Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹62.1 LAdmitted-Finance | L1 | Admitted-Finance | |
| 2 | L2₹70.3 L+₹8.2 L (13.2%)Admitted-Finance | L2 | Admitted-Finance | |
| 3 | L3₹85.3 L+₹23.2 L (37.3%)Admitted-Finance | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | ALOK KUMAR SINGH L1 | M/S S K ASSOCIATES L2 | M/s Shukla Enterprises L3 |
|---|---|---|---|---|---|---|
| 1.00Part - A ( Material) Following Material Supplied by the Contractor:- | ||||||
| 1.01 | Supply of Pre Cost for A type Pannel | 5 | Nos | 5,000 ₹25,000 | 425 ₹2,125 Lowest | 9,990 ₹49,950 |
| 1.02 | Supply of Pre Cost for B type Pannel | 6 | Nos | 5,000 ₹30,000 | 425 ₹2,550 Lowest | 10,500 ₹63,000 |
| 1.03 | Supply of Pre Cost for C type Pannel | 10 | Nos | 3,000 ₹30,000 | 425 ₹4,250 Lowest | 6,050 ₹60,500 |
| 1.04 | Fuse Set including Channel | 10 | Nos. | 6,000 ₹60,000 | 5,000 ₹50,000 Lowest | 9,900 ₹99,000 |
| 1.05 | LT Clamp | 64 | Nos. | 290 ₹18,560 | 250 ₹16,000 Lowest | 300 ₹19,200 |
| 1.06 | LT Shackle Insulator | 64 | Nos. | 35 ₹2,240 Lowest | 100 ₹6,400 | 40 ₹2,560 |
| 1.07 | Supply a of Copper L Piece for 250 KVA T/F | 42 | Nos. | 700 ₹29,400 Lowest | 1,700 ₹71,400 | 910 ₹38,220 |
| 1.08 | Supply a of Copper L Piece for 400 KVA T/F | 24 | Nos. | 700 ₹16,800 Lowest | 1,700 ₹40,800 | 910 ₹21,840 |
| 1.09 | Supply of HDPE Pipe for laying of 11KV (As per requirement) | 680 | Mtr. | 500 ₹3,40,000 | 10 ₹6,800 Lowest | 1,000 ₹6,80,000 |
Tender Value
₹84 L
EMD Value
₹84,000
Closing Date
7 Sept 2026, 5:00 pmClosed
SE, EDC, Ayodhya
EDC, Civil Lines, Ayodhya.
57/EDC(Ayodhya)/2026-27
2026_MVVNL_1180285_1
57/EDC(Ayodhya)/2026-27
Open Tender
Electrical Works
Item Wise
Ayodhya
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,540
SE, EDC, Ayodhya
₹84,000
21 Sept 2026
28 Aug 2026
8 Sept 2026
28 Aug 2026
7 Sept 2026
28 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Part - A ( Material) Following Material Supplied by the Contractor:- | |||||
| 1.01 | Supply of Pre Cost for A type Pannel | 5 | Nos | 100 | ₹500 |
| 1.02 | Supply of Pre Cost for B type Pannel | 6 | Nos | 101 | ₹606 |
| 1.03 | Supply of Pre Cost for C type Pannel | 10 | Nos | 102 | ₹1,020 |
| 1.04 | Fuse Set including Channel | 10 | Nos. | 103 | ₹1,030 |
| 1.05 | LT Clamp | 64 | Nos. | 104 | ₹6,656 |
| 1.06 | LT Shackle Insulator | 64 | Nos. | 105 | ₹6,720 |
| 1.07 | Supply a of Copper L Piece for 250 KVA T/F | 42 | Nos. | 102 | ₹4,284 |
| 1.08 | Supply a of Copper L Piece for 400 KVA T/F | 24 | Nos. | 103 | ₹2,472 |
| 1.09 | Supply of HDPE Pipe for laying of 11KV (As per requirement) | 680 | Mtr. | 104 | ₹70,720 |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.01 MB
TenderForm.pdf
Tender Documents • 0.96 MB
BOQ_2219438.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .