| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹55.7 LAccepted-AOC | ₹55.7 L | L1 | Accepted-AOC L1 |
| 2 | L2₹56.0 LRejected-Finance HIRANPUR PAKUR | PAKUR | JHARKHAND | 814111 | ₹56.0 L | L2 | Rejected-Finance HIGHER BID |
| 3 | Rejected-Technical AZAD NAGAR SAHEBGANJ | GODDA | JHARKHAND | 813208 | - | - | Rejected-Technical ALL DOCUMENT NOT SUBMIT |
| 4 | Rejected-Technical | - | - | Rejected-Technical ALL DOCUMENT NOT SUBMIT |
| 5 | Rejected-Technical AZAD NAGAR SAHEBGANJ | - | - | Rejected-Technical ALL DOCUMENT NOT SUBMIT |
Tender Value
₹57.9 L
EMD Value
₹1.2 L
Closing Date
6 Apr 2026, 5:00 pmClosed
OFFICE OF THE EE NREP SAHIBGANJ
OFFICE OF THE EE NREP SAHIBGANJ
Construction of School Boulding at Dhogra under taljhari Block , Dist - SBG
2026_NREPS_112010_1
NREP/SBG/33/2025-26/08
Open Tender
Civil Works - Buildings
180 days
TALJHARI
AS PER F2
4 documents required · 4 mandatory
₹10,000
₹1.2 L
20 May 2026
25 Mar 2026
8 Apr 2026
25 Mar 2026
6 Apr 2026
25 Mar 2026
25 Mar 2026 - 6 Apr 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount | Item Code |
|---|---|---|---|---|---|---|
| 1 | Earth work in excavation in foundation trenches in ordinary soil ( vide classification of soil item A) and disposal of excavated earth as obtained to a distance upto 50M including all lifts leveling ramming the foundation treanches, removing roots of trees, and shrubs all complete as per approved design, building specification and direction of E/I. xtra for earthwork in hard soil as per specification and direction of E/I. ( vide classification of soil item-B | 113.1 | CUM | 167.33 | ₹18,925.02 | 113.1 |
| 2 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per building specification and direction of E/I. (Mode of measurement compacted volume) | 37.67 | CUM | 589.51 | ₹22,206.84 | - |
| 3 | Providing designation 75A one brick flat soling joints filled with local sand including cost of watering taxes royalty all complete as per building specification and direction of E/I. | 296.32 | SQM | 356.52 | ₹1,05,644.01 | - |
| 4 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 22.57 | CUM | 4,125.41 | ₹93,110.5 | - |
| 5 | Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) | 20.94 | CUM | 5,218 | ₹1,09,264.92 | - |
| 6 | Reinforced cement concrete work in walls (any thickness), including attached pilasters, buttresses, plinth and string courses, fillets, columns, pillars, piers, abutments, posts and struts etc. above plinth level up to floor five level, excluding cost of centering, shuttering, finishing and reinforcement : 1:1.5:3 (1 cement : 1.5 coarse sand(zone III) : 3 graded stone aggregate 20 mmnominal size | 10.13 | CUM | 6,082.45 | ₹61,615.22 | - |
| 7 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement, with 1:1.5:3 (1 cement : 1.5 coarse sand(zone III) : 3 graded stone aggregate 20 mm nominal size). | 55.26 | CUM | 6,308.87 | ₹3,48,628.16 | - |
| 8 | Centering and shuttering including strutting, propping etc. and removal of form for : Foundations, footings, bases of columns, etc. for mass concrete | 94.42 | SQM | 194.5 | ₹18,364.69 | - |
| 9 | Centering and shuttering including strutting, propping etc. and removal of form for : Suspended floors, roofs, landings, balconies and access platform | 247.36 | SQM | 435.82 | ₹1,07,804.44 | - |
| 10 | Centering and shuttering including strutting, propping etc. and removal of form for : Lintels, beams, plinth beams, girders, bressumers and cantilevers | 241.46 | SQM | 363.97 | ₹87,884.2 | - |
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
BOQ_151232.xls
BOQ • 0.35 MB
DOUBLEBIDDOCUMENT.pdf
Tender Documents • 1.20 MB