Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance MIRZAPUR MUMTAZ NAGAR AYODHYA AYODHYA UTTAR PRADESH 224001 | AYODHYA | UTTAR PRADESH | 224001 | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
Tender Value
₹7.7 L
EMD Value
₹8,000
Closing Date
24 Jan 2023, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE EWC AYODHYA
OFFICE OF THE SUPERINTENDING ENGINEER ELECTRICITY WORKS CIRCLE, AYODHYA
07/SE/EWC/AYO/2023-24
2022_MVVNL_763772_2
07/SE/EWC/AYO/2023-24
Open Tender
Electrical Works
Item Rate
30 days
AYODHYA
Please refer Tender documents.
2 documents required · 2 mandatory
₹1,180
SUPERINTENDING ENGINEER, ELECTRICITY WORKS CIRCLE
₹8,000
12 Jan 2024
19 Jan 2023
24 Jan 2023
19 Jan 2023
24 Jan 2023
19 Jan 2023
Amount
Carriage of all the concerning material from Store Centre Under the Jurisdiction of EE, ESD Ayodhya to dump site/JE's Store and from dump site/JE's Store to the site of work.
ACSR Dog Conductor
11 KV Cable 3x300 sq. mm XLPE
11 KV cable jointing kit indoor 3x300 sq.mm. XLPE
11 KV cable jointing kit outdoor 3x 300 sq.mm. XLPE
33 KV Lightening Arrestor
M.S. Channel 125x65,75X75X6 mm Angle (for Structures)
Opening of all the 33 KV Jumpers, Nutral connections, cable connections, opening of earth strips and then shifting of 5 MVA T/F from old plinth to new constructed temporary plinth.
Shifting of 33 KV Jumpers from actual position to the new shifted place along with 11 KV cable and other accessories for maintaining & restoring the S/S Supply.
Repairing of Power Transformer Plinth and toe Wall By brick work and plastering
Special Earthing by way of boring and lowering of "B" class G.I. pipe 50 mm Dia 20mtr long from ground upto the water level and it will be connected to the G.S. strip 50X6 mm ( Providing & laying of G.S. strip including cutting, welding, bending etc.) for equipments(L.A,T/F,C.T., VCB.etc). The earth strip will be welded to the G.I. Pipe. The work also includes Cap & Clamps for pouring water, the cost of all material with all labour & T&P etc. Complete in all respect. (All the material will be supplied by the contractor)
Providing 4 No. of 3 mtr 32mm round bar drive in to earth at mimi 3 mtr distence and connecting it by 50X6 mm MS Flat and connectig to all indor or out door equpment/structure as per instruction of site in charge.( All tha material will be supplied by the contrector.)
Erection and Installation of 33/11 KV 10 MVA Transformer Dragging of 33/11KV 5MVA T/F from Dump site to road site and shifting of the T/F from road site to new constructed plinth distance about 150mtr ,along with loading, unloading and carriage, fixing and fitting of all the accessiories and filling of T/F oil to the desired level and insuring that there is no leakage. Erection and installation of 33/11 Kv, 10 MVA Transformer in a leveled position on the plinth.
Nutral Stand-Fabrication and grouting of M.S. angle 65X65X6 mm in L shape & in proper size and allignment to provide support for the two separate earthing strips for power transformer neutral including supply & fixing of two Nos. Flexible Copper bonds for neutral earthing(All the material will be provided by the contrecter like ms angle, clamps, copper bonds etc.)
33KV Bay Bus Bar & Stringing. Stringing of 33KV Bay Bus Bar by using and laying of ACSR Dog Conductor including making Vertical/Horizontal (Y-shape) jumper connection through PG clamps/Connecter at T/F and connecting all the equipments ( Bus isolator, P.I. , C.T. , VCB, L.A & T/F) with each other through connecting clamps. (All the material will be supplied by the contractor)
Commissioning of 10MVA T/F and associated (33 KV VCB & associated indoor And Out door eqipments and providing Charing Moter and replacement of moter in Ex 33 KV VCB) installed in switchyards complete in all respect upto energising.
Providing of Rubber matting one side chequered and other side plane size
providing of Hand gloves
Digging and lockting the earth mate and earthing T/F body at two Sides by M.S./ G.I Flat. 50X6 mm the job include cutting, bending. (All the material will be supplied by the contractor.)
Painting of Sub Station Structures (Old+New) with one coat of ready mixed primer and 2 coats of AL.Paint of good quality including cost of material, Labour and T&P complete in all respect.
Cable Stand-Fabrication and erection of cable support made of two pieces of M.S. Strip 65x65x6 mm, 3.0 Mtr long joined to each other by means of 5 Nos M.S. Flat 50x6 mm pieces of size 150 mm long each by welding at equal intervals as per drawing and grouting in a block of size 300x300x700 mm complete. This includes providing of four Nos. M.S.clamp made of M.S. flat and 03 no. of post insulater for holding the cable including nuts and Bolts and fixing of XLPE cable.
H.T. Cable Laying Laying & dressing of 11 KV, 3x300 Sq.mm XLPE cable underground from 5 MVA T/F to 11 KV incoming switchgear in the trench 450mm wide, 900mm deep, providing 150mm fine sand cushion bench and 150mm fine sand cushion above the cable. The cable shall be duly protected by 1st class bricks two either side and third on top of the cables, laid in series one after the other, the work includes supplying of fine sand and bricks, refilling and ramming of the left out soil, closing the trench and leveling. Spare cable shall be left and buried in the trench in the safe of rings at both ends. Cable laying work includes unrolling, cutting, meggering and sealing both end of the cable. (All the material will be supplied by the contractor)
Installation of Heat Shrinkable Type cable jointing kits O/D end Termination and S/T Joint suitable for 11 KV XLPE cable confirming to IS ESI-09-13-IS-13573 of 1992 amendment I&II VDE-0278 of latest version there of if any.
Installation of Lightening Arrestors Assembling and installation/ mounting of three Nos.Lightening Arrestors on the L.A. structure/ complete with making earth connection ( Separate ) and line connections. The work includes fabrication for proper fixing if required.
M/S INDIA ELECTRICALS
M/s Shukla Enterprises
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .