| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.0 LAccepted-Finance | ₹13.0 L | L1 | Accepted-Finance OK |
| 2 | L2₹13.2 LAccepted-Finance | ₹13.2 L | L2 | Accepted-Finance OK |
| 3 | L3₹13.3 LAccepted-Finance | ₹13.3 L | L3 | Accepted-Finance OK |
Tender Value
₹13.0 L
Closing Date
2 Apr 2026, 5:00 pmClosed
Executive Engineer Zilla Parishad Raigad Alibag
Shivtirtha Building Zilla Parishad Raigad Alibag
Construction Of Gavdevi Mandir Approch Road At Nigade ,Tal - Mahad , Dist - Raigad
2026_RAIGA_1290500_4
ZP-RAIGAD-WORKDIV-203-2025-26
Open Tender
Civil Works
180 days
Tal.Karjat Dist. Raigad
RZP Registration Contractor AS PER ONLY FOR M.S.S.
12 documents required · 12 mandatory
₹590
Exempted
7 Apr 2026
26 Mar 2026
6 Apr 2026
26 Mar 2026
2 Apr 2026
26 Mar 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1Item No.1:- Excavation for roadway in earth, soil of all sorts, sand, gravel or soft murum including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stacking as directed. By Manual Means | |||||
| 2Item No.2:- Excavation for catch / side water gutter in all sorts of soils to the specified section including stacking the excavated stuff in a regular bund and disposing of unsuitable or excess stuff as directed all sorts of soils. | |||||
| 3Item No.3:-Excavation for roadway in hard murum and boulder including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m.and spreading for embankment or stacking as directed. | |||||
| 4Item No. 4:- Excavation for roadway in hard rock by controlled blasting including dressing section to the required grade, camber and side slopes and conveying the excavated materials with all lifts upto a lead of 50m. and spreading for embankment or stocking as directed. | |||||
| 5Item No.5:- Providing earth work in embankment with approved materials obtained from departmental land upto lead of 50m. including all lifts, laying in layers of 20cm. to 30cm. thickness breaking clods, dressing to the required lines, curves, grades & section, watering and compaction with vibratory roller to achieve not less than 97 % of standard proctor density etc. complete. (Material obtained from departmental Land) | |||||
| 6Item No.6:- Providing and laying cement concrete pipe of IS 458:2003 NP-2 class of 600mm diameter in proper line, level and slope including providing and fixing collars in cement mortar 1:2 and curing etc. complete. | |||||
| 7Item No.7 :- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Intelligent Compactor with compaction analyzer and V-Sat attachment. to the required density. Grading I (Using Screening Type B (11.2 mm) Aggregate) | |||||
| 8Item No.8 :- Providing, laying, spreading and compacting stone aggregates of specific sizes to water bound macadam specification including spreading in uniform thickness, hand packing to proper grade and camber, applying and brooming requisite type of screening/ binding Materials to fill up the interstices of coarse aggregate, watering and compacting with Intelligent Compactor with compaction analyzer and V-Sat attachment. to the required density. Grading Il (Using Screening Type B (11.2 mm) Aggregate) | |||||
| 9Item No.9 :- Providing and constructing 75 mm. thick Modified Penetraction Macadam (MPM) road surface including all materials, preparing the existing road surface, spreading 40 mm. stone layers metal 30% crusher broken metal + 70% Hand broken metal (By breaking Rubble obtained by blasting) , heating and spraying the bitumen of specified grade @ 2 kg / sqm , spreading 12mm.size chips compacting with three wheel static roller having weight 8 to 10 MT. to achive the desired degree of compaction as per Technical Specification Clause 506 etc.complete, including applying tack coat of specified grade of bitumen at the rate of 0.30 Kg Sqm. on existing bitumen surface. (VG-30 bulk bitumen rates are considered to arrive at rates) | |||||
| 10Item No. 10 :- Surface Dressing -- Providing and laying surface dressing as wearing course in single coat using crushed stone aggregates of specified size on a layer of bituminous binder laid on prepared surface and rolling with 8-10 tonne smooth wheeled steel roller. -- b) 13 mm nominal chippling size (bitumen 10.00 kg/10 Sq.M.) -- Bitumen VG-30 bulk bitumen | |||||
stage.html
html • 0.04 MB
techsummary_2218506.pdf
BOQ Comparative Chart
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.26 MB
BOQ_2218506.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid