Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹7.9 LAdmitted-Finance 115 SUBHAH PURI DAURALA MEERUT UTTAR PRADESH 250221 | MEERUT | UTTAR PRADESH | 250221 | L1 | Admitted-Finance | ||
| 2 | L2₹7.9 L+₹394.08 (0.05%)Admitted-Finance | L2 | Admitted-Finance | ||
| 3 | L3₹7.9 L+₹788.15 (0.10%)Admitted-Finance | L3 | Admitted-Finance |
Tender Value
₹9.3 L
EMD Value
₹46,501
Closing Date
3 Jun 2026, 12:00 pmClosed
OFFICE NP HARRA
OFFICE NP HARRA
Construction of interlocking tiles road and RCC toy wall from Pulia Rajwaha to cremation ground in Ward-06.
2026_DOLBU_1148487_1
075/NPH/2026-27 Date 13/05/2026
Open Tender
Civil Works
Fixed-rate
45 days
OFFICE NP HARRA
3 documents required · 3 mandatory
₹1,097
OFFICE NP HARRA
₹46,501
16 Jun 2026
14 May 2026
3 Jun 2026
14 May 2026
3 Jun 2026
14 May 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in filling upto distance 10.00 km lead with cartage/royalty for levelling dressing including supply of all material,labour and T&P etc.required for proper completion of work, | 53.34 | Cum | 374 | ₹19,949.16 |
| 2 | Concrete in 1:6:12 with cement,fine sand and brick ballast of 4cm guage including supply of all material,labour and T&P etc.required for proper completion of work.(Chpt-5/273) | 11.91 | Cum | 2,930 | ₹34,896.3 |
| 3 | M-150 brick work in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(asper Analysis) | 0.21 | Cum | 6,601 | ₹1,366.41 |
| 4 | 12mm thick Plaster in 1:4 with cement,coarse sand mortar including supply of all material,labour and T&P etc.required for proper completion of work,(Chpt-13/582a) | 0.9 | sqm | 181 | ₹162.9 |
| 5 | Laying of C.C work in 1:2:4 with cement,coarse sand and stone ballast of 2cm guage including supply of all material,labour and T&P etc required for proper completion of work (Chpt-5/279a) | 0.75 | Cum | 5,650 | ₹4,223.38 |
| 6 | Providing,laying,spreading 45.5-63mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work | 7.62 | Cum | 3,676 | ₹28,011.12 |
| 7 | Providing,laying,spreading 22.4-53mm stone Aggregate in one layer with fine sand including supply of all material,labour and T&P etc.required for proper completion of work | 7.62 | Cum | 3,752 | ₹28,590.24 |
| 8 | Supply & laying of 80mm thick I shaped Vibrator made Interlocking cement concrete pavers block (Colours tiles ISI Mark) including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work (asper Analysis) | 50.8 | sqm | 1,120 | ₹56,896 |
| 9 | Supply & laying of 80mm thick I shaped Vibrator made Interlocking cement concrete pavers block (Colours tiles ISI Mark) including joint filling with local sand supply of all material,labour and T&P etc.required for proper completion of work (asper Analysis) Grey tiles | 50.8 | sqm | 1,050 | ₹53,340 |
| 10 | Earth work in excavation in ordinary soil upto 1.5 M & lead upto 30 M including back filling watering and ramming of excavated earth.including supply of all material,labour and T&P etc.required for proper completion of work, Chpt-4/251 | 47.64 | Cum | 90 | ₹4,287.6 |
stage.html
html • 0.03 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.35 MB
Tendernotice_2.pdf
PDF • 1.80 MB
BOQ_2149784.xls
BOQ • 0.31 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .