| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹96,486Accepted-AOC 36 137 THANGAMAPURIPATTINAM METTUR DAM 636 401 | METTUR DAM | SALEM | TAMIL NADU | 636401 | L1 | Accepted-AOC L1 |
| Sl No | Description | Qty | Unit | SRI V M A ENTERPRISES L1 |
|---|---|---|---|---|
| 1.00 | Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT. | 1 | Nos | 25,350 ₹25,350 Lowest |
| 2.00 | Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-A & B. | 1 | Nos | 12,670 ₹12,670 Lowest |
| 3.00 | Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT. | 1 | Nos | 27,320 ₹27,320 Lowest |
| 4.00 | Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP. | 1 | Nos | 9,100 ₹9,100 Lowest |
| 5.00 | Charges for Inspection and checking tightness of generator Phase & Neutral side links. | 1 | Nos | 9,100 ₹9,100 Lowest |
| 6.00 | Charges for Complete cleaning washing of Generating Transformer-3 LAS porcelain housings, support insulators, HV Bushings, radiator banks & UAT 3A, 3B | 1 | Nos | 12,870 ₹12,870 Lowest |
| 7.00 | Material Charges
CRC 500ml | 2 | Nos | 410 ₹820 Lowest |
| 8.00 | Bolt & Nuts various sizes | 4 | Kgs | 160 ₹640 Lowest |
| 9.00 | Cost of consumables (Lumsum) | 1 | Nos | 1,670 ₹1,670 Lowest |
Tender Value
Refer Docs
Closing Date
21 Apr 2025, 2:00 pmClosed
CHIEF ENGINEER/MTPS-I
CHIEF ENGINEER MTPS-I METTUR DAM
MTPS-I ES Circle EM-I SD-III Dismantling and reassembling of HT LT terminal links of generator Transformer-III, UAT-3A and UAT - 3A for conducting statutory testing of TG and GT during Unit-3 Bunker restoration period
2025_EB_537761_1
CE-MTPS-I-SE-ES-EM-I-OT 01-2025-26
Open Tender
Electrical Works
Works
30 days
MTPS-I/METTURDAM
AS PER TENDER SPECIFICATION
4 documents required · 4 mandatory
₹0
Yes
25 Nov 2025
3 Apr 2025
22 Apr 2025
3 Apr 2025
21 Apr 2025
3 Apr 2025
3 Apr 2025 - 21 Apr 2025
Amount
Charges for Dismantling and Assembling of HT/LT Terminal links for 250MVA GT.
Charges for Dismantling and Assembling of HT/LT Terminal links in 16MVA UAT-A & B.
Charges for Dismantling and Assembling of all the inspection covers, Checking tightness & healthiness of support insulators and internal cleaning of 15.75KV Bus duct of GT.
Charges for Inspection & cleaning of Bus PT cubicle, SP cubicle and checking tightness of Bus PT& SP.
Charges for Inspection and checking tightness of generator Phase & Neutral side links.
Charges for Complete cleaning washing of Generating Transformer-3 LAS porcelain housings, support insulators, HV Bushings, radiator banks & UAT 3A, 3B
Material Charges CRC 500ml
Bolt & Nuts various sizes
Cost of consumables (Lumsum)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.PDF
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .