Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹40.0 LAccepted-AOC | ₹40.0 L Quoted ₹36.4 L | L1 | Accepted-AOC L1 biider |
| 2 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 3 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| 4 | Rejected-Technical | - | - | Rejected-Technical Non Responsive |
| Sl No | Description | Qty | Unit | M/S THE TECHNOLOGY HUB L1 |
|---|---|---|---|---|
| 1.01 | Supply (1kWp-4kWp) | 29 | kWp | 38,500 ₹11.2 L |
| 2.01 | Installation (1kWp-4kWp) | 29 | kWp | 10,000 ₹2.9 L |
| 3.01 | CMC (1kWp-4kWp) | 29 | kWp | 5,000 ₹1.4 L |
| 5.01 | Supply (Above 4kWp) | 44 | kWp | 36,000 ₹15.8 L |
| 6.01 | Installation (Above 4kWp) | 44 | kWp | 6,500 ₹2.9 L |
| 7.01 | CMC (Above 4kWp) | 44 | kWp | 5,000 ₹2.2 L |
Updated dates
Tender Value
₹41.3 L
EMD Value
₹1 L
Closing Date
28 Jan 2026, 3:00 pmClosed
CGM NRE
Conference Room, O/o the CGM(NRE) Annex Building, Bijulee Bhawan, Paltanbazar, Ghy-781001
Implementation of On-Grid Solar Power Plants at different PM-SHRI Schools (Phase-III) Under Samagra Shiksha, Assam
2025_APDCL_49049_1
APDCL/CGM (NRE)/PMSHRI-III/Package-III
Open Tender
Electrical Works
Guwahati
Please refer Tender documents.
2 documents required · 2 mandatory
₹3,000
₹1 L
Conference Room, O/o the CGM (NRE)
11 May 2026
5 Dec 2025
30 Jan 2026
5 Dec 2025
28 Jan 2026
17 Dec 2025
5 Dec 2025 - 11 Dec 2025
12 Dec 2025
Supply (1kWp-4kWp)
Installation (1kWp-4kWp)
CMC (1kWp-4kWp)
Supply (Above 4kWp)
Installation (Above 4kWp)
CMC (Above 4kWp)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.73 MB
Bid_Documents_PM_SHRIPhase-III.pdf
Tender Documents • 5.17 MB
BOQ_77859.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid