Loading…
Loading…
Tender Value
₹20 Cr
EMD Value
₹13.3 L
Closing Date
13 Oct 2026, 6:00 pm
Chief Engineer Pune Zone
HQ Chief Engineer Pune Zone Camp, Pune 411001
CONSTRUCTION OF BOUNDARY WALL AT VARIOUS LOCATIONS INCLUDING DEMOLITION OF EXISTING WALL UNDER GE (P) NDA.
2026_MES_789444_1
84687
Open Tender
Civil Works
Item Rate
720 days
Garrison Engineer (P) NDA
Class SS and Category a(i)
7 documents required · 7 mandatory
₹3,000
Garrison Engineer (P) NDA
₹13.3 L
Yes
15 Sept 2026
15 Sept 2026
20 Oct 2026
15 Sept 2026
13 Oct 2026
6 Oct 2026
16 Sept 2026 - 23 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolition of brick work or stone/ boulder masonry, built in cement mortar or cement lime mortar including all quoins, arches, pillars etc. but excluding ashlar facings, dressed stone work and precast cement articles and removing debrish from site complete all as specified and directed | 3,940 | Per Cubic Metre | - | - |
| 2 | M&L for Earth work in excavation by mechanical means (Hydraulic excavator)/Manual means in foundation trenches, drains, shafts, wells, pier holes, manholes, cesspits, laying cable ducts/pipes (not exceeding 1.5 m in width or 10 sqm on plan) and not exc 1.50m in depth in all kind of soil, including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and directed. | 7,000 | Per Cubic Metre | 1 | ₹7,000 |
| 3 | All as per Item No. 2 above but exc 1.5 m but not exc 3.0 m complete all as specified. | 600 | Per Cubic Metre | 2 | ₹1,200 |
| 4 | M&L for Earth work in excavation by mechanical means (Hydraulic excavator)/Manual means in foundation trenches, drains, shafts, wells, pier holes, manholes, cesspits, laying cable ducts/pipes (not exceeding 1.5 m in width or 10 sqm on plan) and not exc 1.50m in depth in Soft/Disintegrated/Ordinary rock, including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and directed. | 5,438 | Per Cubic Metre | 3 | ₹16,314 |
| 5 | All as per Item No. 4 above but exc 1.5 m but not exc 3.0 m complete all as specified. | 400 | Per Cubic Metre | 4 | ₹1,600 |
| 6 | M&L for Earth work in excavation by mechanical means (Hydraulic excavator)/Manual means in foundation trenches, drains, shafts, wells, pier holes, manholes, cesspits, laying cable ducts/pipes (not exceeding 1.5 m in width or 10 sqm on plan) and not exc 1.50m in depth in Hard rock (Blasting is prohibited), including dressing of sides and ramming of bottoms, lift upto 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m complete all as specified and directed. | 6,000 | Per Cubic Metre | 5 | ₹30,000 |
| 7 | All as per Item No. 6 above but exc 1.5 m but not exc 3.0 m complete all as specified. | 562 | Per Cubic Metre | 6 | ₹3,372 |
| 8 | M&L Plain Cement Concrete (1:4:8) type D-2 using 40 mm graded stone aggregate as in foundation, filling, filling in post holes and mass concrete complete all as specified and directed. | 1,372 | Per Cubic Metre | 7 | ₹9,604 |
| 9 | Returning filling in including spreading, levelling, watering and well ramming in layers n.exc 25cm in any kind of soil complete all as specified and directed. | 7,600 | Per Cubic Metre | 8 | ₹60,800 |
| 10 | Returning filling in including spreading, levelling, watering and well ramming in layers n.exc 25cm in Soft/disintegrated rock complete all as specified and directed. | 5,838 | Per Cubic Metre | 9 | ₹52,542 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.04 MB
84687-Tender-Boundaywall-NDA.pdf
Tender Documents • 4.13 MB
Main-Drawing-84687.pdf
Additional Documents • 0.64 MB
CEPZ-88-TD-9M SHT 1-2.pdf
Additional Documents • 4.68 MB
CEPZ-88-TD-9M SHT 2-2.pdf
Additional Documents • 0.47 MB
CEPZ-88-TD-11M SHT 1-1.pdf
Additional Documents • 0.52 MB
CEPZ-88-TD-14M SHT 1-3.pdf
Additional Documents • 0.41 MB
CEPZ-88-TD-14M SHT 2-3.pdf
Additional Documents • 0.44 MB
CEPZ-88-TD-14M SHT 3-3.pdf
Additional Documents • 0.42 MB
CEPZ-88-TD-15M SHT 1-1.pdf
Additional Documents • 0.37 MB
CEPZ-88-TD-17M SHT 1-4.pdf
Additional Documents • 5.58 MB
CEPZ-88-TD-17M SHT 2-4.pdf
Additional Documents • 1.23 MB
CEPZ-88-TD-17M SHT 3-4.pdf
Additional Documents • 7.70 MB
CEPZ-88-TD-17M SHT 4-4.pdf
Additional Documents • 7.68 MB
CEPZ-89-TD-15M (SHT NO-1.1).pdf
Additional Documents • 0.61 MB
CEPZ-91-TD-7M SHT 1-1.pdf
Additional Documents • 7.75 MB
CEPZ-91-TD-8M SHT 2-2.pdf
Additional Documents • 0.15 MB
CEPZ-91-TD-19M SHT 1-1.pdf
Additional Documents • 5.48 MB
CEPZ-91-TD-24M SHT 1-1.pdf
Additional Documents • 5.47 MB
CEPZ-92-TD-11M SHT 1-2.pdf
Additional Documents • 5.49 MB
CEPZ-92-TD-11M SHT 2-2.pdf
Additional Documents • 5.48 MB
CEPZ-93-TD-20M SHT 1-1.pdf
Additional Documents • 5.43 MB
CEPZ-93-TD-22M SHT 1-1.pdf
Additional Documents • 5.47 MB
CEPZ-97-TD-05 (SHT 1.1).pdf
Additional Documents • 0.24 MB
CEPZ-97-TD-6-STR SHT 1-1.pdf
Additional Documents • 0.52 MB
CEPZ-98-TD-6 SHT NO 1-2.pdf
Additional Documents • 0.22 MB
CEPZ-98-TD-6 SHT NO 2-2.pdf
Additional Documents • 0.22 MB
CEPZ-2001-TD-02 SHT NO 1-1.pdf
Additional Documents • 0.18 MB
CEPZ-2001-TD-03-STR (SHT 1.1).pdf
Additional Documents • 0.08 MB
CEPZ-2001-TD-06 SHT NO 1-2.pdf
Additional Documents • 0.23 MB
CEPZ-2001-TD-06 SHT NO 2-2.pdf
Additional Documents • 0.16 MB
CEPZ-2008-TD-05 (SHT 1.1).pdf
Additional Documents • 0.36 MB
CEPZ-2016-TD-03 (SHT 1R.3)0001.pdf
Additional Documents • 4.00 MB
CEPZ-2016-TD-03 (SHT 2R.3)0001.pdf
Additional Documents • 3.67 MB
CEPZ-2019-TD-03 (SHT 1.2).pdf
Additional Documents • 0.14 MB
CEPZ-2019-TD-03 (SHT 2.2).pdf
Additional Documents • 0.06 MB
CEPZ-2021-SF(TD)-04 (SHT NO- 1.1).pdf
Additional Documents • 0.62 MB
CEPZ-2021-TD-01-STR (SHT NO. 1.3).pdf
Additional Documents • 0.63 MB
CEPZ-2021-TD-01-STR (SHT NO. 2.3).pdf
Additional Documents • 0.33 MB
CEPZ-2021-TD-01-STR (SHT NO. 3.3).pdf
Additional Documents • 0.27 MB
CEPZ-2023-TD-03 (SHT NO- 1-4).pdf
Additional Documents • 0.73 MB
CEPZ-2023-TD-03 (SHT NO- 2-4).pdf
Additional Documents • 0.76 MB
CEPZ-2023-TD-03 (SHT NO- 3-4).pdf
Additional Documents • 0.75 MB
CEPZ-2023-TD-03 (SHT NO- 4-4).pdf
Additional Documents • 0.55 MB
CEPZ-2024-TD-01 (SHEET 1-1).pdf
Additional Documents • 0.35 MB
CEPZ-88-TD-4M SHT 1-4.pdf
Additional Documents • 4.63 MB
CEPZ-88-TD-4M SHT 2-4.pdf
Additional Documents • 4.64 MB
CEPZ-88-TD-4M SHT 3-4.pdf
Additional Documents • 4.63 MB
CEPZ-88-TD-4M SHT 4-4.pdf
Additional Documents • 4.63 MB
BOQ_884966.xls
BOQ • 0.66 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .