Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance 0 BUDKIYA DEVATRA JODHPUR RAJASTHAN 342606 | JODHPUR | RAJASTHAN | 342606 | Admitted-Finance |
| 3 | Rejected-Technical | Rejected-Technical incomplete documents |
Tender Value
Refer Docs
EMD Value
₹2,000
Closing Date
5 Jul 2022, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
Superintending Engineer, EDC, Hapur
Superintending Engineer, EDC, Hapur
Releasing connection to M/s. IRB Hapur Muradabad Tolway Hapur in area of EDD-I Hapur
2022_PVVNL_709477_1
32(W)/EDCH/2022-23
Open Tender
Electrical Works
Lump-sum
Hapur
enclosed
3 documents required · 3 mandatory
₹1,180
SE, EDC, Hapur
₹2,000
7 Jul 2022
20 Jun 2022
5 Jul 2022
20 Jun 2022
5 Jul 2022
20 Jun 2022
20 Jun 2022 - 5 Jul 2022
Amount
FOR RELEASING 04NOS. CONNECTIONS AND OTHER ASSOCIATED WORKS TO M/S. IRB HAPUR MURADABAD TOLWAY LTD., FOR LIGHTING AT VARIOUS SITE, IN DEPOSIT SCHEME, IN THE JURISDICTION OF EDD-I HAPUR, UNDER EDC., HAPUR. (All work will be done as per Sanctioned estimate)
Carriage of line material (like insulator, channel, clmaps, conductor etc.) from Electricity Store Center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of ST Pole 11 mtrs. Long from Electricity store center, Hapur/J.E. Store to site of work with loading and unloading at both ends on Kachha Packka road.
Carriage of 63KVA Transformers from Electricity store center, Hapur to site of work with loading and unloading at both ends on Kachha Packka road.
Erection & Fixing of STP Pole 11 mtr. long in 11 KV line after digging of suitable pits including fixing of requisite accessories as per RESPO Drawing/Norms by providing F-Bracket made of M.S. Flat of size 50x6 mm, Cross Arm holding Clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Fabrication, erection and fixing of double pole on ST Pole 11 mtr. long with fixing of M.S. Top & Dropper Channel, M.S. S/S Angle, E-Bracket, 11 KV Pin insulator with Pin, Disc Insulator with Disc fitting as per RESPO Drawing/Norms by providing top and dropper clamps made of M.S. Flat of size 50x6 mm with proper size nuts and bolts.
Laying, Stringing and final sagging of ACSR Weasl Conductor after binding from Insulator, as per RESPO/Drawing Norms.
Laying, Stringing and final sagging of ACSR Rabbit Conductor after binding from Insulator, as per RESPO/Drawing Norms.
Mounting, Placing and connecting from LT/HT side of 11KV, 63KVA T/F as per RESPO Norms.
Fabrication & Fixing of T-Channel on pole by providing Holding Clamps, F-Clamps & Proper size nuts & bolts, as per RESPO/Norms.
Grouting & fixing of stay rods (20x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:4:8 cement, sand, 40mm brick ballast as per drg. Including back filling, proper ramming etc and fixing tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing as per RESPO Drawing/Norms by providing all grouting material and stay clamp made of M.S. Flat of size 50x6mm with proper size bolts & nuts & loops.
Earthing of supports with MS earth Rod of (20x2500)mm long including excavation of pit and driving M.S. Rod 3.0 M apart from support and 0.5m below the ground level and connection below the earth electrodes with the help of G.I. wire & earthing lugs as per RESPO Drawing/Norms by providing proper size nuts & bolts.
Grouting of ST supports in CC 1:4:8 (Cement, sand & 40mm brick ballast) Grouting will be done in the block of size (450x450)mm x1/6th of full length of the support, up to ground level, 300mm plinth above the ground level with CC 1:3:6 (Cement, core sand and Stone grit) with mufting as per drawing, work includes back filling & proper ramming by providing all required grouting materials.
Jumpering work properly as per RESPO/Norms.
OM CONSTRUCTION COMPANY
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .