Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹14.6 LAdmitted-Finance | -1.75% | ₹14.6 L | L1 | Admitted-Finance |
Tender Value
₹14.9 L
EMD Value
₹29,720
Closing Date
18 Aug 2026, 6:00 pmClosed
ADPC, SMSA HANUMANGARH
OFFICE OF THE ADPC, SMSA HANUMANGARH
Construction of Civil Work under MMAY
2026_RCSCE_585918_1
E-TENDER07CIVIL/26-27/HMH/MMAY
Open Tender
Civil Works
Percentage
180 days
KIKARWALI, SANGARIA
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,000
ADPC ,SMSA, MD, RISL
₹29,720
27 Aug 2026
12 Aug 2026
19 Aug 2026
12 Aug 2026
18 Aug 2026
12 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1PART A CIVIL WORK | |||||
| 1.01 | E.W In Excavation In Foundation Trenches Or Drains Including Dressing Of Sides & Ramming Of Bottoms, Lift Upto 1.50 Mtr Including Taking Out The Excavated Soil And Depositing & Refilling Of Jhiri With Watering & Ramming & Disposal Of Surplus Excavated Soil as Directed within a lead of 50 m. all kind of soil | 58.22 | Cum | 178 | ₹10,363.16 |
| 1.02 | P&L Cement Concrete Including Curing, Compaction Etc. Complete Using stone Aggregate 40mm Nominal Size In Floring & Foundation Excluding The Cost Of Shuttering Using 1 Cement:4 Sand:8 Aggregate Mix. | 10.29 | Cum | 3,302 | ₹33,977.58 |
| 1.03 | Brick work with common burnt clay F.P.S. (Non Modular) bricks of class designation 7.5 in foundation and plinth with CM 1:6 | 33.73 | Cum | 4,263 | ₹1,43,790.99 |
| 1.04 | Centering and shuttering with plywood or steel sheets including strutting, propping, bracing both ways and removal of formwork for foundations in basements rafts, footings, strap beams, bases of columns , etc. up to plinth level. | 19.5 | Sqm | 157 | ₹3,061.5 |
| 1.05 | Providine And Laying In Position specified grade ofreinforcement Cement Concrete Including Curing, Compaction Etc. Of Specified Grade Excluding The Cost Of Centering And Shuttring Upto Plinth Level In 1:1.5:3 (1 Cem. :1.5 Coar. Sand : 3 Graded Stone Aggr. 20mm Non. Size) | 3.41 | Cum | 4,934 | ₹16,824.94 |
| 1.06 | Supply & Stacking good earth at site complete including loading unloading & transporation etc. Filling available excavated earth (excluding rock) in trenches, plinth side of foundation etc. in layers not exceeding 20 cm. in depth , consolidating each deposited layer by ramming and watering including lead upto 50Mtr. and lift upto 1.5Mtr. | 0.4 | Cum | 304 | ₹121.57 |
| 1.07 | Brick work with common burnt clay F.P.S. (Non Modular) bricks of class designation 7.5 in Super structure with CM 1:6 | 48.71 | Cum | 4,990 | ₹2,43,062.9 |
| 1.08 | Brick work with common burnt clay F.P.S. (Non Modular) bricks of class designation 7.5 in Super structure with CM 1:4 Rectangular Pillar | 0.63 | Cum | 5,583 | ₹3,517.29 |
| 1.09 | Half brick masonry in Superstructure , above plinth level upto floor V level using bricks of designation 75 Cement mortar 1 : 4 (1 cement : 4 coarse sand) | 12.82 | Sqm | 553 | ₹7,089.46 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 12.12 MB
BOQ_1040869.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .