Executive Engineer -I (Wks)
Executive Engineer -I (Wks), SVPMC HQ
Construction of PCC wall and steps near Shri.Gani house at Atlanta Point, Ward no.05
2026_PMBC_24595_1
03/NIQ/EE-I/Wks/MC/2026-27
Open Tender
Civil Works - Others
Works
60 days
Ward No. 05
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,082
8 Sept 2026
8 Sept 2026
16 Sept 2026
8 Sept 2026
16 Sept 2026
8 Sept 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Demolishing cement concrete manually/ by mechanical means including disposal of material within 50 metres lead as per direction of Engineer - in - charge.
Nominal concrete 1:3:6 or richer mix (including equivalent design mix) | 3 | cum | 100 | ₹300 |
| 2 | Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge.
All kinds of soil | 14.02 | cum | 101 | ₹1,415.62 |
| 3 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:4:8 (1 Cement : 4 coarse sand (zone-III) derived from natural sources : 8 graded stone aggregate 40 mm nominal size derived from natural sources) | 1.15 | cum | 101 | ₹116.05 |
| 4 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level :
1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 40 mm nominal size derived from natural sources) | 3.14 | cum | 101 | ₹317.24 |
| 5 | Providing and laying cement concrete in retaining walls, return walls, walls (any thickness) including attached pilasters, columns, piers, abutments, pillars, posts, struts, buttresses, string or lacing courses, parapets, coping, bed blocks, anchor blocks, plain window sills, fillets, sunken floor etc., up to floor five level, excluding the cost of centering, shuttering and finishing:
1:2:4 (1 Cement : 2 coarse sand (zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) | 6.88 | cum | 101 | ₹694.88 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form work for :
Foundations, footings, bases for columns | 13.14 | sqm | 101 | ₹1,327.14 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form work for :
Retaining walls, return walls, walls (any thickness) including attached pilasters, buttresses, plinth and string courses fillets, kerbs and steps etc. | 23.43 | sqm | 101 | ₹2,366.43 |
| 8 | 12 mm cement plaster of mix :
1:4 (1 cement: 4 fine sand) | 27.3 | sqm | 101 | ₹2,757.3 |
| 9 | Cement concrete flooring 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate) finished with a floating coat of neat cement, including cement slurry, but excluding the cost of nosing of steps etc. complete.
40 mm thick with 20 mm nominal size stone aggregate | 1.2 | sqm | 101 | ₹121.2 |
| 10 | Filling available excavated earth (excluding rock) in trenches, plinth, sides of foundations etc. in layers not exceeding 20cm in depth, consolidating each deposited layer by ramming and watering, lead up to 50 and for all lift. | 2.84 | cum | 101 | ₹287.04 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.98 MB
tenderdocument.pdf
Tender Documents • 0.27 MB
BOQ_26036.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .