| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.9 CrAdmitted-Finance | ₹1.9 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.1 Cr+₹16.1 L (8.27%)Admitted-Finance | ₹2.1 Cr+₹16.1 L (8.27%) | L2 | Admitted-Finance |
| 3 | L3₹2.2 Cr+₹29.9 L (15.3%)Admitted-Finance | ₹2.2 Cr+₹29.9 L (15.3%) | L3 | Admitted-Finance |
| 4 | L4₹2.5 Cr+₹59.7 L (30.7%)Admitted-Finance 806 8TH FLOOR MULUND WEST NEPTUNE UPTOWN N S ROAD VILLAGE TOWN MULUND CITY MUMBAI MUMBAI MAHARASHTRA 400080 INDIA | MUMBAI SUBURBAN | MAHARASHTRA | 400080 | ₹2.5 Cr+₹59.7 L (30.7%) | L4 | Admitted-Finance |
| 5 | L5₹2.7 Cr+₹72.4 L (37.2%)Admitted-Finance | ₹2.7 Cr+₹72.4 L (37.2%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Encee Rail Engineers and Fabricators Pvt Ltd L4 | M/s.SAI SHREYASI CONSTRUCTION L2 | Skater Infratech India Pvt. Ltd. L3 | SANJAY KUMAR UPADHYAY L6 | Samal Construction L5 | LAXMI ENTERPRISES L1 |
|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Filling the low laying area with dredged spoil as per required level in layer wise ,each layer not exceeding 1mtr.,within a lead of avg. 8 km ,watering ,compacting with VRR etc. with all cost of material,royalties,transportation loading & unloading, labour, T&P etc. all complete as per the direction of Engineering-in-charge.(Excluding GST). (NB : 10.00% voids shall be deducted from measured qty. at site for payment) | 9,930 | Each Cum | 200 ₹19,86,000 Lowest | 200 ₹19,86,000 Lowest | 289 ₹28,69,770 | 426.45 ₹42,34,648.5 | 400 ₹39,72,000 | 220 ₹21,84,600 |
| 2.00 | Dismantling brick or stone masonry in lime or cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50m at places as directed, cleaning the debrises with supply of all labour, T&P, staging, scaffolding, including leads & lifts, transportation & disposing at specified place etc. complete with all taxes, and as per direction of Engineer-in-charge. (Excluding GST) | 174 | Each Cum | 1,000 ₹1,74,000 | 400 ₹69,600 Lowest | 989 ₹1,72,086 | 1,296.7 ₹2,25,625.8 | 1,210 ₹2,10,540 | 5,200 ₹9,04,800 |
| 3.00 | Removing old cement plaster from walls including raking out joints 12mm deep including stacking the useful materials for reuse and removing the debris within 50m with supply of all labour, T&P, staging, scaffolding, cleaning the debrises with all taxes, including leads & lifts, transportation & disposing at specified place etc. complete and as per direction of Engineer-in-charge. (Excluding GST) | 50 | Each Sqm | 50 ₹2,500 | 5 ₹250 Lowest | 38.89 ₹1,944.5 | 46.42 ₹2,321 | 45 ₹2,250 | 160 ₹8,000 |
| 4.00 | Earth work excavation in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles with supply & cost of all labour, materials, T&P, all taxes, tollage, royalities, loading & unloading, breaking the clods etc. all complete as per the direction of Engineer-in-Charge. (Excluding GST). | 3,858 | Each Cum | 150 ₹5,78,700 | 100 ₹3,85,800 Lowest | 120.89 ₹4,66,393.62 | 200.82 ₹7,74,763.56 | 190 ₹7,33,020 | 120 ₹4,62,960 |
| 5.00Providing & laying Pre-cast RCC collar of M-30 grade of following dia.with 1½" thick & 1'-00" height all complete with supply of all materials, labour, T&P, taxes, royalties, tollage, ,transportation loading & unloading etc. all complete as directed by Engineer-in-charge. (Excluding GST). NB : The agency has to submit manufacturing test certificate at his own cost . | |||||||||
| 5.01 | Pre-cast RCC collar 2'-6" dia. reinforced with 2nos. of 4mm dia. steel | 1,037 | Each No. | 400 ₹4,14,800 | 320 ₹3,31,840 Lowest | 352.89 ₹3,65,946.93 | 372.72 ₹3,86,510.64 | 320 ₹3,31,840 Lowest | 850 ₹8,81,450 |
| 5.02 | Pre-cast RCC collar 3'-6" dia. reinforced with 3nos. of 4mm dia. steel | 208 | Each No. | 500 ₹1,04,000 | 400 ₹83,200 Lowest | 470.89 ₹97,945.12 | 465.9 ₹96,907.2 | 400 ₹83,200 Lowest | 1,050 ₹2,18,400 |
| 6.00 | Back Filling in foundation and plinth with excavated materials including watering and ramming with all accessories, T&P with supply & cost of all labour, loading & unloading, breaking the clods etc. all complete as per the direction of Engineer-in-Charge. (Excluding GST). | 2,572 | Each Cum | 50 ₹1,28,600 Lowest | 50 ₹1,28,600 Lowest | 89 ₹2,28,908 | 133.88 ₹3,44,339.36 | 142 ₹3,65,224 | 140 ₹3,60,080 |
| 7.00 | P.C.C(1:3:6) of using 40mm. & down H.B.G chips of approved quality in foundation & plinth including mixing in mixer machine, hoisting, laying to proper level & slope compacting, curing, watering charges including cost & supply of all materials, labour, T&P, taxes,royalties, tollage, testing charges,,transportation loading & unloading etc. complete as per the directed by Engineer-in-charge. (Excluding GST) | 73.5 | Each Cum | 3,800 ₹2,79,300 | 4,000 ₹2,94,000 | 3,189 ₹2,34,391.5 Lowest | 4,574.02 ₹3,36,190.47 | 4,500 ₹3,30,750 | 5,200 ₹3,82,200 |
| 8.00 | Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing,watering charges with cost and supply of all materials, labour, T&P, taxes, royalties, tollage,testing charges, ,transportation loading & unloading etc. complete as per the directed by Engineer-in-charge. (Excluding GST) | 563 | Each Cum | 6,000 ₹33,78,000 | 5,600 ₹31,52,800 | 5,889 ₹33,15,507 | 6,472.28 ₹36,43,893.64 | 6,200 ₹34,90,600 | 1,900 ₹10,69,700 Lowest |
Tender Value
₹2.9 Cr
EMD Value
₹5.9 L
Closing Date
26 Nov 2024, 5:30 pmClosed
Kulamani Behera, EE, PHD(M), PPA
Kulamani Behera, EE, PHD(M), PPA
Repairing and Renovation work to the perimeter wall surrounding Reservoir - I, II and III at Balijhara.
2024_MoS_833693_1
CE/ PHD(M)/ACCTS-06/24/590
Open Tender
Civil Works
Works
240 days
Paradip
Refer Tender Document and e-TCN
5 documents required · 5 mandatory
₹5,000
Yes
As per Tender Document and e-TCN
₹5.9 L
Yes
26 Dec 2024
5 Nov 2024
28 Nov 2024
5 Nov 2024
26 Nov 2024
5 Nov 2024
Amount
Filling the low laying area with dredged spoil as per required level in layer wise ,each layer not exceeding 1mtr.,within a lead of avg. 8 km ,watering ,compacting with VRR etc. with all cost of material,royalties,transportation loading & unloading, labour, T&P etc. all complete as per the direction of Engineering-in-charge.(Excluding GST). (NB : 10.00% voids shall be deducted from measured qty. at site for payment)
Dismantling brick or stone masonry in lime or cement mortar under 3m height including stacking the useful materials for reuse and removing the debris within 50m at places as directed, cleaning the debrises with supply of all labour, T&P, staging, scaffolding, including leads & lifts, transportation & disposing at specified place etc. complete with all taxes, and as per direction of Engineer-in-charge. (Excluding GST)
Removing old cement plaster from walls including raking out joints 12mm deep including stacking the useful materials for reuse and removing the debris within 50m with supply of all labour, T&P, staging, scaffolding, cleaning the debrises with all taxes, including leads & lifts, transportation & disposing at specified place etc. complete and as per direction of Engineer-in-charge. (Excluding GST)
Earth work excavation in all kind of soil with initial lead and lift including rough dressing in layers not exceeding 0.3m in depth and the Earth transported by transport vehicles with supply & cost of all labour, materials, T&P, all taxes, tollage, royalities, loading & unloading, breaking the clods etc. all complete as per the direction of Engineer-in-Charge. (Excluding GST).
Providing & laying Pre-cast RCC collar of M-30 grade of following dia.with 1½" thick & 1'-00" height all complete with supply of all materials, labour, T&P, taxes, royalties, tollage, ,transportation loading & unloading etc. all complete as directed by Engineer-in-charge. (Excluding GST). NB : The agency has to submit manufacturing test certificate at his own cost .
Pre-cast RCC collar 2'-6" dia. reinforced with 2nos. of 4mm dia. steel
Pre-cast RCC collar 3'-6" dia. reinforced with 3nos. of 4mm dia. steel
Back Filling in foundation and plinth with excavated materials including watering and ramming with all accessories, T&P with supply & cost of all labour, loading & unloading, breaking the clods etc. all complete as per the direction of Engineer-in-Charge. (Excluding GST).
P.C.C(1:3:6) of using 40mm. & down H.B.G chips of approved quality in foundation & plinth including mixing in mixer machine, hoisting, laying to proper level & slope compacting, curing, watering charges including cost & supply of all materials, labour, T&P, taxes,royalties, tollage, testing charges,,transportation loading & unloading etc. complete as per the directed by Engineer-in-charge. (Excluding GST)
Cement concrete (1:1.5:3) using 12mm to 20mm size C.B.G. chips for all floors, foundation & plinth etc. of approved quality mixing, hoisting, laying, compacting, curing,watering charges with cost and supply of all materials, labour, T&P, taxes, royalties, tollage,testing charges, ,transportation loading & unloading etc. complete as per the directed by Engineer-in-charge. (Excluding GST)
Supply Tor/TMT steel manufactured by SAIL/TISCON/VIZAG Steel of Fe-500 confirming to IS-1786 including cutting, straightening, bending, binding & placing the grills in position for RCC works, binding the grills with binding wire of 18 to 20 gauge including supply of steel, labour, materials, transportation charges, T&P, taxes, royalties, tollage, testing charges,transportation loading & unloading etc. complete as per the directed by Engineer-in-charge. (Excluding GST) . NB: No payment shall be made for extra weight than theoretical co-efficient.
Providing rigid smooth leak proof centering & shuttering made of steel/ply, plank of approved quality for R.C.C. structures and deshuttering and removing the same after due period including supply of labour, materials, transportation charges, T&P, taxes, royalties, tollage, transportation loading & unloading etc. complete as per the directed by Engineer-in-charge.(Excluding GST)
Brick work in Fly Ash Bricks of size 25cmx12cmx8cm having crushing strength not less than 75 Kg/Cm² to 99Kg/Cm² with C.M (1:6) including splay/cutting, raking out the joints, curing, hoisting, staging at any height including supply of labour, materials, transportation charges,water charges, T&P, taxes, royalties, tollage,testing charges, transportation loading & unloading etc. complete as per the directed by Engineer-in-charge.(Excluding GST)
Providing & fixing pre-cast M-30 grade of RCC poles of size 10' x 8" x 8" reinforced with 6nos. of 8mm dia TMT vertical bars & 6mm dia stirrups lncuding lifting, fixing in vertical position, staging, scaffolding at any height including supply of labour, materials, T&P, taxes, royalties, tollage, transportation loading & unloading etc. complete as per the directed by Engineer-in-charge.(Excluding GST). NB :The agency has to submit manufacturing test certificate at his own cost .
Providing & fixing pre-cast RCC panels of size 6' x 2" x 1' of M-30 grade having one side plane finish, panel shall be reinforced with 3nos. of 8mm dia horizontal TMT bars & 12 nos. of 6mm dia vertical bars . Top should have logo of Paradip Port Authority of size 250mm diameter engraved in one panel of each span including supply of labour, materials, transportation charges, T&P, taxes, royalities, royalties, tollage, transportation loading & unloading etc. complete as per the directed by Engineer-in-charge.(Excluding GST). NB: 1)Unit of measurement shall be in Square meter as per size of 50mm thick panel. 2) The agency has to submit manufacturing test certificate at his own cost .
Providing & fixing pre-cast RCC coping of size 6' x 6" x 4" of M-30 grade having one side plain finish, coping shall be reinforced with 4nos. of 8mm dia. horizontal TMT bars & 13 nos. of 6mm dia. vertical bars fixed on the top panel including supply of labour, materials, transportation charges, staging, scaffolding at any height, T&P, taxes, royalties, tollage, transportation loading & unloading etc. complete as per the directed by Engineer-in-charge.(Excluding GST). NB: The agency has to submit manufacturing test certificate at his own cost .
Providing & fixing pre-cast CC poles head cap of M-30 grade size as per drawing/site requirement including supply of steel, labour as per requirment, including supply of all materials, transportation charges, staging, scaffolding at any height, loading & unloading, T&P, taxes, tollage, royalties, loading & unloading etc. all complete as per the direction of Engineer-in-charge. (Excluding GST). NB: The agency has to submit manufacturing test certificate at his own cost .
12MM thick Cement plaster with cement mortar (1:6) proportion, over brick work including raking out the joints, finished smooth to the exposed surface, rounding the corners, staging, scaffolding at any height, curing, watering charges , including supply of all materials, transportation charges, staging, scaffolding at any height, loading & unloading, T&P, taxes, tollage, royalties, loading & unloading etc. all complete as per the direction of Engineer-in-charge.(Excluding GST)
Supplying, fitting, fixing & fabricating 65mm & 50mm dia GI pipe, laying in proper slope & manner as required including supply & cost of labour,materials, T&P, taxes, royalties, tollage, staging, scaffolding, transportation loading & unloading etc. all complete but with supply of all as per the direction of Engineer-in-charge. (Excluding GST)
Preparing the structural member surface by scrapping, cleaning the rusts and spray painting the same with two coats of coaltar epoxy paint over a coat of inorganic zinc silicate primer of approved quality, including supply & cost of labour,materials,brushes, T&P, taxes, royalties, tollage, staging, scaffolding at any height, transportation loading & unloading etc. all complete as per the direction of Engineer-in-charge. (Excluding GST)
One coat Priming with water bond cement primer to the newly plaster surface of the exterior wall or over the exisitng putty surface of the interior wall of approved make & shade to make an even finished surface in all heights with all scaffolding and staging including cost and supply of all materials, labour, T&P, all taxes, staging, scaffolding at any height, transportation, loading & unloading ,tollage, royalties etc. complete as per direction of Engineer-in-charge. (Excluding GST)
Exterior painting two coats to wall surface with acrylic based weather coat paint of approved quality & shade having resistance to Fungus, Fading, including scraping, cleaning, brushing, washing the old paint, as and when required, removing the flakes applying uniformly two coats including cost and supply of all materials, labour, T&P, all taxes, staging, scaffolding at any height, transportation, loading & unloading ,tollage, royalties etc. complete as per direction of Engineer-in-charge. (Excluding GST)
Dewatering of accumulated water by engaging required numbers of 10HP diesel pump with all accessories, T&P, suction & disposal pipe with fuel, operator charges, engagement hire & running charges etc. all complete as per the direction of Engineer-in-charge. (Excluding GST). NB: No idle hours shall be paid.
Engagement of chain mounted poclain for excavation & leveling to the existing area as required with hire & running charge of machineries, transportation, tollage, loading & un-loading of machine,operator charges, POL etc all complete as per the direction of Engineer-in-charge. (Excluding GST). NB: No idle hours shall be paid.
Laying of NP3 pipe in proper slope & gradient as required for proper drainage of water including lifting, fixing in proper position & slope with cost of all material, labour, T&P, transportation, loading & unloading, tollage, royalties etc. all complete as per the direction of Engineer-in-charge.(Excluding GST)
Supplying of sweet earth of approved quality for blanketing including collecting, conveying by private vehicle with all lead & lift & laying the same at work site as per requirement with supply & cost of all labour, materials,T&P, all taxes, tollage, royalities, loading & unloading, breaking the clods etc. all complete as per the direction of Engineer-in-Charge. (Excluding GST). NB : 20.00% voids shall be deducted from measured qty. at site for payment .
M/s.SAI SHREYASI CONSTRUCTION (BID ID -3126345)
Skater Infratech India Pvt. Ltd. (BID ID -3126623)
Encee Rail Engineers and Fabricators Pvt Ltd (BID ID -3124961)
Samal Construction (BID ID -3126905)
SANJAY KUMAR UPADHYAY (BID ID -3126638)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.66 MB
BOQ_876095.xls
BOQ • 0.29 MB
BOQ.xls
BOQ • 0.30 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .