Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.8 CrAccepted-AOC H NO 11 B ASHOKA GARDEN SAMRAT NAGAR BHOPAL M P 462001 | BHOPAL | BHOPAL | MADHYA PRADESH | 462001 | ₹2.8 Cr | L1 | Accepted-AOC Accepted |
| 2 | L2₹2.8 Cr+₹2.9 L (1.02%)Rejected-Finance | ₹2.8 Cr+₹2.9 L (1.02%) | L2 | Rejected-Finance L2 |
| 3 | L3₹2.9 Cr+₹6.5 L (2.31%)Rejected-Finance | ₹2.9 Cr+₹6.5 L (2.31%) | L3 | Rejected-Finance L3 |
| 4 | L4₹2.9 Cr+₹12.9 L (4.57%)Rejected-Finance BISHA MOHAL CHAMALI CHOUK BADA BAZAR SAGAR | SAGAR | MADHYA PRADESH | 464240 | ₹2.9 Cr+₹12.9 L (4.57%) | L4 | Rejected-Finance L4 |
| 5 | L5₹2.9 Cr+₹13.0 L (4.63%)Rejected-Finance MIG A 6 4 MAHANAND NAGAR UJJAIN M P | GUNA | MADHYA PRADESH | 473001 | ₹2.9 Cr+₹13.0 L (4.63%) | L5 | Rejected-Finance L5 |
Tender Value
₹3.9 Cr
EMD Value
₹3.9 L
Closing Date
3 Dec 2024, 5:30 pmClosed
EXECUTIVE ENGINEER PWD (B/R) DIVISION NO.1 SAGAR
EXECUTIVE ENGINEER PWD (B/R) DIVISION NO.1 SAGAR
Construction of Different Roads With Electrification Work Under PWD Sub Division Deori Length - 4.30 Km Rs. 389.77 Lacs 1- Dongarsalaiya to Emjhira Mukti Dham Road Including Electrification Work Length - 1.70 Km PAC RS 198.58 Lacs 2- Kopra to D
2024_PWDRB_383226_1
09/2024-25 dt. 20.11.2024
Open Tender
Civil Works - Roads
Percentage
180 days
SAGAR
Please refer Tender documents.
4 documents required · 4 mandatory
₹15,000
₹3.9 L
4 Apr 2025
21 Nov 2024
5 Dec 2024
21 Nov 2024
3 Dec 2024
21 Nov 2024
tech_eval
fin_bid_open
boq_comp_chart
xlsx
fin_eval
aoc
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .