Construction of Toilets in Chinnasalem Block under RCSIDS 19-20 in Kallakurichi District Package 007
2020_RDTN_164868_1
B4/RCSIDS/KKI/NEW/007
Open Tender
Civil Works
Works
180 days
Kallakurichi District
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹8,000
Yes
4 Aug 2020
26 May 2020
27 Jul 2020
26 May 2020
27 Jul 2020
27 May 2020
Amount
Construction of New Toilets for Boys PU.Elementary School @panayangal,Panchayat in thiyagadurgam Block in kallakurichi District.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and filling in basement with M.Sand in layers not more than 15cm thick, well ramed and consolidated complying with stanadard specification.
Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete.
Brick work in cement mortor 1:5 thick using country bricks of size 23cmx11cmx7cm and m.sand (One cement and three sand) using hoop iron reinforcement if found necessary including finishing and curing etc., complete complying with standard specification.
Super structures
Supplying and erecting centering for sides and soffiots including necessary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items,
Supplying, fabricating and placing in position M.S. or R.T.S. reinforcement grill for RCC works as per the design given including cost of steel and binding wire etc., complete complying with standard specification.
Reinforced Cement Concrete of mix 1:1.5:3 (One cement, one and half sand and three aggregate) with water proofing compound of 2% by weight of cement used and using 20mm size machine crushed granite stone jelly etc., complete.
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshads, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick, including raking the surface.
Plastering with cement mortar 1;5, using 12mm thick in all floors etc.,complete.
Finishing thetop of roof with one course pressed tiles of size 23cmx23cmx2cm laid in CM1:3, Mix ano pointing with the same morter mixed with water proof
Paving the floor with best quality Tiles of size 300 mmx 300 mmx 8 mm of approved colour, shade and quality laid in cement mortor 1:3 , 20 mm thick in all floors and the top pointed with the white cement mixed with same colouring pigements and as directed by the departmental officers etc complete complying with standard specification.
Dadooing walls with colour designed ceramic glazed tiles of size 300mmx200mmx6mm of any shape and quality laid cement mortor 1:2 over 10mm base layer in all floors and the top pointed with the white cement 0.40kg mixed with tha same colouring pigments etc complete.
Distembering two coats with best approved oil bound distember including cost of painting with prime coat over new plastered surface and conveyance of all materils to site and all labour charges etc complete.
painting two coats with approved exterior emulsion over one coat of prime coat over plastered wall surfaces, ceiling and other new surface including cleaning, preparing the surface curing, scaffolding charges etc complete.
painting two coats over iron work including cost of paint and labour charges etc complete
Provision for wash basin with all accessories
Provision for hand rail
Provision for rcc tank cover slab
Provision for mirror pvc/fiber glass framed 5.50mm thick mirrir, shelf type with hard board backing.
Supply and fixing of doors of size 0.75x1.80 m
Supply and fixing of jolly of size 0.60x0.45 m
Labour charges fixing of doors
provision for water closet oriya type
Provision for EWC
Provision for interanl water supply arrangements
provision fo sanitary arrangements
provision fo isoak pit
provision for name board
provision for photo charges
provitions for water supply pipe line from OHT
Earth work Excavation inhard stiff clay soil
cost of supply of PVC Pipe & specials including all labour charges etc, for pumping
Towards labour charges for laying ,cutting, threding jointing of PVC, GI Pipes and
Refilling excavated earth for all labour chrges
Construction of New Toilets for Boys PU.Elementary School @ porasakurichi,Panchayat in thiyagadurgam Block in kallakurichi District.
Earth work Excavation for Foundation in all soils and Sub Soil to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring strutting and requiring the sides of foundation.
Supplying and filling in basement with M.Sand in layers not more than 15cm thick, well ramed and consolidated complying with stanadard specification.
Cement Concrete 1:4:8 (One Cement, Four sand and Eight hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation laid in layers of not more than 15 cm thick well rammed, consolidated and curing etc. complete.
Brick work in cement mortor 1:5 thick using country bricks of size 23cmx11cmx7cm and m.sand (One cement and three sand) using hoop iron reinforcement if found necessary including finishing and curing etc., complete complying with standard specification.
Super structures
Supplying and erecting centering for sides and soffiots including necessary supports and strutting as directed by the departmental officers. Rate for 10m2 for the following items,
Supplying, fabricating and placing in position M.S. or R.T.S. reinforcement grill for RCC works as per the design given including cost of steel and binding wire etc., complete complying with standard specification.
Reinforced Cement Concrete of mix 1:1.5:3 (One cement, one and half sand and three aggregate) with water proofing compound of 2% by weight of cement used and using 20mm size machine crushed granite stone jelly etc., complete.
Finishing the exposed surface of RCC item of work such as slabs, beams, sunshads, facia, canopy slab, staircase waist slab, landing slab etc., with CM 1:3, 10mm thick, including raking the surface.
Plastering with cement mortar 1;5, using 12mm thick in all floors etc.,complete.
Finishing thetop of roof with one course pressed tiles of size 23cmx23cmx2cm laid in CM1:3, Mix ano pointing with the same morter mixed with water proof
Paving the floor with best quality Tiles of size 300 mmx 300 mmx 8 mm of approved colour, shade and quality laid in cement mortor 1:3 , 20 mm thick in all floors and the top pointed with the white cement mixed with same colouring pigements and as directed by the departmental officers etc complete complying with standard specification.
Dadooing walls with colour designed ceramic glazed tiles of size 300mmx200mmx6mm of any shape and quality laid cement mortor 1:2 over 10mm base layer in all floors and the top pointed with the white cement 0.40kg mixed with tha same colouring pigments etc complete.
Distembering two coats with best approved oil bound distember including cost of painting with prime coat over new plastered surface and conveyance of all materils to site and all labour charges etc complete.
painting two coats with approved exterior emulsion over one coat of prime coat over plastered wall surfaces, ceiling and other new surface including cleaning, preparing the surface curing, scaffolding charges etc complete.
painting two coats over iron work including cost of paint and labour charges etc complete
Provision for wash basin with all accessories
Provision for hand rail
Provision for rcc tank cover slab
Provision for mirror pvc/fiber glass framed 5.50mm thick mirrir, shelf type with hard board backing.
Supply and fixing of doors of size 0.75x1.80 m
Supply and fixing of jolly of size 0.60x0.45 m
Supply and fixing of RCC cover slab for water tank
provision for water closet oriya type
Provision for EWC
Provision for interanl water supply arrangements
provision fo sanitary arrangements
provision fo isoak pit
provision for name board
provision for photo charges
provitions for water supply pipe line from OHT
Earth work Excavation inhard stiff clay soil
cost of supply of PVC Pipe & specials including all labour charges etc, for pumping
Towards labour charges for laying ,cutting, threding jointing of PVC, GI Pipes and
Refilling excavated earth for all labour chrges
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
stage.html
html • 0.02 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .