal of stumps and stumps of trees cut earlier, roots, stacking of serviceable material with all lifts and upto a lead of 1000 m and earth filling in the depression/pit.
i) Girth from 300mm to 600mm
ii) Girth from 600mm to 900mm
iii) Girth from 900mm to 1800mm
[SH:- Formation Cutting (2.07 Km)-I] (2.07 Km)
Excavation in Hill Area in Soil by Mechanical Means (Excavation in soil in hilly area by mechanical means including cutting and trimming of side slopes and disposing of excavated earth with all lifts and lead upto 1000 metres)
Excavation in Hilly Area in Ordinary Rock by Mechanical Means not Requiring Blasting. (Excavation in hilly area in ordinary rock not requiring ballasting by mechanical means including cutting and trimming of slopes and disposal of cut material with all lift and lead upto 1000 metres )
Excavation in Hilly Areas in Hard Rock Requiring Blasting (Excavation in hilly areas in hard rock requiring blasting, by mechanical means including trimming of slopes and disposal of cut material with all lifts and lead upto 1000 metres.)
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift (Ordinary and Hard Soil/Hard Shale, Soil containing shingle or small size boulders.
Deduct for quantum of earthwork of all types disposal directly by throwing into the valley without involving any lead and lift. (Ordinary and Hard Rock)
(Sub-Head:- RCC Box Culvert 2.00m Span - 2.00m height with Wing walls) 3 (Three) Nos.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material
Manual Means
Depth upto 3 m
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
RCC Grade M20
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20 , Using Concrete Mixer, Height upto 5m
Construction of precast RCC railing of M25 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
Providing and laying filter media behind abutment and return wall, complete as per drawings and Technical Specifications Section 1200.
Providing and laying of boulder apron for bed protection in U/S and D/S protection work complete as per drawing and Technical specifications clause 1300.
Providing & fixing in position HYSD (TMT) reinforcement bars in foundations complete as per drawings and Technical Specifications Section 1000.
Providing & fixing in position HYSD (TMT) reinforcement bars in superstrucutre complete as per drawings and Technical Specifications Section 1000.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
(Sub-Head:- RCC Box Culvert 5.00m Span - 4.00m height with Wing walls).
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and backfilling with approved material
Manual Means
Depth upto 3 m
Plain cement concrete 1:3:6 nominal mix in foundation with crushed stone aggregate 40 mm nominal size mechanically mixed, placed in foundation and compacted by vibration including curing for 14 days.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications.
RCC Grade M20
Furnishing and Placing Reinforced/ Prestressed cement concrete in super-structure as per drawing and Technical Specification
RCC Grade M20
Using Concrete Mixer
Height upto 5m
Construction of precast RCC railing of M25 Grade, aggregate size not exceeding 12 mm, true to line and grade, tolurence of vertical RCC post not to exceed 1 in 500, centre to centre spacing between vertical post not to exceed 2000 mm, leaving adequate space between vertical post for expansion, complete as per approved drawings and technical specifications.
Providing and laying filter media behind abutment and return wall, complete as per drawings and Technical Specifications Section 1200.
Providing and laying of boulder apron for bed protection in U/S and D/S protection work complete as per drawing and Technical specifications clause 1300.
Providing & fixing in position HYSD (TMT) reinforcement bars in foundations complete as per drawings and Technical Specifications Section 1000.
Providing & fixing in position HYSD (TMT) reinforcement bars in superstrucutre complete as per drawings and Technical Specifications Section 1000.
Providing weep holes in Brick masonry/Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V :20H towards drawing foce. Complete as per drawing and Technical Specifications
Ms YMY Enterprise
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .