| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹32.1 LAdmitted-Fee/PreQual/Technical/Finance | -8.35% | ₹32.1 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹33.5 L+₹1.4 L (4.39%)Admitted-Fee/PreQual/Technical/Finance | -4.33% | ₹33.5 L+₹1.4 L (4.39%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
₹35 L
EMD Value
₹70,000
Closing Date
15 Sept 2026, 4:00 pmClosed
Executive Engineer RnB Division Budgam
Engineering complex Budgam
Improvements/Upgradation of road at Halqa Dabipora Hakwari Mohalla upto the H/O Mohmmad Shafi and ors Khansahib.
2026_PWDJK_323385_4
NIT_No_74_DB_2026-27
Open Tender
Civil Works
Percentage
20 days
Khansahib
Please refer Tender documents.
3 documents required · 3 mandatory
₹1,100
Executive Engineer RnB Division Budgam
₹70,000
17 Sept 2026
3 Sept 2026
16 Sept 2026
3 Sept 2026
15 Sept 2026
3 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Supplying/Laying of RBM/Nallah Muck/khak bajri/Soiling/GSB or any other such materials i/c watering, levelling and consolidation in layers by 08 to 10 tonne capacity road roller to required gradient and camber including all costs and carriages upto site of work,complete job | 243.38 | Cum | 1,000 | ₹2,43,375 |
| - | Supplying, stacking,Laying, spreading and compacting stone aggregate of specified sizes( 63 to 45mm) to WBM specifications in uniform thickness, hand picking, including rolling with 3 wheeled road / vibratory roller 8-10 tonne capacity in stages to proper grade and camber, applying and brooming requisite type of screening ( 13.2mm size) /binding material (stone dust/moorum) to fill up interstices of coarse aggregate,watering and compacting to the required density( finished work shall be paid) with all leads , lifts and carriages as involved upto site of work. All complete job. | 123.19 | CUM | 2,800 | ₹3,44,925 |
| 3 | Providing, laying, spreading and compacting graded stone aggregate (size range 53 mm to 0.075 mm ) to wet mix macadam (WMM) specification including premixing the material with water at OMC in mechanical mix plant, carriage of mixed material by tipper to site, for all leads & lifts, laying in uniform layers with mechanical paver finisher in sub- base / base course on well prepared surface and compacting with vibratory roller of 8 to 10 tonne capacity to achieve the desired density, complete as per specifications and directions of Engineer-in-Charge | 141.26 | cum | 1,885.95 | ₹2,66,399.87 |
| 4 | Providing and laying of tack coat using hot straight run bitumen of VG-10 including heating the bitumen spraying the bitumen by mechanically operated spray unit fitted on bitumen boiler ,cleaning and preparing the existing road surface to remove all dirt dust mud etc and finally brooming the surface as per required specifications. | 1,883.4 | Sqm | 74.35 | ₹1,40,030.79 |
| 5 | Providing and laying bituminous macadam using crushed stone aggregates of specified grading premixed with bituminous binder, transported to site by tippers, laid over a previously prepared surface with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers as per specifications to achieve the desired compaction and density, complete as per specifications and directions of Engineer-in-Charge.50 to 100 mm average compacted thickness with bitumen of grade VG-10 @ 3.5% (percentage by weight of total mix) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | 94.17 | CUM | 8,590.95 | ₹8,09,009.76 |
| 6 | Providing and laying semi- dense Bituminous concrete using crushed stone aggregates of specified grading, premixed with bituminous binder and filler, transporting the hot mix to work site by tippers, laying with paver finisher equipped with electronic sensor to the required grade, level and alignment and rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction and density as per specification, complete and as per directions of Engineer-in-Charge.25 mm compacted thickness with bitumen of grade VG-10 @ 5% (percentage by weight of total mix) and lime filler @ 2% (percentage by weight of Aggregate) prepared in Drum Type Hot Mix Plant of 60-90 TPH capacity. | 1,883.4 | Sqm | 293.1 | ₹5,52,024.54 |
| 7 | Providing and laying seal coat of premixed fine aggregate (passing 2.36mm and retained on 180 micron sieve) with bitumen using 128 kg of bitumen of grade VG-10 bitumen per cum of fine aggregate and 0.60 cum of fine aggregate per 100 sqm of road surface including rolling and finishing with road all complete. | 1,883.4 | Sqm | 101.4 | ₹1,90,976.76 |
| 8Lining wall | |||||
| 8.01 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: | 44.55 | Cum | 256.85 | ₹11,442.67 |
| 9 | P/L dry Stone soling duly tightly hand packed and RBM/GSB filling i/c stacking, carriage etc, complete job. | 46.37 | Cum | 1,000 | ₹46,370 |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.09 MB
BOQ_1088180.xls
BOQ • 0.29 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .