Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹11.2 LAdmitted-Finance 0 SHANKERPURI COLONY SAHARANPUR BEHAT ROAD NEAR DEHAT KOTWALI SAHARANPUR UTTAR PRADESH 247001 UDYAM UP 64 0001066 09DFQPR2451E1Z4 B R | SAHARANPUR | UTTAR PRADESH | 247001 | ₹11.2 L | L1 | Admitted-Finance |
| 2 | Rejected-Technical 100 33 1 R G S ROAD USHAGRAM SALANPUR 713303 WEST BENGAL INDIA | ASANSOL | PASCHIM BARDHAMAN | WEST BENGAL | 713303 | - | - | Rejected-Technical as per approved TCR |
| 3 | Rejected-Technical | - | - | Rejected-Technical as per approved TCR |
| Sl No | Description | Qty | Unit | ELECTRO TRADING CO. L1 |
|---|---|---|---|---|
| 1.01 | SUPPLY OF NEW ELECTROLYTE GRADE SUPER ENAMELED DOUBLE FIBER GLASS COVERED PRE VARNISH COPPER STRIPS OF SIZE 7.8 x 1.55 MM | 382 | kg | 1,250 ₹4.8 L |
| 1.02 | SUPPLY OF GLASS MICA POLYESTER TAPE SIZE 0.13 X 25 MM | 240 | rolls | 500 ₹1.2 L |
| 1.03 | SUPPLY OF NOMEX PAPER FOR STARTER CORE INSULATION OF THICKNESS 7 MILL | 7.5 | kg | 9,000 ₹67,500 |
| 1.04 | SUPPLY OF VARNISH (ELMO 65ER) | 18 | L | 750 ₹13,500 |
| 1.05 | SUPPLY OF THINNER (205) | 15 | L | 402 ₹6,030 |
| 1.06 | SUPPLY OF SINGLE CORE HT XLPE 70 SQMM COPPER CABLE | 12 | Mtr | 1,200 ₹14,400 |
| 1.07 | TAKING OUT THE COILS FROM THE STATOR | 1 | LS | 4,500 ₹4,500 |
| 1.08 | LABOUR CHARGES FOR FORMATION OF COIL WITH CONVERTED dgfc copper conductor inserting the stator coil | 1 | LS | 27,000 ₹27,000 |
| 1.09 | labour charges for inter layer insulation of the coils to be done with kaftan tape | 1 | LS | 33,000 ₹33,000 |
| 1.10 | labour charges for insulation of overhang portion of the coils within gm tape | 1 | LS | 13,500 ₹13,500 |
Tender Value
₹13.2 L
EMD Value
₹16,500
Closing Date
14 Mar 2026, 4:00 pmClosed
GM SSA
Office of the General Manager, Satgram-Sripur Area, PO-Devchandnagar, WestBengal-713332
Complete Repairing and Rewinding of 630 KW, 6.6 KV 988 RPM NGEF Make Motor sl. No -18800900 of Satgram Project Colliery
2026_ECL_355461_1
ECL/SSA/GM/E M/E-NIT/2025-26/147 dt 02.03.2026
Open Tender
Electrical and Maintenance Works
7 days
Satgram Project
Please refer Tender documents.
5 documents required · 5 mandatory
₹16,500
23 Mar 2026
5 Mar 2026
16 Mar 2026
5 Mar 2026
14 Mar 2026
5 Mar 2026
5 Mar 2026 - 9 Mar 2026
SUPPLY OF NEW ELECTROLYTE GRADE SUPER ENAMELED DOUBLE FIBER GLASS COVERED PRE VARNISH COPPER STRIPS OF SIZE 7.8 x 1.55 MM
SUPPLY OF GLASS MICA POLYESTER TAPE SIZE 0.13 X 25 MM
SUPPLY OF NOMEX PAPER FOR STARTER CORE INSULATION OF THICKNESS 7 MILL
SUPPLY OF VARNISH (ELMO 65ER)
SUPPLY OF THINNER (205)
SUPPLY OF SINGLE CORE HT XLPE 70 SQMM COPPER CABLE
TAKING OUT THE COILS FROM THE STATOR
LABOUR CHARGES FOR FORMATION OF COIL WITH CONVERTED dgfc copper conductor inserting the stator coil
labour charges for inter layer insulation of the coils to be done with kaftan tape
labour charges for insulation of overhang portion of the coils within gm tape
Molding the coils with mica thermo and mica folium by taking
inserting the coils into core slots in chronological manner
supply and fixing of silicon base glass wedges
Cost of fabrication of both side bearing housing by metalizing and machining as per bearing size
dynamic balancing of rotor
supply and fitting of holder with rocker arm
supply and fitting of carbon brush
supply and fitting of rocker socket rebrazing
final assembly of complete motor with all dismantled parts after proper baking and pre deivery testing
transportation charges
Less Old Unused Scrap Value
Total impact of GST for the purpose of CTC
Please Enable Macros to View BoQ information
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.07 MB
Tendernotice_2.pdf
PDF • 0.79 MB
BOQ_368304.xls
BOQ • 0.24 MB
Download all tender documents and submit your bid