Loading…
Loading…
Tender Value
₹13 L
EMD Value
₹39,000
Closing Date
31 Aug 2026, 4:30 pm2d left
Executive Engineer Flood Control Division Anantnag
Executive Engineer Flood Control Division Anantnag
Construction of Protection Bund Laisoo vishew Nallah at Laisoo Phase II
2026_IFC_321130_2
e NIT 14 of 2026-27
Open Tender
Civil Works
Percentage
12 days
Anantnag/Kulgam
As per E NIT
2 documents required · 2 mandatory
₹300
Yes
Executive Engineer Flood Control Division ANantnag
₹39,000
Yes
31 Aug 2026
17 Aug 2026
1 Sept 2026
17 Aug 2026
31 Aug 2026
17 Aug 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1. | |||||
| 1.01 | Earth work in bulk excavation by mechanical means (hydraulic excavator) over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 m2 on plan) including disposal of excavated earth lead upto 50 meters and lift upto 1.5 m, as directed by Engineer-in-Charge. All kinds of soil : | 426.8 | Cum | 187.3 | ₹79,939.64 |
| 1.02 | Banking excavated earth in layers not exceeding 20cm in depth, breaking clods, watering, rolling each layer with 1/2 tonne roller, or wooden or steel rammers, and rolling every 3rd and top-most layer with power roller of minimum 8 tonnes and dressing up, in embankments for roads, flood banks, marginal banks, and guide banks etc., lead upto 50 m and lift upto 1.5 m in All kinds of soil: | - | Cum | 429.45 | - |
| 1.03 | Dry stone pitching (any thickness) excluding cost of stones.
On Horizontal | - | Cum | 535.55 | - |
| 1.04 | Dry stone pitching (any thickness) excluding cost of stones.
On Slopes | - | Cum | 693.95 | - |
| 1.05 | Hand-packing stones in wire-crates; excluding cost of crates and stones | - | Cum | 371.15 | - |
| 1.06 | Supply of Stones (Nallah) | 0.8 | Cum | 700 | ₹560 |
| 1.07 | Supply of 4mm Dia. G.I Wire crates of size 16'x16' (Mesh size 4"x4") as per ISI Specification. | 20,758 | Sft. | 23 | ₹4,77,434 |
| 1.08 | Binding Wire for Crates | 81 | KG | 80 | ₹6,480 |
| 1.09 | Centering and shuttering including strutting, propping etc. and removal of form work for:
Foundations, footings, bases for columns | 1 | Sqm | 286.35 | ₹286.06 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.87 MB
BOQ_1071198.xls
BOQ • 0.32 MB
Extension.pdf
PDF • 0.49 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].