Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹29.7 LAdmitted-Finance | ₹29.7 L | L1 | Admitted-Finance |
| 2 | L2₹32.1 LAdmitted-Finance | ₹32.1 L | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | PMA CONSTRUCTIONS L2 | DINESH K L1 |
|---|---|---|---|---|---|
| 1.00Name of Work : Construction of Community hall Building @ Santhanapuram Village in Karseri Panchayat at Madurai East Block under MLACDS - 2025 - 26 | |||||
| 2.00 | Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B | 34.69 | CUM | 290 ₹10,060.10 | 263 ₹9,123.47 |
| 3.00 | Supllying filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete | 4.07 | CUM | 2,300 ₹9,361 | 2,025 ₹8,241.75 |
| 4.00 | supplying and filling US gravel including all labour charges | 63.21 | CUM | 650 ₹41,086.50 | 622 ₹39,316.62 |
| 5.00 | Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete., | 14.32 | CUM | 6,100 ₹87,352 | 5,761.7 ₹82,507.54 |
| 6.00 | R.Cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete., | 42.62 | CUM | 10,100 ₹4.3 L | 9,524.49 ₹4.1 L |
| 7.00 | Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete., | 339.49 | sqm | 1,200 ₹4.1 L | 1,095 ₹3.7 L |
| 8.00 | Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc. | 4,688.2 | kg | 98 ₹4.6 L | 92 ₹4.3 L |
| 9.00 | Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x43/8"x23/4" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete. | 47.42 | CUM | 6,500 ₹3.1 L | 6,171.05 ₹2.9 L |
| 10.00 | Door 1.50m x 2.40m | 7.2 | NO | 5,500 ₹39,600 | 4,927.6 ₹35,478.72 |
Tender Value
₹30 L
Closing Date
21 Jan 2026, 3:00 pmClosed
BDO
Madurai East Panchayat Union, Madurai
Construction of Community hall Building at Santhanapuram Village in Karseri Panchayat in Madurai East Block in Madurai District for the Year 2025 26 Package No 1
2026_RDTN_644582_1
MLACDS-2025-2026 Madurai East Pkg No 1
Open Tender
Civil Works
90 days
Madurai East Panchayat Union
EMD prequalification
2 documents required · 2 mandatory
₹0
Exempted
23 Jan 2026
19 Jan 2026
21 Jan 2026
19 Jan 2026
21 Jan 2026
19 Jan 2026
Earth work excavation in all soils such as red earth ,hard stiff clay soil, stiff black cotton soil, hard redearth,shales, murrams, gravel,hard rock not requiring blasting ete complete.,SS 20 B
Supllying filling with filling sand in layers not more than 15 cm thick ,well rammed, wattered and compacted etc,complete
supplying and filling US gravel including all labour charges
Cement concrete 1:4:8 mix usin 40 mm HBGS metal inculding cost and coveyance of all materials to site including labour for mixing , laying,curing etc complete.,
R.Cement concrete 1:11/2:3 mix using 20 mmHBGS metal inculding cost and coveyance of all materials to site including labour for mixing ,laying,curing etc complete.,
Supplying and erection centering for sides and soffits inculding necessary supports and structing for plain surfaces such as RCC Slab,Lintel,Beam coloum,sunshade etc complete.,
Supplying and fabrication,placing in position of mild steel or ribbed Tor steel grils for RCC works inculding cost of steel and binding wire etc.
Brick work with cement mortar 1:5 mix using country bricks of size 83/4"x43/8"x23/4" for foundation and basement and superstructure inculding cost and conveyance of all materiales curing etc ,complete.
Door 1.50m x 2.40m
Window 1.50m x 1.60m
Weathering course with broken brick jeely for 20 mm size mixed with pure slacked lime (no sand to be used) in proposation of 32:12.5 cft to proper gradient,well beation with wooden beaters etc
Terrace flooring with one coarce of new machine pressed tiles of size 23x23x2 cm using Cm 1:3 with water proofing compound 2% weight of cement used and the joints pointed with same morter etc complete.
Paving the floor with best quality Vetrified Tiles of size 600 x 600 x 8mm of approved colour, shade and quality laid in cement mortar 1:3 (one cement and three M.Sand) 20mm thick in all floors and the top pointed with the white cement mixed same colour
Plastering with Cement Morter 1:5 mix 12 mm thick inculding cost and conveyance of all materials to site and labour charges for curing etc
Supplying and applying of two coats of putty of 3mm thick over the exposed RCC surface of ceiling including finishing the joints smoothy with grinding machine and the surface shall be thoroughly cleaned out of dust and scrubbing. The Surface shall then be allowed to dry for atleast 48 hours. It shall then be sand papered (waterproof abrasive sheet) to give a smooth and even surface. Any unevenness shall be made good by applying 1st coat of putty mixed with water on the entire surface including filling up the undulations and applying 2nd coat of putty after 6 hours of 1st coat of putty and then sand papering (waterproof abrasive sheet) the same after it is dry and finishing the surface smoothly, etc., complete complying with standard specifications and as directed by the Departmental Officers. [ The rates are inclusive of hire charges for grinding machine with wheel, cost of sand paper (waterproof abrasive sheet), cost of putty blade, labour charges for grinding the joints and sand papering, two coat of putty, scrapping the putty area to level the surface smooth, etc., complete]. The Putty shoule be got approved by the Executive Engineer before use on work.
Supplying and painting the walls with two coats of oil bound distemper over one coat of water based cement primer including cost for distemper, primer, cleaning and scrapping the walls, rendering the walls smooth with necessary putty, brushes, scaffoldin
Painting two coats with ready mixed Plastic emulsion of first class quality paint and of approved colour over a priming coat ,inculding through scrapping, clean removal of dirt etc. complete and inculding necessary plasterof paris , putty whereever re
Light Point /fan point SD 20
Plug point SD 38
Tube light SD 83
Ceiling Fan SD 106
Provision for Hand rail Arrangements
Provision for Water Supply Arrangements
Provision for Name Board charges
Provision for Photographic charges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.17 MB
Tendernotice_2.pdf
PDF • 0.68 MB
document.pdf
Tender Documents • 0.67 MB
BOQ_772446.xls
BOQ • 0.33 MB
Download all tender documents and submit your bid