Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹7.6 LAdmitted-Finance R O VILLAGE KALYANA P O KANLOG TEHSIL DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹7.6 L | L1 | Admitted-Finance |
| 2 | L2₹7.7 L+₹2,819.12 (0.37%)Admitted-Finance HIMACHAL PRADESH | SOLAN | HIMACHAL PRADESH | 171102 | ₹7.7 L+₹2,819.12 (0.37%) | L2 | Admitted-Finance |
| 3 | L3₹7.7 L+₹5,638.24 (0.74%)Admitted-Finance R O RIHAAN VILLA SHAKTI VIHAR PANTHAGHATI SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | ₹7.7 L+₹5,638.24 (0.74%) | L3 | Admitted-Finance |
| Sl No | Description | Qty | Unit | Devinder Thakur L2 | Bhagat Singh Thakur L3 | ABHISHEK THAKUR L1 |
|---|---|---|---|---|---|---|
| 1.00 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 33.12 | P.Cum | 391 ₹12,949.92 | 392 ₹12,983.04 | 390 ₹12,916.8 Lowest |
| 2.00 | Providing and laying in position specified grade of cement concrete, excluding the cost of centering, shuttering, All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 33.12 | P.cum | 6,700 ₹2,21,904 Lowest | 6,700 ₹2,21,904 Lowest | 6,700 ₹2,21,904 Lowest |
| 3.00 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 2,786 | P.Kg | 109 ₹3,03,674 | 110 ₹3,06,460 | 108 ₹3,00,888 Lowest |
| 4.00 | Supplying and fixing M.S Wire mesh/jali member in partitions etc Weight exceeding 3kg and not exceeding 5kg per sqm.weight exceeding 5kg and not exceeding 8 kg per sqm 25x26 mm including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 240 | P.Sqm | 910 ₹2,18,400 Lowest | 910 ₹2,18,400 Lowest | 910 ₹2,18,400 Lowest |
| 5.00 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications :Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 87.98 | P.Sqm | 120 ₹10,557.6 Lowest | 120 ₹10,557.6 Lowest | 120 ₹10,557.6 Lowest |
Tender Value
₹7.3 L
EMD Value
₹14,500
Closing Date
7 Aug 2026, 5:00 pmClosed
Executive Engineer RB MC Shimla
Executive Engineer RB MC Shimla
C O woven plain wire fencing with steel work around police linde ground Bharari in ward No 1 Bharari SH PL CC 1 2 4 and steek work with woven plain GI wire fencing etc
2026_MC_140201_8
2519 dated 27 07 2026
Open Tender
Civil Works
Item Rate
60 days
Shimla
Please refer to tender documents
7 documents required · 7 mandatory
₹413
Yes
Executive Engineer RB MC Shimla
₹14,500
Yes
13 Aug 2026
30 Jul 2026
10 Aug 2026
30 Jul 2026
7 Aug 2026
30 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom and back filling with approved material. Hard Roack blasting prohibited and their intermediate classification of soils including, dewatering wherever required, setting of to the required lines, levels as shown on the drawing and directed by the Engineer -in-charge at site, according to the HP.PWD. specification of 1990 (one thousand nine hundred ninety) volume-I (one) and sorting out useful and unuseful material and transportation of the unuseful material for disposing at approved dumping site Bharyal. including head load, animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour (if required).All useful material such as stones, shingles aggregate and slates shall be properly stacked at site to the maximum possible extent in all leads and lifts through all modes of transportation the usefull stones as per the direction of the Engineer-in-Charge. Any loss to the public and private propriety during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. | 33.12 | P.Cum | 100 | ₹3,312 |
| 2 | Providing and laying in position specified grade of cement concrete, excluding the cost of centering, shuttering, All work up to plinth level : 1:2:4 (1 cement : 2 coarse sand) : 4 graded stone aggregate 20 mm nominal size) including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 33.12 | P.cum | 101 | ₹3,345.12 |
| 3 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 2,786 | P.Kg | 102 | ₹2,84,172 |
| 4 | Supplying and fixing M.S Wire mesh/jali member in partitions etc Weight exceeding 3kg and not exceeding 5kg per sqm.weight exceeding 5kg and not exceeding 8 kg per sqm 25x26 mm including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 240 | P.Sqm | 103 | ₹24,720 |
| 5 | Finishing with Deluxe Multi surface paint system for interiors and exteriors using Primer as per manufacturers specifications :Two or more coats applied on walls @ 1.25 ltr/10 sqm over and including one coat of Special primer applied @ 0.75 ltr /10 sqm including carriage of materials within all leads lifts and other incidentals as per direction of Engineer-in-Charge. | 87.98 | P.Sqm | 104 | ₹9,149.92 |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 4.42 MB
Tendernotice_2.pdf
PDF • 0.68 MB
Tendernotice_3.pdf
PDF • 0.35 MB
BOQ_208002.xls
BOQ • 0.23 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .