| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹66.2 LAccepted-AOC 9415225188 SIRAJPUR BILHAUR KANPUR UTTAR PRADESH | FATEHPUR | UTTAR PRADESH | 208001 | ₹66.2 L | L1 | Accepted-AOC AOC |
| 2 | L2₹66.9 LRejected-Finance CHANDAULI | UTTAR PRADESH | 221009 | ₹66.9 L | L2 | Rejected-Finance REJECTED |
Tender Value
Refer Docs
EMD Value
₹5.4 L
Closing Date
13 Feb 2026, 12:00 pmClosed
S E VO VARANASI CIRCIL PWD VARANASI
S E VO VARANASI CIRCIL PWD VARANASI
JANPAD VARANASI ME BHAGVANPUR ME KIRAN STEEL SE GARDENIYA MUKHYA MARG PURVA NIRMIT CHHATTIGRAST SLAIB KALBART KE STHAN PAR 2x3X3 MT SPAN KE BOX KALVART KA NIRMAN KARYA
2026_CEUVZ_1113322_3
517/183KAAM VO CIRCIL PWD VNS/2025-26 DATE 29.01.2026
Open Tender
Civil Works - Bridges
180 days
VARANASI
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,714
₹5.4 L
S E VO VARANASI CIRCIL PWD VARANASI
19 Apr 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
13 Feb 2026
7 Feb 2026
7 Feb 2026
Earthwork in excavation for foundation of structure as per drawings and technical specification, including setting out, construction of shoring and bracing, removal of sumps and other deleterious matter, dress of sides and bottom backfilling with approved material.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Sand Filling in foundation trenches as per drawing and technical specification. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
PCC Grade M-15 in open Foundation complete as per drawing and Technical specifications.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
PCC Grade M-20 in open Foundation complete as per drawing and Technical specifications.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Brick masonry work in cement mortat 1:3 for substructure complete as per drawing and technical specifications.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Flexible Apron-Construction of flexible apron 1 m thick comprising of loose stone boulder weighing not less than 40 kg beyond curtain wall.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Furnishing and Placing M-25 RCC in super-structure as per drawing and technical specification.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing weep holes in brick masonry/ Plain/Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1:20 (V:H) towards drawing force. Complete as per drawing and technical specifcations.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Providing and laying of Filter media with granular materials/stone crushed aggregates satisfying the requirements laid down in clause 2504.2.2 of MoRTH specification to a thickness of not less than 600 mm with smaller size towards the soil and bigger size towards the wall and provided over the entire surface behind abutment, wing wall and return wall to the full height compacted to a firm condition complete as per drawing and technical specification.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Back filling sandy material behind abutment, wing wall and return wall complete as per drawing and technical specification.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Drainage Spouts complete as per drawing and tehnical specification.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Supply fitting and placing HYSD Bar reinforcement in super structure complete as per drawing and technical specifications.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Dismentaling of Existing damage slab Culvert. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Running of 5HP pump for dewatering including arrangement of pump suction and delivery pipes and other accessories at site including cost of POL. (Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Construction of construction joint only, plain cement concrete pavement, thickness as per design, over a prepared sub base, with 43 grade cement or any other type as per Clause 1501.2.2 M30 (Grade), coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate not exceeding 25 mm, mixed in a concrete mixer of not less than 0.2 cum capacity and appropriate weigh batcher using approved mix design, laid in approved fixed side formwork (steel channel, laying and fixing of 125 micron thick polythene film, wedges, steel plates including levelling the formwork as per drawing), spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joints, applying debonding strips, primer, sealant,, near approaches to bridge/culvert and construction joints, admixtures as approved, curing of concrete slabs for 14-days,using curing compound (where specified) and water finishing to lines and grade as per drawing and Technical Specification Clause 1501.(Including labour Material T&P etc. complete as per direction of E/I & also including all taxes. Labour cess but excluding GST)
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
technical_2060469.pdf
techsummary_2060469.pdf
finance_2060469.pdf
BOQ Comparative Chart
xlsx
finsummary_2060469.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.54 MB
T-2.pdf
Tender Documents • 0.47 MB
BOQ_2060469.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid