Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Finance 1 BAMANAI LUHETA HATHRAS HATHRAS UTTAR PRADESH 204101 | HATHRAS | UTTAR PRADESH | 204101 | Admitted-Finance |
| 2 | Admitted-Finance 01 NAUJARPUR BASAI KAJI SASNI HATHRAS UTTAR PRADESH 202150 | ALIGARH | UTTAR PRADESH | 202150 | Admitted-Finance |
| 3 | Not Admitted-Fee GIJJROLI AGRA ROAD HATHRAS UTTAR PRADESH 204101 INDIA | HATHRAS | HATHRAS | UTTAR PRADESH | 204101 | Not Admitted-Fee Fee not received |
Tender Value
Refer Docs
EMD Value
₹21,000
Closing Date
29 Apr 2024, 12:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SE, ESWC, ALIGARH
ALIGARH
ESWCA-32/2023-24
2024_DVVNL_921933_2
ESWCA-32/2023-24
Open Tender
Electrical Works
Turn-key
90 days
KASGANJ
Please refer Tender documents.
3 documents required · 3 mandatory
₹3,540
DVVNL WEBSITE
₹21,000
8 May 2024
17 Apr 2024
30 Apr 2024
17 Apr 2024
29 Apr 2024
17 Apr 2024
Amount
Safe Carriage of following store items with loading & unloading at both ends respectively. (under jurisdiction of DVVNL) to praposed site
33/11 KV Power Transformer
(i) 33 KV Pin insulator
(ii) 33 KV pin with nut
ACSR Dog conductor
Switchgears in Control Room
(i) 11KV incoming with CT ratio 600/300/5A, 350 MVA
(ii) 11KV Outgoing with CT ratio 200/100/5A, 350 MVA
(iii) 11 KV VCB Bus Coupler 350 MVA
90 Lbs. Rail pieces for T/F
33 KV Single Transformer Control Panel.
33 KV VCB 800A, 750 MVA
33 KV CT, 200/100/1-1-1A
11 KV 3 Core XLPE Cable Al.
(i) 3x300 Sq.mm
(ii) 3x185 Sq. mm
STP Pole 11 Mtr Long Sp-55
33 KV Bus Type Isolator.
33 KV Post Insulator.
33 KV Lightening Arrestors
Supply Providing of follwoing materials (Decentralized materials) by contractor with all Associatas accessories like all Type Clamps, Nut& Bolts etc.
Structure for 33 KV Bus Type Isolator
Switchgears in Control Room
Structure for Post Insulator.
Structure for 33 KV Lightening Arrestors
(i) 33 KV Fuse Set
(ii) Structure for 33 KV Fuse Set
Plinth & Foundation of 33 KV Bus Type Isolator, Post Insulator, 33 KV Lightening Arrestors, 33 KV Fuse Set as per Respo Noms.
Indoor Equipment Earthing
Laying of 11 KV Cable Including cost of sand & bricks
11 KV Cable Jointing kit. Heat
(i) 3x300 Sq. mm Indoor
(ii) 3x300 Sq. mm Outdoor
(iii) 3x185 Sq. mm Indoor
(iv) 3x185 Sq. mm Outdoor
Making of 11KV cable boxes mounted with switchgears and transformers.
24 Volt battery and battery charger with cabinet.
Control Cable
(i) 4x2.5 Sq. mm.Cu. xlpe
(ii) 2x2.5 Sq. mm.Cu. Xlpe
Power T/F Earthing (water level)
(i) Neutral
(ii) Body
11 KV feeder double pole structure Complete As per Schedule (without pole cost. Pole cost taken in kha)
Painting of Substation Structure
Plinth & foundation of VCB
Plinth & foundation of T/F
Erection of following Material & Miscellaneous Electrical Works. (As Per RESPO Norms) :-
LINE/BUS ISOLATOR STRUCTURE: (3Nos.)
Fabrication of Structure, including cutting, straightening & drilling of holes in Channel/Angle.
Fuse Set/L.A./P.T/POST INSULATOR STRUCTURES (1+1+1):
Fabrication of structure, including cutting, straightening & drilling of holes in Channel/Angle/Joists. M.S.Plate to be fixed on structure of required size.
Plinth for 5 MVA Transformer Qty 01 Nos.
Construction of plinth for 5 MVA, 33/11 KV Transformer of (3.46x4.46x1.0)m (0.50m below ground level and 0.5 m above ground level) as per details & drawing attached (All required matrials provided/Supply by the contractor own his cost):- Excavation of earth in foundation.
Cement concrete in foundation in ratio 1:6:12, Cement, Sand & Brick ballast.
First Class Brick work in ratio 1:4 with Cement & Coarse sand mortar.
Cement concreting inner side of plinth in ratio 1:4:8, Cement, Coarse sand and stone shingle.
M.S.work for re-inforcement 12mm. Tor at a distance of 15Cms. apart, including cutting, bending & binding by wire to each other for making JAL in two layer, 12 to 15Cms. apart. M.S.12mm Tor bar provided by the contractor his own cost.
Fixing of 3.46 Mtr.long, 2No. Rail Pices, 90Lbs, on top of Plinth at proper distance in alignment by C.C.
Cement concrete in ratio 1:2:4, Cement, Coarse sand & Stone shingle, on top of the plinth, including fixing of M.S.Tor Jal.
12mm.thick Cement Plaster in ratio 1:4, Cement & Sand mortar, on all side of plinth.
Neat cement coating 3mm.thick on top surface of plinth.
Plinth for 33 KV V.C.B.
Construction of plinth for the structure of 33 KV VCB & C.T.’s as per details for . (All required materials provided / Supply by the contractor own his cost) :- Excavation of earth of size 2x(2.0x2.0x1.0)m pits for construction of plinth.
Brick Ballast ratio (1:4:8) (cement, sand & brick ballast) for foundation work 2x(2.0x2.0x0.5)m plinth.
R.C.C. work in ratio 1:2:4 (cement, coarse sand & stone grit) of 20m size for making plinth of size 2x(2.0x2.0x1.0)m and grouting of foundation bolts 04 Nos. for 33 KV VCB.
12mm thick plaster with cement mortar in ratio 1:4 (cement & fine sand) of plinth of 0.4m upper side
Earthing of indoor equipment, details as given below:-
Cutting of 32mm.dia M.S. Bar-3Mtr.long and making one end in conical shape by forging process and driving it into the earth at each corner of bridge outside control room and proper welding with M.S.Bars.
Digging of Pits for making Bridge on both side of control room by laying 32mm. dia M.S.Round in rectangular shape. Electric welding on cross joints by providing “U” Clamp in size 25x6mm. of M.S.Flat and inter connecting both by M.S.Round 32mm.dia through control room trench, with over lap joint by providing M.S.Round-12mm dia, on both sides of over lap joints of M.S.Round, by electric welding. All joints shall be painted with black bituminious paint.
Water level earthing by Boring and lowering of G.I. pipe size 40 mm dia & thickness 3mm into the ground at 20 Mtr depth or upto the water level with the lower end of solid copper cone Approx 225 mm long and 750 gm in weight shall be provided and screwed in pipe as well as bringing out a continuous copper wire 6 SWG from the cone up to the ground surface where it will be bolted to the G.I. earth Strip for Transformer neutral connection, the G.I.Earth strip size 50x6mm will be welded to the G.I. pipe and neutral earthing support & other installed equipment in switchyard. All required material provided / supply by the contractor own his cost.
CONSTRUCTION OF CONTROL CABLE TRENCH WITH TRENCH COVER IN SWITCHYARD, AS PER Specifation
Installation of 5 MVA Transformer and other accessories equipments.
Fabrication and erection of neutral earthing L Type support made of G.I. Channel size 100x50mm. Structure shall be 4 Mtr. Long with 1 Mtr. Arms. Structure shall be grouted in ratio 1:3:6 in block size 300x300x700mm and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint work includes connecting neutral bushing rod of power Transformer and G.I. Earthing strip with the help of flexible copper bond, G.I. Bolt and washer.
Fabrication and erection of cable support made of two pieces of G.I. Angle (65x65x6)mm, 2.75 meter long, joined to each other by means of 5 Nos. G.I. Flat (50x6) mm pieces of size 750 mm long each by welding at equal intervals and grouting in a block of size (300x300x700)mm in C.C. 1:3:6 (cement, coarse sand and stone ballast) complete and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint. Work includes providing of three Nos. G.I. clamps made of (50x6)mm G.I. Flat for holding the cable including nuts and bolts.
Fabrication and grouting of G.I. frames 3.60 mt. long for support of copper Bus Bar. Bus Bar will be provided in L.V. side of Power transformer. The G.I. frame shall be made of G.I. channel (100x50)mm in ‘T’ shape. Providing 2 Nos. support of G.I. Angle iron (50x50x6)mm, 0.60mt. long below the top channel, drilling of 3 Nos. hole on the top channel for fixing of 11 KV pin insulator and painted of welding joint with one coat of Ready Mixed primer and Two coat of enamel Aluminium paint and grouting the frame in C.C. ratio 1:3:6 (cement, coarse sand and stone ballast) in a block of size (300x300x700) mm. The work also includes the fixing of 3 Nos. 11 KV pin insulator with pin and binding the copper Bus Bar with the pin insulator by Aluminium binding wire in complete.
Providing & Fabrication of copper bus bar of size (2500x50x6)mm in L.V. side of 5 MVA 33/11 KV, power transformer, Work includes connection of outside bus bar in L.V. side busing rod of Power Transformer and other side with outdoor 11 KV cable box as well as providing empire tape and H.T. tape etc. for proper insulation work. (Supply/Providing by Contractor)
H.T. Power Cable Laying (11 KV 3X300sqmm):
Laying 11 KV, (3x300) mm2 XLPE, Cable from power transformer to 11 KV incoming switch gear in the cable trench 0.45 m wide, 0.90m depth. Providing 150 mm local sand for cushion beneath and 150 mm above the cable (quality of local sand required 0.375 cum/m in length). The cable shall be dully protected by brick. On both side of cable by laying brick vertically and bricks would also be laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cable etc. Spare cable shall be left over and laid in the trenches in shape of 6 m ring at both ends.
Cable Laying (11 KV 3X185sqmm):
Laying 11 KV, 3x185mm2 XLPE, Power cable from outgoing switch gear to 11 KV double poles in the cable trench 0.50m wide, 0.90m depth. Providing 150 thickness mm local sand for cushion beneath and 150mm above the cable (quantity of local sand required 0.375 cubm/m in length). The cable shall be duly protected by brick. On both side of cable by laying bricks vertically and bricks would also be laid horizontally on top of vertically laid bricks along the single cable (minimum 18 Nos. of bricks are to be laid top and outer side along the single cable. The work includes digging of trenches, laying of cable in under ground trenches, joining of terminal’s, back filling of earth and testing and commissioning of power cables etc. Spare cable shall be left over and laid in the trenches in shape of 6m rings at both ends. At the end of feeder cables, where the cable is to be laid across pucca/main road, 100 mm dia G.I. pipe will be weared over the cable in the cable trench for the protection of cable.
Preparation of 11 KV Power Cable Jointing Kits:
Making of 11 KV XLPE Heat shrinkable outdoor jointing kits 3x185Sq.mm/3x300Sq.mm/3x70Sq.mm after duly plumbing and taping of cable, providing, fixing and crimping of proper size good quality lugs
Installation of 24V Battery and Battery Charger:
Assembling and installation of the cabinet of 24V battery and battery charger in switch gear control room including grouting of foundation bolts as per drawing of manufacture, including providing the foundation nuts and bolts of proper size. The electrical connection between battery and battery charge with flexible copper lead of size 7/20 SWG shall be done properly. The work includes installation, wiring upto control panel, testing and commissioning complete in all respect.
Laying of Control Cables (2x2.5)mm2/ (4x2.5)mm :
Laying of different size of (2x2.5)mm2/ (4x2.5)mm2 control cables i.e. from Buchholz realy to Marshalling box Marshalling box to indication protection board in switch gear room, 33 KV CT’s to CT’s Junction Box, 33 KV CT, 33 KV PT, V.C.B. Control Panel Junction Box to 33 KV VCB control panel and control panel to 33 KV VCB outdoor operating mechanism panel from T/F etc. in the cable trench including making proper connection at Buchholz Relay, Marshalling box and indication board as per required for installed equipment.
Erection of 11 KV Feeder Double Pole:
Erection and grouting of 2 Nos. STP-55-11Mtr long for making DP Structure including fabrication fixing of G.I. Channel, G.I.Angle, TPMO, Fuse Set, disc, insulators, pin insulators No. Plate, Danger board, barbed Wire (02 Kg per Pole) etc. the work includes supply and fixing of necessary clamps size 75x10mm with G.I.Nuts bolt & washer, bolts and washers. The work also includes grouting of Double pole support in C.C. 1:3:6 (cement, Core sand & stone ballast) in block of size (0.45m x 0.45 x 1/6 length of the pole) including earthing of Double pole with G.I. earthing rod complete in all respect.
Providing & wearing of 160 mm dia, 3.0 mtr long G.I. pipe in the feeder cable & 33 KV Cable of size of (3x300, 3x185)mm2 XLPE 33KV/11KV power cable before making the outdoor cable boxes. The work includes the sealing of G.I. Pipe, top end and lower end of the pipe is to be buried in to the ground about ½ m and proper dressing of cable etc. The work includes lifting, mounting and clamping of 11 KV feeder cable boxes on the feeder with double pole structure and making connections including supply of cable mounting clamps etc.
Providing & fixing of SMC Danger board & Number Plate at each location as per specification of the drawing. Size 200mmx250mm & 3mm thickness with G.I.Clamp & nut & bolt
Grouting of stay rods (16x1800)mm including all work of excavation, cement concrete in size (0.60x0.60x0.30)m in ratio 1:3:6 cement, sand, 20mm Stone grift) as per drg. Including back filling of soil and proper ramming etc.
Fixing, tightening & nozzling of stay wire with stay rod with the poles of required tension as per drawing, including providing & fixing of Stay Insulators of 11KV and Stay Clamps.
Painting of Structures :
Painting of the all structures with one coat of ready mixed primer and two coats of ISI Mark Aluminium paint after rubbing with sand paper to the surface of the structure including labour and T&P complete in all respect.
Installation of 33 KV Isolators:
Assembling and installation of Bus Isolator on the isolator structure. Adjusting of operating mechanism in proper alignment so as to ensure smooth operation of the same. In case of Line Isolator proper operation of earth links shall also be ensured. The work includes fabrication for proper fixing if required.
Installation of 33 KV Lightning Arrestors:
Assembling and installation/mounting of 3 Nos. lighting arrestors on the L.A.’s structure/terminal gentry, complete with earthing and line connections. The work includes fabrication for proper fixing, if required.
Installation of 33 KV Post Insulators:
Installation of 3 Nos. PI on structure. The work includes fabrication for proper fixing, if required.
Installation of 33 KV Fuse Set:
Assembling and installation of fuse set on the fuse set structure. The work includes fabrication for proper fixing, if required.
Installation of 33 KV VCB :
Assembling and installation of 33 KV VCB on the VCB out door structure on the plinth. Adjustment of operating mechanism in proper alignment for smooth operation of the same. The work also includes fabrication of addition arrangement for proper fixing, if required.
Installation of 33 KV VCB Control Panel for single T/F & Double T/F Control Panel.
Carefully and safely shifting of 33 KV VCB control panel from outside of the switch gear room to inside of the switch gear room, grouting with anchor bolts in the floor, work also includes cutting & proper finishing of floor if necessary for completion of work. Placing and fixing of panel on foundation, bolts of proper size in proper position and alignment.
Installation of 33 KV C.T.’s:
Installation of 3 Nos. C.T.’s on the C.T’s structure. The work includes fabrication for proper fixing, if required to complete the work.
33 KV CT’s Junction Box:
Providing & fixing of junction box of size (400x400x150) mm made of G.I. sheet of 16 SWG in between 33 KV CT’s & control panel. The work also include making proper connection on the junction box and making all connection in between CT’s and control panel complete as per manufacture’s panel drawing including testing and commissioning of work etc. complete the work.
33 KV Bus Bar Jumpering:
Jumpering, including clamping/binding with ACSR Dog conductor/33KV 3x300mm2 XLPE cable with providing P.G.Clamp & other accessories with complet Job.
Bobby Electricals
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .