Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.6 CrAccepted-AOC GRAM KAKNA POST JAITPUR SAHJANWAN DISTRICT GORAKHPUR UTTAR PRADESH | GORAKHPUR | UTTAR PRADESH | 273001 | ₹1.6 Cr | L1 | Accepted-AOC L1 |
| 2 | L2₹1.8 CrRejected-Finance GRAM TINANHARI POST NATHNAGAR THANA MAHULI DISTRICT SANT KABIR NAGAR | AMROHA | UTTAR PRADESH | 244102 | ₹1.8 Cr | L2 | Rejected-Finance L2 |
| 3 | Rejected-Technical CHANDAULI | UTTAR PRADESH | 221009 | - | - | Rejected-Technical As Per Uploaded |
| 4 | Rejected-Technical | - | - | Rejected-Technical As Per Uploaded |
| Sl No | Description | Qty | Unit | M/S ARPNA CONSTRUCTION L1 | SHIVANAND SHUKLA L2 |
|---|---|---|---|---|---|
| 1.00 | Dry Earth work digging in foundation on canal including up to 30 mtr lead and lift up to 1.5 m | 1,985.32 | M3 | 62 ₹1.2 L | 80 ₹1.6 L |
| 2.00 | Preparation of sub grade for lining work including watering, compaction & praparation of surface i/c all labour, T&P etc as per direction of engineer-in-charge. | 10,005.44 | M2 | 15 ₹1.5 L | 10 ₹1.0 L |
| 3.00 | Laying coarse sand as filler material on side slope and bed i/c cost of all material, labour T&P etc required for proper completion of work. | 500.27 | M3 | 600 ₹3.0 L | 2,500 ₹12.5 L |
| 4.00 | Centering and Shuttering for RCC work per sqm.including cost of all material labour T&P etc.required for completion of work | 1,068.19 | M2 | 700 ₹7.5 L | 600 ₹6.4 L |
| 5.00 | Centering and Shuttering for PCC I of sleeper ncluding cost ofshuttering, all labour T&P etc.complete as per direction of engineer-in-charge. | 2,345.53 | M2 | 160 ₹3.8 L | 200 ₹4.7 L |
| 6.00 | Laying CC in 1:1.5:3 with dala crushed stone grit size 4.75 to 20 mm and C-sand & cement including cost of all material, lead, lift, labour, T&P etc.complete as per direction of engineer-in-charge. | 254.74 | M3 | 8,350 ₹21.3 L | 10,000 ₹25.5 L |
| 7.00 | Laying CC in 1:2:4 with dala crushed stone grit size 4.75 to 20 mm and C-sand & cement for sleeper 200x150 including cost of all material, lead, lift, labour, T&P etc.complete as per direction of engineer-in-charge. | 221.5 | M3 | 8,300 ₹18.4 L | 9,000 ₹19.9 L |
| 8.00 | Laying CC in M-15 (1:2:4) with sand stone ballast size 20 mm to 40 mm and C-sand & cement including cost of all material, lead, lift, labour, T&P etc.complete as per direction of engineer-in-charge. | 32.12 | M3 | 8,050 ₹2.6 L | 8,700 ₹2.8 L |
| 9.00 | Cutting bending binding and placing TMT steel for reinforcement in RCC work including cost of binding wire all material labour and T&P etc required for proper completion of work. | 13.72 | MT | 61,000 ₹8.4 L | 72,000 ₹9.9 L |
| 10.00 | Supply and Laying LDPE film 200 micron (1st grade) thick in bed and side slope over filler material including cost of all material, labour T&P etc required for proper completion of work. | 10,005.44 | M2 | 32 ₹3.2 L | 30 ₹3.0 L |
Tender Value
₹2.3 Cr
EMD Value
₹4.6 L
Closing Date
12 Feb 2026, 3:00 pmClosed
S.E, Irrigation Construction Circle, Basti
S.E, Irrigation Construction Circle, Basti
C.C. LINING BETWEEN KM 0.000 TO KM 0.500 AND COUNTER BERM WITH RETAINING WALL BETWEEN KM. 0.500 TO 0.800 OF BANSGAON DY.
2026_UPIDC_1112047_1
08/S.E/2025-26
Open Tender
Civil Works
180 days
Gorakhpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹4,722
₹4.6 L
20 Mar 2026
5 Feb 2026
12 Feb 2026
5 Feb 2026
12 Feb 2026
6 Feb 2026
Dry Earth work digging in foundation on canal including up to 30 mtr lead and lift up to 1.5 m
Preparation of sub grade for lining work including watering, compaction & praparation of surface i/c all labour, T&P etc as per direction of engineer-in-charge.
Laying coarse sand as filler material on side slope and bed i/c cost of all material, labour T&P etc required for proper completion of work.
Centering and Shuttering for RCC work per sqm.including cost of all material labour T&P etc.required for completion of work
Centering and Shuttering for PCC I of sleeper ncluding cost ofshuttering, all labour T&P etc.complete as per direction of engineer-in-charge.
Laying CC in 1:1.5:3 with dala crushed stone grit size 4.75 to 20 mm and C-sand & cement including cost of all material, lead, lift, labour, T&P etc.complete as per direction of engineer-in-charge.
Laying CC in 1:2:4 with dala crushed stone grit size 4.75 to 20 mm and C-sand & cement for sleeper 200x150 including cost of all material, lead, lift, labour, T&P etc.complete as per direction of engineer-in-charge.
Laying CC in M-15 (1:2:4) with sand stone ballast size 20 mm to 40 mm and C-sand & cement including cost of all material, lead, lift, labour, T&P etc.complete as per direction of engineer-in-charge.
Cutting bending binding and placing TMT steel for reinforcement in RCC work including cost of binding wire all material labour and T&P etc required for proper completion of work.
Supply and Laying LDPE film 200 micron (1st grade) thick in bed and side slope over filler material including cost of all material, labour T&P etc required for proper completion of work.
Laying 75 mm thick CC 1:1.5:3 grade with dala stone grit size 4.75 to 20 mm and C-sand & cement for lining by manual in bed and side slope including cost of all material, labour etc. required for proper completion of work. complete as per direction of engineer-in-charge.
Providing and fixing sealing compound in b/w pannel joints i/c cost of all material , labour , T&P with all lead & lift for proper completion of work
E/W in constructing of channels by power transport for a lead up to 1 km including excavation loading unloading stacking ,manual compaction & dressing including all lift shall be applicabale for lead up to 1 km excluding royalty.
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.46 MB
BOQ_2056294.xls
BOQ • 0.29 MB
Buklet.pdf
Tender Documents • 2.98 MB
Download all tender documents and submit your bid