Tender Value
₹2.8 Cr
EMD Value
₹2.8 L
Closing Date
29 Sept 2026, 5:00 pm2d left
CHIEFCONSTRUCTIONENGINEERCENTRALRANDBCIRCLEBBSR
OFFICE OF THE CHIEF CONSTRUCTION ENGINEER, CENTRAL RANDB CIRCLE, BHUBANESWAR
STMC work for 70 Nos. of Roads for an aggregated length of 28.758 km under BBSR (R and B) Division-I, (Package-I)
2026_EICCL_141129_1
TCN 08 OF 2026-27
Open Tender
Civil Works - Roads
Percentage
365 days
Bhubaneswar
2 documents required · 2 mandatory
₹10,000
₹2.8 L
Yes
29 Sept 2026
14 Sept 2026
29 Sept 2026
14 Sept 2026
29 Sept 2026
14 Sept 2026
14 Sept 2026 - 19 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Flank dressing to proper camber with all leads and lifts, including dressing and levelling the bed and depositing the excavated earth at places away from the work site, including dewatering if required, cost of all labour, T&P and all incidental charges, complete as per approved Drawing and Technical Specifications and as directed by the Engineer-in-Charge.
) ROAD WISE QUANTITY DEATILS -QTY UNIT
1) D01-R02A.A-528 sqm
2) D01-R02B.A-535.2 sqm
3) D01-R03.A-537.6 sqm
4) D01-R07.A-542.4 sqm
5) D01-R09.A-448.2 sqm
6) D01-R10A.A-514.8 sqm
7) D01-R10B.A-493.2 sqm
8) D01-R10C.A-97.8 sqm
9) D01-R10D.A-387 sqm
10) D01-R10E.A-387 sqm
11) D01-R10F.A-66 sqm
12) D01-R10G.A-478.8 sqm
13) D01-R10H.A-450.6 sqm
14) D01-R10I.A-386.4 sqm
15) D01-R10J.A-385.8 sqm
16) D01-R10K.A-385.8 sqm
17) D01-R10L.A-451.2 sqm
18) D01-R10M.A-96 sqm
19) D01-R10N.A-97.8 sqm
20) D01-R10O.A-97.2 sqm
21) D01-R10P.A-96 sqm
22) D01-R10Q.A-353.4 sqm
23) D01-R10R.A-98.4 sqm
24) D01-R10S.A-90.6 sqm
25) D01-R10T.A-97.2 sqm
26) D01-R11A.A-450.6 sqm
27) D01-R12A.A-385.8 sqm
28) D01-R12C.A-632.4 sqm
29) D01-R12D.A-516.6 sqm
30) D01-R12E.A-193.2 sqm
31) D01-R12F.A-264 sqm
32) D01-R12G.A-498.6 sqm
33) D01-R12H.A-88.8 sqm
34) D01-R12I.A-339.6 sqm
35) D01-R12J.A-379.8 sqm
36) D01-R12K.A-384 sqm
37) D01-R12L.A-382.8 sqm
38) D01-R12M.A-289.2 sqm
39) D01-R12N.A-77.4 sqm
40) D01-R12O.A-56.4 sqm
41) D01-R12P.A-83.4 sqm
42) D01-R13C.A-138 sqm
43) D01-R13F.A-327.6 sqm
44) D01-R13G.A-94.2 sqm
45) D01-R17.A-122.4 sqm
46) D01-R21 A.A-116.4 sqm
47) D01-R21 B.A-46.8 sqm
48) D01-R21 C.A-128.4 sqm
49) D01-R21 D.A-62.4 sqm
50) D01-R21 E.A-175.8 sqm
51) D01-R21 F.A-36.6 sqm
52) D01-R21 G.A-27 sqm
53) D01-R21 L.A-84.6 sqm
54) D01-R21 M.A-42.6 sqm
55) D01-R21 N.A-121.2 sqm
56) D01-R21 O.A-83.4 sqm
57) D01-R22 A.A-180 sqm
58) D01-R22 B.A-129.6 sqm
59) D01-R22 C.A-94.8 sqm
60) D01-R22 D.A-104.4 sqm
61) D01-R28.A-525.6 sqm
) Total-15766.8 sqm | 15,766.8 | sqm | 7.07 | ₹1,11,471.28 |
| 2 | Providing and applying tack coat with bitumen emulsion @ 0.20 kg of bitumen per sqm on the prepared bituminous/granular surface, including scraping and cleaning the road surface with mechanical broom, spraying and uniform application of bitumen emulsion, including hire and running charges of all machinery, cost, conveyance, royalty and taxes of all materials, labour, T&P and all incidental charges, complete as per Clause 503 of MoRT&H Specifications for Road & Bridge Works (5th Revision), Technical Specifications and as directed by the Engineer-in-Charge.) -
) ROAD WISE QUANTITY DEATILS -QTY UNIT
1) D01-R02A.A-1884.96 Sqm
2) D01-R02B.A-1273.78 Sqm
3) D01-R03.A-1919.23 Sqm
4) D01-R07.A-968.18 Sqm
5) D01-R09.A-800.04 Sqm
6) D01-R10A.A-918.92 Sqm
7) D01-R10B.A-880.36 Sqm
8) D01-R10C.A-137.16 Sqm
9) D01-R10D.A-542.77 Sqm
10) D01-R10E.A-690.8 Sqm
11) D01-R10F.A-92.57 Sqm
12) D01-R10G.A-457.85 Sqm
13) D01-R10H.A-804.32 Sqm
14) D01-R10I.A-289.03 Sqm
15) D01-R10J.A-688.65 Sqm
16) D01-R10K.A-541.08 Sqm
17) D01-R10L.A-805.39 Sqm
18) D01-R10M.A-134.64 Sqm
19) D01-R10N.A-137.16 Sqm
20) D01-R10O.A-136.32 Sqm
21) D01-R10P.A-134.64 Sqm
22) D01-R10Q.A-630.82 Sqm
23) D01-R10R.A-175.64 Sqm
24) D01-R10S.A-154.02 Sqm
25) D01-R10T.A-136.32 Sqm
26) D01-R11A.A-975.53 Sqm
27) D01-R12A.A-368.92 Sqm
28) D01-R12C.A-1128.83 Sqm
29) D01-R12D.A-922.13 Sqm
30) D01-R12E.A-184.75 Sqm
31) D01-R12F.A-252.45 Sqm
32) D01-R12G.A-476.79 Sqm
33) D01-R12H.A-84.92 Sqm
34) D01-R12I.A-324.74 Sqm
35) D01-R12J.A-363.18 Sqm
36) D01-R12K.A-367.2 Sqm
37) D01-R12L.A-366.05 Sqm
38) D01-R12M.A-276.55 Sqm
39) D01-R12N.A-74.01 Sqm
40) D01-R12O.A-53.93 Sqm
41) D01-R12P.A-79.75 Sqm
42) D01-R13F.A-334.15 Sqm
43) D01-R13G.A-96.08 Sqm
44) D01-R17.A-120.38 Sqm
45) D01-R21 A.A-207.77 Sqm
46) D01-R21 B.A-83.54 Sqm
47) D01-R21 C.A-229.19 Sqm
48) D01-R21 D.A-111.38 Sqm
49) D01-R21 E.A-313.8 Sqm
50) D01-R21 F.A-65.33 Sqm
51) D01-R21 G.A-48.2 Sqm
52) D01-R21 L.A-151.01 Sqm
53) D01-R21 M.A-76.04 Sqm
54) D01-R21 N.A-216.34 Sqm
55) D01-R21 O.A-148.87 Sqm
56) D01-R22 A.A-321.3 Sqm
57) D01-R22 B.A-231.34 Sqm
58) D01-R22 C.A-169.22 Sqm
59) D01-R22 D.A-186.35 Sqm
60) D01-R28.A-540.58 Sqm
) Total-25285.25 Sqm | 25,285.25 | sqm | 18.53 | ₹4,68,535.68 |
| 3 | Providing & Laying B.U.S.G. of 75mm thick in two layer using tack coat 3.0kg/10 sqm 25mm to 40mm size B.H.G.C.B.metal of 0.45cum & 12.0kg of 80/100 penetration grade of bitumen in one layer with 0.12 cum of 12mm size B.H.G.C.B.chips as key stone per 10sqm and laying & spreadig including heating, pouring and spreading bitumen &materials after cleaning the road surface and rolling with PRR including hire charges of PRR & cost, conveyance, royality of all materials & cost of T& P, labour charges etc complete as per specifications and direction of Engineer In Charge) -
) ROAD WISE QUANTITY DEATILS -QTY UNIT
1) D01-R02A.A-616 sqm
2) D01-R02B.A-356.8 sqm
3) D01-R03.A-627.2 sqm
4) D01-R07.A-316.4 sqm
5) D01-R09.A-261.45 sqm
6) D01-R10A.A-300.3 sqm
7) D01-R10B.A-287.7 sqm
8) D01-R10C.A-44.83 sqm
9) D01-R10D.A-177.38 sqm
10) D01-R10E.A-225.75 sqm
11) D01-R10F.A-30.25 sqm
12) D01-R10G.A-149.63 sqm
13) D01-R10H.A-262.85 sqm
14) D01-R10I.A-212.52 sqm
15) D01-R10J.A-225.05 sqm
16) D01-R10K.A-176.83 sqm
17) D01-R10L.A-263.2 sqm
18) D01-R10M.A-44 sqm
19) D01-R10N.A-44.83 sqm
20) D01-R10O.A-44.55 sqm
21) D01-R10P.A-44 sqm
22) D01-R10Q.A-206.15 sqm
23) D01-R10R.A-57.4 sqm
24) D01-R10S.A-75.5 sqm
25) D01-R10T.A-44.55 sqm
26) D01-R11A.A-375.5 sqm
27) D01-R12A.A-120.56 sqm
28) D01-R12C.A-368.9 sqm
29) D01-R12D.A-301.35 sqm
30) D01-R12F.A-82.5 sqm
31) D01-R12E.A-60.38 sqm
32) D01-R12G.A-155.81 sqm
33) D01-R12H.A-27.75 sqm
34) D01-R12I.A-106.13 sqm
35) D01-R12J.A-118.69 sqm
36) D01-R12K.A-120 sqm
37) D01-R12L.A-119.63 sqm
38) D01-R12M.A-90.38 sqm
39) D01-R12N.A-24.19 sqm
40) D01-R12O.A-17.63 sqm
41) D01-R12P.A-26.06 sqm
42) D01-R13F.A-109.2 sqm
43) D01-R13G.A-31.4 sqm
44) D01-R17.A-54 sqm
45) D01-R21 A.A-67.9 sqm
46) D01-R21 B.A-27.3 sqm
47) D01-R21 C.A-74.9 sqm
48) D01-R21 D.A-36.4 sqm
49) D01-R21 E.A-102.55 sqm
50) D01-R21 F.A-21.35 sqm
51) D01-R21 G.A-15.75 sqm
52) D01-R21 L.A-49.35 sqm
53) D01-R21 M.A-24.85 sqm
54) D01-R21 N.A-70.7 sqm
55) D01-R21 O.A-48.65 sqm
56) D01-R22 A.A-105 sqm
57) D01-R22 B.A-75.6 sqm
58) D01-R22 C.A-55.3 sqm
59) D01-R22 D.A-60.9 sqm
60) D01-R28.A-240.9 sqm
) Total-8482.58 sqm | 8,482.58 | sqm | 678.54 | ₹57,55,769.83 |
| 4 | Providing and laying Bituminous Concrete (BC) Grade 2 using crushed aggregates of specified grading, premixed with bituminous binder @ 5.4 percent by weight of total mix and approved mineral filler, conforming to the requirements of MoRTH Specifications for Road and Bridge Works, Clause 509 and the approved Job Mix Formula (JMF); transporting the hot mix to the work site, laying with a hydrostatic paver finisher fitted with sensor control to the required grade, level, camber and alignment, and compacting with smooth-wheeled, vibratory and tandem rollers to achieve the specified density and compaction. The item shall include the cost of all materials, aggregates, bituminous binder, filler, labour, transportation, loading and unloading, T&P, taxes, royalty, fuel, hire andRoad and Bridge Works, Clause 509 and the approved Job Mix Formula (JMF); transporting the hot mix to the work site, laying with a hydrostatic paver finisher fitted with sensor control to the required grade, level, camber and alignment, and compacting with smooth-wheeled, vibratory and tandem rollers to achieve the specified density and compaction. The item shall include the cost of all materials, aggregates, bituminous binder, filler, labour, transportation, loading and unloading, T&P, taxes, royalty, fuel, hire and running charges of all plant and machinery, including paver finisher, rollers, hot-mix plant and other equipment, necessary for completion of the work, complete in all respects as directed by the Engineer-in-Charge.
) -
) ROAD WISE QUANTITY DEATILS -QTY UNIT
1) D01-R02A.A-56.55 cum
2) D01-R02B.A-38.21328 cum
3) D01-R03.A-57.58 cum
4) D01-R07.A-29.05 cum
5) D01-R09.A-24 cum
6) D01-R10A.A-27.56754 cum
7) D01-R10B.A-26.41086 cum
8) D01-R10C.A-4.114935 cum
9) D01-R10D.A-16.283025 cum
10) D01-R10E.A-20.72385 cum
11) D01-R10F.A-2.77695 cum
12) D01-R10G.A-13.735575 cum
13) D01-R10H.A-24.12963 cum
14) D01-R10I.A-16.25778 cum
15) D01-R10J.A-20.65959 cum
16) D01-R10K.A-16.232535 cum
17) D01-R10L.A-24.16176 cum
18) D01-R10M.A-4.0392 cum
19) D01-R10N.A-4.114935 cum
20) D01-R10O.A-3.544398 cum
21) D01-R10P.A-4.0392 cum
22) D01-R10Q.A-18.92457 cum
23) D01-R10R.A-5.26932 cum
24) D01-R10S.A-4.621 cum
25) D01-R10T.A-4.08969 cum
26) D01-R11A.A-25.853 cum
27) D01-R12A.A-11.07 cum
28) D01-R12C.A-33.865 cum
29) D01-R12D.A-27.66 cum
30) D01-R12F.A-7.574 cum
31) D01-R12G.A-14.3 cum
32) D01-R12E.A-5.542 cum
33) D01-R12H.A-2.55 cum
34) D01-R12I.A-9.74 cum
35) D01-R12J.A-10.9 cum
36) D01-R12K.A-11.02 cum
37) D01-R12L.A-11 cum
38) D01-R12M.A-8.3 cum
39) D01-R12N.A-2.22 cum
40) D01-R12O.A-1.618 cum
41) D01-R12P.A-2.4 cum
42) D01-R18.A-41.84703 cum
43) D01-R13F.A-10.02456 cum
44) D01-R13G.A-2.88252 cum
45) D01-R17.A-3.611412 cum
46) D01-R19H.A-4.8195 cum
47) D01-R19G.A-5.72832 cum
48) D01-R19F.A-0.66555 cum
49) D01-R19E.A-2.9835 cum
50) D01-R19D.A-5.17752 cum
51) D01-R19C.A-13.27428 cum
52) D01-R19B.A-3.22218 cum
53) D01-R19A.A-7.95906 cum
54) D01-R21 A.A-6.233 cum
55) D01-R21 B.A-2.506 cum
56) D01-R21 C.A-6.876 cum
57) D01-R21 D.A-3.342 cum
58) D01-R21 E.A-9.414 cum
59) D01-R21 F.A-1.96 cum
60) D01-R21 G.A-1.446 cum
61) D01-R21 L.A-4.53 cum
62) D01-R21 M.A-2.281 cum
63) D01-R21 N.A-6.49 cum
64) D01-R21 O.A-4.466 cum
65) D01-R22 A.A-9.639 cum
66) D01-R22 B.A-6.94 cum
67) D01-R22 C.A-5.077 cum
68) D01-R22 D.A-5.591 cum
69) D01-R28.A-22.11462 cum
) Total-853.802675 cum | 853.8 | cum | 13,873.51 | ₹1,18,45,240.3 |
| 5 | Providing, laying, spreading & compacting graded stone aggregate to wet mix macadam specification including premixing the material at OMC in mechanical mix plant, carriage of mixed material to site, laying in uniform layers on well prepared surface & compacting to achieve the desired density including cost, conveyance, royality of all materials & cost of all labour, machinery etc complete as per approved Drawing & Technical Specifications and Clause -406 of MoRT&H Specifications for Road & Bridge works (5th Revision)) -
) ROAD WISE QUANTITY DEATILS -QTY UNIT
1) D01-R18.A-13.94901 cum
2) D01-R19H.A-1.6065 cum
3) D01-R19G.A-1.90944 cum
4) D01-R13G.A-0.96084 cum
5) D01-R17.A-2.0655 cum
) Total-20.49129 cum | 20.49 | cum | 2,670.02 | ₹54,712.18 |
| 6 | Crack Filling : Filling of crack using slow curing bitumen emulsion and applying crusher dust in case crack are wider then 3 mm.) -
) ROAD WISE QUANTITY DEATILS -QTY UNIT
1) D01-R19H.A-3.5 Rmt
2) D01-R19G.A-4.16 Rmt
) Total-7.66 Rmt | 7.66 | rm | 4.58 | ₹35.08 |
| 7 | Painting one coat with synthetic enamel paint of approved make and shade on any elevation of road kerbs, parapets and guard posts, including preparation of the surface, cleaning, removal of dirt, dust and loose material, application of paint uniformly to the required finish, and including the cost of all paints, materials, labour, tools and equipment, scaffolding/ladders wherever required to complete in all respects as per the Technical Specifications and Clause 803 of MoRT&H Specifications for Road and Bridge Works (5th Revision) and as directed by the Engineer-in-Charge.) -
) ROAD WISE QUANTITY DEATILS -QTY UNIT
1) D01-R02A.A-158.4 Sqm
2) D01-R02B.A-107.04 Sqm
3) D01-R03.A-161.28 Sqm
4) D01-R07.A-162.72 Sqm
5) D01-R09.A-134.46 Sqm
6) D01-R10A.A-154.44 Sqm
7) D01-R10B.A-147.96 Sqm
8) D01-R10C.A-29.34 Sqm
9) D01-R10D.A-116.1 Sqm
10) D01-R10E.A-116.1 Sqm
11) D01-R10F.A-19.8 Sqm
12) D01-R10G.A-95.76 Sqm
13) D01-R10H.A-135.18 Sqm
14) D01-R10I.A-115.92 Sqm
15) D01-R10J.A-115.74 Sqm
16) D01-R10K.A-115.74 Sqm
17) D01-R10L.A-135.36 Sqm
18) D01-R10M.A-28.8 Sqm
19) D01-R10N.A-29.34 Sqm
20) D01-R10O.A-4.86 Sqm
21) D01-R10P.A-28.8 Sqm
22) D01-R10Q.A-106.02 Sqm
23) D01-R10R.A-29.52 Sqm
24) D01-R10S.A-27.18 Sqm
25) D01-R10T.A-29.16 Sqm
26) D01-R11A.A-45.06 Sqm
27) D01-R12A.A-115.74 Sqm
28) D01-R12C.A-189.72 Sqm
29) D01-R12D.A-154.98 Sqm
30) D01-R12F.A-52.8 Sqm
31) D01-R12G.A-99.72 Sqm
32) D01-R12H.A-17.76 Sqm
33) D01-R12E.A-38.64 Sqm
34) D01-R12I.A-67.92 Sqm
35) D01-R12J.A-75.96 Sqm
36) D01-R12K.A-76.8 Sqm
37) D01-R12L.A-76.56 Sqm
38) D01-R12M.A-57.84 Sqm
39) D01-R12N.A-15.48 Sqm
40) D01-R12O.A-11.28 Sqm
41) D01-R12P.A-16.68 Sqm
42) D01-R13F.A-98.28 Sqm
43) D01-R13G.A-28.26 Sqm
44) D01-R17.A-24.48 Sqm
45) D01-R19H.A-31.5 Sqm
46) D01-R19G.A-37.44 Sqm
47) D01-R19F.A-5.22 Sqm
48) D01-R19E.A-23.4 Sqm
49) D01-R19D.A-33.84 Sqm
50) D01-R19C.A-86.76 Sqm
51) D01-R19B.A-21.06 Sqm
52) D01-R19A.A-52.02 Sqm
53) D01-R21 A.A-34.92 Sqm
54) D01-R21 B.A-14.04 Sqm
55) D01-R21 C.A-38.52 Sqm
56) D01-R21 D.A-18.72 Sqm
57) D01-R21 E.A-52.74 Sqm
58) D01-R21 F.A-10.98 Sqm
59) D01-R21 G.A-8.1 Sqm
60) D01-R21 L.A-25.38 Sqm
61) D01-R21 M.A-12.78 Sqm
62) D01-R21 N.A-36.36 Sqm
63) D01-R21 O.A-25.02 Sqm
64) D01-R22 A.A-54 Sqm
65) D01-R22 B.A-38.88 Sqm
66) D01-R22 C.A-28.44 Sqm
67) D01-R22 D.A-31.32 Sqm
68) D01-R28.A-157.68 Sqm
) Total-4448.1 Sqm | 4,448.1 | sqm | 87.43 | ₹3,88,897.38 |
| 8 | Cleaning rubbish,sludge,weeds cum liquid earth mud etc. from RCC box drain covered nikasi etc. by mathor labour after removing concrete slab/manhole cover etc, without damaging the same & refixing the same properly after cleanig as necessary & removing the sludge etc by using iron pans,buckets including all labours,tools & plants including expulation of impur inflamable/asphyxiating gases from the drain etc & removing the spoila in dry condition & disposing the same by truck beyond the ares of municipality corporation/municipality/NAC/Industrial town ship authority etc. for uch disposal including the cost of loading,unloading,transportation & making arrangement of necessary land for disposal,spreading & levelling as necessart etc. & cleanig the road sides in all respects, complete as per direction of Engineer-in-charge(Land for disposal to be arranged by the contractor)(payment will be made on the basis of actual stack measurement of spoils in dray condition at road side(As per practical field observations).) -
) ROAD WISE QUANTITY DEATILS -QTY UNIT
1) D01-R02A.A-17.6 Rmt
2) D01-R02B.A-44.6 Rmt
3) D01-R03.A-17.92 Rmt
4) D01-R07.A-9.04 Rmt
5) D01-R09.A-7.47 Rmt
6) D01-R10A.A-8.58 Rmt
7) D01-R10B.A-8.22 Rmt
8) D01-R10C.A-1.63 Rmt
9) D01-R10D.A-6.45 Rmt
10) D01-R10E.A-6.45 Rmt
11) D01-R10F.A-1.1 Rmt
12) D01-R10G.A-7.98 Rmt
13) D01-R10H.A-7.51 Rmt
14) D01-R10I.A-6.44 Rmt
15) D01-R10J.A-6.43 Rmt
16) D01-R10K.A-6.43 Rmt
17) D01-R10L.A-7.52 Rmt
18) D01-R10M.A-1.6 Rmt
19) D01-R10N.A-1.63 Rmt
20) D01-R10O.A-1.62 Rmt
21) D01-R10P.A-1.6 Rmt
22) D01-R10Q.A-5.89 Rmt
23) D01-R10R.A-1.64 Rmt
24) D01-R10S.A-1.51 Rmt
25) D01-R10T.A-1.62 Rmt
26) D01-R11A.A-7.51 Rmt
27) D01-R12A.A-6.43 Rmt
28) D01-R12C.A-10.54 Rmt
29) D01-R12D.A-8.61 Rmt
30) D01-R12F.A-4.4 Rmt
31) D01-R12G.A-8.31 Rmt
32) D01-R12H.A-1.48 Rmt
33) D01-R12I.A-5.66 Rmt
34) D01-R12E.A-3.22 Rmt
35) D01-R12J.A-6.33 Rmt
36) D01-R12K.A-6.4 Rmt
37) D01-R12L.A-6.38 Rmt
38) D01-R12M.A-4.82 Rmt
39) D01-R12N.A-1.29 Rmt
40) D01-R12O.A-0.94 Rmt
41) D01-R12P.A-1.39 Rmt
42) D01-R13C.A-1.15 Rmt
43) D01-R13F.A-10.92 Rmt
44) D01-R17.A-2.04 Rmt
45) D01-R19H.A-1.75 Rmt
46) D01-R19G.A-2.08 Rmt
47) D01-R19F.A-0.29 Rmt
48) D01-R19E.A-1.3 Rmt
49) D01-R19D.A-1.88 Rmt
50) D01-R19C.A-4.82 Rmt
51) D01-R19B.A-1.17 Rmt
52) D01-R19A.A-2.89 Rmt
53) D01-R21 A.A-1.94 Rmt
54) D01-R21 B.A-0.78 Rmt
55) D01-R21 C.A-2.14 Rmt
56) D01-R21 D.A-1.04 Rmt
57) D01-R21 E.A-2.93 Rmt
58) D01-R21 F.A-0.61 Rmt
59) D01-R21 G.A-0.45 Rmt
60) D01-R21 L.A-1.41 Rmt
61) D01-R21 M.A-0.71 Rmt
62) D01-R21 N.A-2.02 Rmt
63) D01-R21 O.A-1.39 Rmt
64) D01-R22 A.A-3 Rmt
65) D01-R22 B.A-2.16 Rmt
66) D01-R22 C.A-1.58 Rmt
67) D01-R22 D.A-1.74 Rmt
68) D01-R28.A-8.76 Rmt
) Total-335.14 Rmt | 335.14 | rm | 286 | ₹95,850.04 |
| 9 | Providing and laying R.C.C. M-25 grade concrete in drain Wall and cover slab using 20 mm to 10 mm downgraded hard black granite crusher-broken aggregates, including centering and shuttering, mixing, laying, compacting, curing, finishing, machinery, materials, labour, T&P, conveyance, royalty, taxes and all incidental charges, complete as per approved drawing, Technical Specifications, relevant Clauses of Sections 1500, 1600, 1700 & 2700 of MoRT&H Specifications for Road & Bridge Works (5th Revision), and as directed by the Engineer-in-Charge. ) -
) ROAD WISE QUANTITY DEATILS -QTY UNIT
1) D01-R02A.A-6.6 cum
2) D01-R02B.A-2.01 cum
3) D01-R03.A-6.72 cum
4) D01-R07.A-7.65 cum
5) D01-R09.A-5.71 cum
6) D01-R10A.A-6.56 cum
7) D01-R10B.A-6.29 cum
8) D01-R10C.A-1.03 cum
9) D01-R10D.A-4.93 cum
10) D01-R10E.A-4.93 cum
11) D01-R10F.A-0.84 cum
12) D01-R10G.A-3.95 cum
13) D01-R10H.A-5.75 cum
14) D01-R10I.A-3.19 cum
15) D01-R10J.A-4.92 cum
16) D01-R10K.A-4.92 cum
17) D01-R10L.A-5.75 cum
18) D01-R10M.A-1.22 cum
19) D01-R10N.A-1.25 cum
20) D01-R10O.A-0.8 cum
21) D01-R10P.A-0.92 cum
22) D01-R10Q.A-4.51 cum
23) D01-R10R.A-1.25 cum
24) D01-R10S.A-0.63 cum
25) D01-R10T.A-1.02 cum
26) D01-R11A.A-1.69 cum
27) D01-R12A.A-4.92 cum
28) D01-R12C.A-8.06 cum
29) D01-R12D.A-6.59 cum
30) D01-R12E.A-2.03 cum
31) D01-R12F.A-3.13 cum
32) D01-R12G.A-6.86 cum
33) D01-R12H.A-0.73 cum
34) D01-R12I.A-3.57 cum
35) D01-R12J.A-4.5 cum
36) D01-R12K.A-4.55 cum
37) D01-R12L.A-4.54 cum
38) D01-R12M.A-3.04 cum
39) D01-R12N.A-0.64 cum
40) D01-R12O.A-0.23 cum
41) D01-R12P.A-0.69 cum
42) D01-R13F.A-1.23 cum
43) D01-R13G.A-0.35 cum
44) D01-R17.A-0.46 cum
45) D01-R18.A-2.28 cum
46) D01-R13C.A-0.26 cum
47) D01-R19H.A-0.39 cum
48) D01-R19G.A-0.47 cum
49) D01-R19F.A-0.07 cum
50) D01-R19E.A-0.29 cum
51) D01-R19D.A-0.42 cum
52) D01-R19C.A-1.08 cum
53) D01-R19B.A-0.26 cum
54) D01-R19A.A-0.65 cum
55) D01-R21 A.A-1.64 cum
56) D01-R21 B.A-0.66 cum
57) D01-R21 C.A-1.81 cum
58) D01-R21 D.A-0.88 cum
59) D01-R21 E.A-2.48 cum
60) D01-R21 F.A-0.52 cum
61) D01-R21 G.A-0.38 cum
62) D01-R21 L.A-1.19 cum
63) D01-R21 M.A-0.6 cum
64) D01-R21 N.A-1.71 cum
65) D01-R21 O.A-1.18 cum
66) D01-R22 A.A-2.54 cum
67) D01-R22 B.A-1.83 cum
68) D01-R22 C.A-1.34 cum
69) D01-R22 D.A-1.47 cum
70) D01-R28.A-6.7 cum
) Total-184.26 cum | 184.26 | cum | 8,951.33 | ₹16,49,372.07 |
| 10 | Supplying, fitting and placing uncoated HYSD steel reinforcement bars of grade Fe-415/Fe-500/Fe-550 (SAIL or any other approved make) of approved manufacturer, as per approved Drawing and Technical Specifications and Sections 1600 & 1900 of MoRT&H Specifications for Road & Bridge Works (5th Revision), including cutting, bending, placing and fixing in position with 18 to 20 gauge binding wire, including cost, conveyance and taxes of all materials, binding wire, labour, T&P and all incidental charges, complete in all respects as per Drawing and Technical Specifications and as directed by the Engineer-in-Charge. The weight of reinforcement shall be calculated on the basis of IS 1732. Wastage, overlaps, couplings, welded joints, space bars, chairs, stays, hangers and annealed steel wires or other methods of binding and placing shall not be considered for payment. ) -
) ROAD WISE QUANTITY DEATILS -QTY UNIT
1) D01-R02A.A-4.62 Qntl
2) D01-R02B.A-1.4 Qntl
3) D01-R03.A-4.7 Qntl
4) D01-R07.A-5.35 Qntl
5) D01-R09.A-4 Qntl
6) D01-R10A.A-4.59 Qntl
7) D01-R10B.A-4.4 Qntl
8) D01-R10C.A-0.72 Qntl
9) D01-R10D.A-3.45 Qntl
10) D01-R10E.A-3.45 Qntl
11) D01-R10F.A-0.59 Qntl
12) D01-R10G.A-2.77 Qntl
13) D01-R10H.A-4.02 Qntl
14) D01-R10I.A-2.23 Qntl
15) D01-R10J.A-3.44 Qntl
16) D01-R10K.A-3.44 Qntl
17) D01-R10L.A-4.03 Qntl
18) D01-R10M.A-0.86 Qntl
19) D01-R10N.A-0.87 Qntl
20) D01-R10O.A-0.56 Qntl
21) D01-R10P.A-0.65 Qntl
22) D01-R10Q.A-3.15 Qntl
23) D01-R10R.A-0.88 Qntl
24) D01-R10S.A-0.52 Qntl
25) D01-R10T.A-0.71 Qntl
26) D01-R11A.A-1.18 Qntl
27) D01-R12A.A-3.44 Qntl
28) D01-R12C.A-5.64 Qntl
29) D01-R12D.A-4.61 Qntl
30) D01-R12E.A-1.42 Qntl
31) D01-R12F.A-2.19 Qntl
32) D01-R12G.A-4.8 Qntl
33) D01-R12H.A-0.51 Qntl
34) D01-R12I.A-2.5 Qntl
35) D01-R12J.A-3.15 Qntl
36) D01-R12K.A-3.19 Qntl
37) D01-R12L.A-3.18 Qntl
38) D01-R12M.A-2.13 Qntl
39) D01-R12N.A-0.45 Qntl
40) D01-R12O.A-0.16 Qntl
41) D01-R12P.A-0.48 Qntl
42) D01-R13F.A-0.86 Qntl
43) D01-R13G.A-0.25 Qntl
44) D01-R17.A-0.32 Qntl
45) D01-R18.A-1.6 Qntl
46) D01-R13C.A-0.18 Qntl
47) D01-R19H.A-0.28 Qntl
48) D01-R19G.A-0.33 Qntl
49) D01-R19F.A-0.05 Qntl
50) D01-R19E.A-0.2 Qntl
51) D01-R19D.A-0.3 Qntl
52) D01-R19C.A-0.76 Qntl
53) D01-R19B.A-0.18 Qntl
54) D01-R19A.A-0.46 Qntl
55) D01-R21 A.A-1.15 Qntl
56) D01-R21 B.A-0.46 Qntl
57) D01-R21 C.A-1.27 Qntl
58) D01-R21 D.A-0.62 Qntl
59) D01-R21 E.A-1.74 Qntl
60) D01-R21 F.A-0.36 Qntl
61) D01-R21 G.A-0.27 Qntl
62) D01-R21 L.A-0.84 Qntl
63) D01-R21 M.A-0.42 Qntl
64) D01-R21 N.A-1.2 Qntl
65) D01-R21 O.A-0.82 Qntl
66) D01-R22 A.A-1.78 Qntl
67) D01-R22 B.A-1.28 Qntl
68) D01-R22 C.A-0.94 Qntl
69) D01-R22 D.A-1.03 Qntl
70) D01-R28.A-4.69 Qntl
) Total-129.07 Qntl | 129.07 | qtl | 9,507.38 | ₹12,27,117.54 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_2.pdf
PDF • 2.06 MB
Tendernotice_1.pdf
PDF • 1.71 MB
BOQ_609844.xls
BOQ • 0.35 MB
4944C.pdf
PDF • 0.62 MB
C4910.pdf
PDF • 0.80 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .