| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹3.7 LAdmitted-Fee/PreQual/Technical/Finance | ₹3.7 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹4.2 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.2 L | L2 | Admitted-Fee/PreQual/Technical/Finance |
| 3 | L3₹4.3 LAdmitted-Fee/PreQual/Technical/Finance | ₹4.3 L | L3 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | M CHELLAPPANDI L2 | VASANTHA CONSTRUCTIONS L3 | R.THIRUPATHIRAJ L1 |
|---|---|---|---|---|---|---|
| 1.001. Construction of segregation Composit pit at Valvangi Village and Periyanayagipuram Panchayat | ||||||
| 1.01 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B | 86.18 | m3 | 255.87 ₹22,050.88 Lowest | 263 ₹22,665.34 | 340 ₹29,301.2 |
| 1.02 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete | 4 | m3 | 5,358.63 ₹21,434.52 | 5,522 ₹22,088 | 5,000 ₹20,000 Lowest |
| 1.03 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | 19.99 | m3 | 5,993.58 ₹1,19,811.66 | 6,176 ₹1,23,458.24 | 5,800 ₹1,15,942 Lowest |
| 1.04 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 109.47 | m3 | 275.88 ₹30,200.58 | 282 ₹30,870.54 | 250 ₹27,367.5 Lowest |
| 2.002. Construction of Vermi Composit shed at Valvangi Village and Periyanayagipuram Panchayat | ||||||
| 2.01 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 3.68 | m3 | 255.87 ₹941.6 | 263 ₹967.84 | 120 ₹441.6 Lowest |
| 2.02 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 3.68 | m3 | 5,358.63 ₹19,719.76 | 5,522 ₹20,320.96 | 5,100 ₹18,768 Lowest |
| 2.03 | CC 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site including all labour charges etc complete.., | 2.45 | m3 | 6,619.04 ₹16,216.65 | 6,821 ₹16,711.45 | 6,000 ₹14,700 Lowest |
| 2.04 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | 2.28 | m3 | 5,993.58 ₹13,665.36 | 6,176 ₹14,081.28 | 5,800 ₹13,224 Lowest |
Tender Value
₹4.4 L
EMD Value
₹4,400
Closing Date
20 Aug 2026, 4:00 pmClosed
The Block Development Officer (V.P), Aruppukottai
The Block Development Officer (V.P), Aruppukottai
1.Construction of segregation Composit pit at Valvangi Village and Periyanayagipuram Panchayat 2.Construction of Vermi Composit shed at Valvangi Village and Periyanayagipuram Panchayat
2026_RDTN_690245_1
ROC/SBM- E2/2706/2024 Dated 06.07.2026
Open Tender
Civil Works
Item Wise
90 days
Periayanayagipuram
Please refer Tender documents.
2 documents required · 2 mandatory
₹0
₹4,400
The Block Development Officer (V.P), Aruppukottai
20 Aug 2026
1 Aug 2026
20 Aug 2026
1 Aug 2026
20 Aug 2026
1 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 11. Construction of segregation Composit pit at Valvangi Village and Periyanayagipuram Panchayat | |||||
| 1.01 | Earth work excavation in all clauses of soils with initial lead and lift except hard rock requiring blasting etc., complete for foundation as per SS 20B | 86.18 | m3 | - | - |
| 1.02 | Cement concrete 1:4:8 mix using 40mm ISS HBG metal including all cost and conveyance and all labour charges etc., complete | 4 | m3 | - | - |
| 1.03 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | 19.99 | m3 | - | - |
| 1.04 | Plastering with cement mortar 1:5 mix to 12mm thick including cost and conveyance of all materials to site and all labour charges etc | 109.47 | m3 | - | - |
| 22. Construction of Vermi Composit shed at Valvangi Village and Periyanayagipuram Panchayat | |||||
| 2.01 | Earth work excavation and depositing on bank with in initial lead of 10 m and initial lift of 2m in hard stiff clay, stiff black cotton soil, hard red earth,earth mixed with small sized boulders and hard gravelly soil as per SS 20B | 3.68 | m3 | - | - |
| 2.02 | Cement concrete 1:4:8 mix using 40mm ISS metal including cost and conveyance of all materials to site and all labour charges for mixing,laying and curing etc complete for 10 cum. | 3.68 | m3 | - | - |
| 2.03 | CC 1:2:4 mix using 20mm ISS metal including cost and conveyance of all materials to site including all labour charges etc complete.., | 2.45 | m3 | - | - |
| 2.04 | Brick work in cement mortar 1:5 mix using country bricks 83/4"x4 1/4"x2 3/4" and conveyance of all materials to site and all labour charges etc complete | 2.28 | m3 | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.13 MB
BOQ_829776.xls
BOQ • 0.28 MB
TenderDocument.pdf
Tender Documents • 1.21 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at [email protected].