Loading…
Loading…
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance | Admitted-Finance |
| 2 | Admitted-Finance | Admitted-Finance |
| 3 | Admitted-Finance | Admitted-Finance |
| 4 | Admitted-Finance | Admitted-Finance |
| 5 | Rejected-Technical | Rejected-Technical Technically not qualified |
Tender Value
Refer Docs
EMD Value
₹24,000
Closing Date
1 Jul 2023, 6:00 pmClosed
Executive Engineer Jal Shakti (M) G.W.D. Division
Executive Engineer Jal Shakti (M) G.W.D. Division
Deep Drilling, Development and Stabilization of 200 mm dia mini Tube wells (on EPC Mode) By ODEX
2023_PHE_217663_1
e-NIT No. GWD/23 of 2023-24
Open Tender
Drilling Works
Item Rate
30 days
Seed Multiplication Farm Burmal in District Kathua
As per SBD
10 documents required · 10 mandatory
₹1,000
Yes
Executive Engineer Jal Shakti (M) G.W.D. Division
₹24,000
Yes
office of the Executive Engineer Jal Shakti (M) GW
3 Aug 2023
20 Jun 2023
3 Jul 2023
20 Jun 2023
1 Jul 2023
24 Jun 2023
23 Jun 2023
Amount
Deep Drilling, Development & Stabilization of 200 mm dia mini Tube wells (on EPC Mode) By ODEX Method at Seed Multiplication Farm Burmal in District Kathua of Jammu Province under Capex Budget 2023-24
Setting up of drilling site by way of shifting of requisite machinery and other allied material after making proper approaches as per the requirement at site
Boring/drilling 200 mm dia. Bore Well till sufficient aquifer Zone/discharge is encountered maximum upto 80 meter below ground level by using ODEX Method of drilling and simultaneously driving of 200mm dia. ERW casing pipe after providing fixing of casing drive shoe with first 200 mm dia. ERW casing pipe, complete, as per IS: 2800 (part 1), including collecting samples from different strata, preparing and submitting strata chart/bore log, including hire and running charges of all equipment / tools plants and machineries required for the job, all complete as per direction of Engineer-in-charge. (ERW casing pipe shall be paid separately)
Supplying, assembly (including welding)n, lowering and fixing in vertical position in the bore well. ERW (Electric Resistance Welded) FE 410 Mild Steel Bevelled ended 200 mm dia. Casing Pipes conforming to IS: 4270 of reputed and approved make including painted with outside surface with two coats of anti-corrosive paint of approved brand and manufacture including required hire and labour charges, fitting and accessories, all complete for all depths. The cost includes transportation, loading, unloading and stacking/handling at site. Complete Job.
Development and Stabilization to tube well in accordance with IS: 2800 (part 1) and IS: 11189 to establish maximum rate of usable water yield without sand content (beyond permissible limit) with required capacity air compressor, running the compressor for required time till Well is fully developed measuring yield of well by “V” notch method or any other approved method, measuring static level & draw down etc. by step draw down method collecting water samples and getting tested in approved laboratory, I/C disinfection of tube well, all complete including required hire and labour charges of air compressor tools and accessories, etc. all, as per direction of Engineer-in-charge.
M/s Shiv Drillers & Allied Traders
Hyper Techno Drillers Private LTD
lucky BOREWELL contractor
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .