| 1 | L1₹39.5 LAccepted-Finance | L1 | Accepted-Finance Accepted | |
| 2 | L2₹41.3 L+₹1.8 L (4.47%)Rejected-Finance | L2 | Rejected-Finance Rejected | |
| 3 | L3₹43.2 L+₹3.7 L (9.37%)Rejected-Finance | L3 | Rejected-Finance Rejected |
| Sl No | Description | Qty | Unit | SAS BUILDERS L2 | JEEN BUILDERS L3 | P JAYARAJAN WORKS CONTRACTOR L1 |
|---|---|---|---|---|---|---|
| 1.00Strengthening and 5 year maintenance Paramparavilai - Perumkulam Edaicode Road in Midalam Village Panchayat in Killiyoor Panchayat Union Km 0/0 - 1/100 | ||||||
| 1.01 | Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201. | 792 | Sq.m | 5 ₹3,960 Lowest | 6.23 ₹4,934.16 | 5.6 ₹4,435.2 |
| 1.02 | Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A | 14.4 | Cum | 130 ₹1,872 | 137.85 ₹1,985.04 | 124.7 ₹1,795.68 Lowest |
| 1.03 | Picking the existing metalled surface upto 50mm-100m depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed for the work and including all other incidental charges etc., complete, as per MORTH Specification. | 612.5 | cum | 20 ₹12,250 Lowest | 22.93 ₹14,044.63 | 20.7 ₹12,678.75 |
| 1.04 | collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc | 40.2 | sq.m | 133 ₹5,346.6 | 142.6 ₹5,732.52 | 129.01 ₹5,186.2 Lowest |
| 1.05 | Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete. | 134.99 | cum | 2,220 ₹2,99,677.8 | 2,333.62 ₹3,15,015.36 | 2,111.3 ₹2,85,004.39 Lowest |
| 1.06 | Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it. | 900 | Sq.m | 80 ₹72,000 | 87.04 ₹78,336 | 78.7 ₹70,830 Lowest |
| 1.07 | Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc., | 900 | Sq.m | 18 ₹16,200 Lowest | 20.53 ₹18,477 | 18.5 ₹16,650 |
| 1.08 | BM (Grade-II) 50mm Thick Using VG30 using plastic Waste Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5 | 44.99 | cum | 8,998 ₹4,04,820.02 | 9,450.96 ₹4,25,198.69 | 8,550.8 ₹3,84,700.49 Lowest |
| 1.09 | BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5 | 22.5 | Cum | 11,607 ₹2,61,157.5 | 12,189.4 ₹2,74,261.5 | 11,028.5 ₹2,48,141.25 Lowest |
Tender Value
Refer Docs
EMD Value
₹46,000
Closing Date
1 Jul 2025, 3:00 pmClosed
Project Director DRDA
DRDA Collectorate Kanniyakumari
Strengthening and 5 Year Maintenance of 1 Road work in Package No TN-KKM-04 in Killiyoor Block under NABARD RIDF XXXI 2025-26
2025_RDTN_570628_1
A4/1084/2025(4) dated 02.06.2025
Open Tender
Civil Works - Roads
Item Wise
180 days
Killiyoor Block Area
As per Technical Bid
3 documents required · 3 mandatory
₹0
₹46,000
14 Aug 2025
18 Jun 2025
1 Jul 2025
18 Jun 2025
1 Jul 2025
18 Jun 2025
Amount
Strengthening and 5 year maintenance Paramparavilai - Perumkulam Edaicode Road in Midalam Village Panchayat in Killiyoor Panchayat Union Km 0/0 - 1/100
Clearing and grubbing road land including uprooting wild vegetation, grass, bushes, shrubs, saplings and trees of girth upto 300 mm, removal of stumps of such trees cut earlier and disposal of unserviceable materials and stacking of serviceable material to be used or auctioned, upto a lead of 1000 m including removal and disposal of top organic soil not exceeding 150 mm in thickness as per Technical Specification Clause 201.
Earth work excavation and depositing on bank within initial lead of 10m & initial lift of 2m in hard stiff clay, stiff black cotton, hard red earth, shales, murram, gravel, stoney earth and earth mixed with small size boulders SS .20.A
Picking the existing metalled surface upto 50mm-100m depth as directed by the departmental officers and collecting the picked up salvaged metal and stacking the same for reuse and deposting the debris excluding cost of materials including all labour charges for pickig and all other tools and plants employed for the work and including all other incidental charges etc., complete, as per MORTH Specification.
collection and supply of carted earth from approved quarry an average lead 1km including cost and conveyance of all materials to site anf labour charges etc
Providing and laying spreading and compacting graded stone aggregate to Wet Mix Macadam(WMM) specification including premixing the material with water at OMC in machanical mix plant carriage of mixed material by tipper to site laying in uniform layers 250mm thick with pavers in SubBase/Base course on well prepared surface and compacting with vibratory roller to achieve the desired density including cost of material,labour charges, rentals for machinery, fuel and all other incidental charges etc., complete.
Providing and laying of prime coat using Emulsion at the rate of 7 Kg per ten square meter over the WMM surface preparatory to another bituminous construction over it.
Providing and laying Tack coat over WMM surface(treated with primer) using 2.5Kg of bitumen emulsion RS-1 for 10sqm for preparatory to another bituminous construction over it including cost of material, labour charges, rentals for machinery, fuel and all other incidental charges etc.,
BM (Grade-II) 50mm Thick Using VG30 using plastic Waste Providing, laying 50mm consolidated thick Bituminous Macadam using 0.20cum of 26.50- 13.20mm, 0.43cum of 13.20-2.36mm and 0.08cum of 2.36mm & below size IRC metal with 37 Kgs of VG30 Grade bitumen for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen, aggregate and mixing them in required temperature using Central hot mix plant 20-30ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 50mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory Roller to the required density etc., including labour for attending to paver to site etc., including hire and fuel charges for 20-30t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including all other incidental charges etc., complete as per specification using CMP as per clause 504 of MORTH Rev-5
BC 25/30/40mm Thick (Grade-II) Using VG30 Bitumen and Plastic Waste Providing and laying Bituminous Concrete to 25/30/40mm thick using 0.13 cum of 19.00- 9.50mm, 0.17 cum of 9.50-2.36mm and 0.26 cum of 2.36 and below with 47.28kgs of VG30 bitumen and 3.02Kgs of Waste Plastic for premixing per 10sqm including cost and conveyance of all materials to CMP site, heating the bitumen and aggregate to required temperature and mixing them in required temperature in central hot mix plant 20-30 ton capacity, conveying the mix by tipper trucks to paver site, spreading the mix to uniform thickness of 40mm with mechanical paver to the specified grades and cross sections and consolidated by 8-10 tonne Vibratory to the required density etc., including labour for attending to paver to site etc., including hire charges and fuel charges for 20-30 t CMP with bitumen boiler, tipper trucks, Paver Finisher, Vibratory roller and all other tools and plant required, including fuel and all other incidental charges etc., complete as per specification using CMP as per clause 507 of MORTH Rev-5
Supply and fixing of HECTOMETRE STONE (three faces two lines dressed) of size 1.65 x 0.45 x 0.15m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Supply and fixing of KILOMETRE STONE (three faces two lines dressed) of size 0.75 x 0.23 x 0.10m from approved sources including cost and conveyance to work site and fixing in position as directed by the Departmental Officers including labour and all other incidental charges etc., complete.
Provision for Sign Board
Provision of 15nos Rumble Strips Coverd with Premix bituuminous carpet 15.20mm high at Centrre 250mm wide placed at 1 cm centre at approved at location to controll speed marked with white strips of road marking paint.
HARD BED
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation wit
Earthwork Excavation for foundation in all soils and sub soils to full depth as may be directed except in hard rock requiring blasting but inclusive of shoring and strutting and bailing out water wherever necessary and refilling the side of foundation wit SS 20B
Cement Concrete 1:4:8 one cement, four Crusser Stone sand and eight hard broken stone) using 40mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be suppli
Construction of Granular Sub base by providing well graded material (25 mm to 4.75 mm IRC HBG metal @ 65 %,4.75 to 2.36mm IRC HBG metal @20%&2.36 mm below IRC HBG metal @15%)& (the material passing 425 microns sieve shall have liquid limit and plasticity index not more than 25 & 6% repectively) spreading in uniform layers with motor grader on prepared surface mixing by mix in place method with rotovator at OMC and compacting with three wheel 80-100 KN capacity and finished in accordance with the requirements of the specification and thickness as per approved plans or as directed by the Engineer (Mix -in - place method) .
Supplying and erecting for sides and soffits including supports and strutting for plane surfaces in all cross bracing using mild steel sheets of size 90x60cm and 10 gauge stiffered welded with mild angles of size 25x25x3mm for boarding laid over silver
Cement Concrete 1:3:6 one cement, three Crusser Stone sand and six hard broken stone) using 20mm ISS size hard granite broken metal from approved quarry including cost and conveyance of all materials to site including cost of cement which will be supplie
Construction of Un reinforced dowel jointed at expansion and construction joint only plain cement concrete pavement thickness as per design over a prepared sub base with 43 grade cement or any other type as per clasuse 1501.2.2 M30 (grade) coarse and fine aggregate conforming to IS : 383 maximum size of course aggregate not exceeding 25mm mixed in a concrete mixure of not less than 0.20 cum capacity and appropriate weight bacher using approved mix design laid in approved fixed side form work n(steel channel), Laying, and fixing of 125 micron thick polythine film, wedges, steel plates, including levelling the form work as per drawing), spreding the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and finished in continuous operation including provision of contraction and expansion, construction joint, applying debonding strips, primer, sealant, ndowl bars, near approches, to bridge/culvert and construction joint, admixtures as approved, curing of concrete slab for 14 days, using curing compound (where specified)nand water finishing to lines and grade as per drawing and Technical Specification Clause 1501.
For the First Year from the date of completion of work
For the Second Year from the date of completion of work
For the Third Year from the date of completion of work
For the Fourth Year from the date of completion of work
For the Fifth Year from the date of completion of work
GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package}
SAS BUILDERS (BID ID -1382167)
JEEN BUILDERS (BID ID -1387423)
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .