| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹64.5 LAccepted-AOC AT UPPER STREET SUNDARPUR CHATRAPUR DIST GANJAM PIN 761020 | CHATRAPUR | GANJAM | ODISHA | 761020 | L1 | Accepted-AOC 1stlowest | |
| 2 | L2₹64.5 LSame as L1Rejected-AOC AT DAMANAKHOLA PO DIGAPADA PS KODALA DIST GANJAM ODISHA PIN 761032 | KODALA | GANJAM | ODISHA | 761032 | L2 | Rejected-AOC 2ndlowest | |
| 3 | l3₹64.5 LSame as L1Rejected-AOC AT BADA SAHI PO HUMMA VIA RAMBHA DIST GANJAM 761027 | GANJAM | ODISHA | 761027 | l3 | Rejected-AOC 3rdlowest |
Tender Value
₹67.0 L
EMD Value
₹67,000
Closing Date
24 Jul 2024, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
O/O SE, M.I. Division Ganjam-I, Brahmapur
O/O SE, M.I. Division Ganjam-I, Brahmapur, Engg. School Road, Brahmapur.
Balance work of Podasinganalla under OIIPCRA in Sanakhemundi Block in Ganjam District
2024_CEMIB_103475_3
OIIPCRA-W2-GM-I-01/2024-25
National Competitive Bid
Civil Works - Others
Item Rate
270 days
Sanakhemundi
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹67,000
O/O SE, M.I. Division Ganjam-I, Brahmapur
7 Jan 2025
4 Jul 2024
24 Jul 2024
4 Jul 2024
24 Jul 2024
4 Jul 2024
4 Jul 2024 - 10 Jul 2024
10 Jul 2024
Amount
Clearing and grubbing jungles including uprooting tank vegetation, grass bushes, shrubs, saplings and trees of girth up to 300mm, removal of stumps of trees cut earlier and disposal of unserviciable material and stacking of useful materials with supply of all labour T & P and all taxes as per prevailing norm etc. complete as directed by the Engineer-in-charge.
Dismantling brick or stone masonry in clay, lime or cement mortar including stacking the useful materials for reuse and removing the debris with all leads & lifts including all labour, taxes as per prvailing norm, T & P etc. required for the item & as per direction of engineer-in-charge.
Dismantling and removing cement concrete including stacking the useful materials for reuse and removing the derbies with all leads & lifts including all labour, taxes as per norm, T & P etc. required for the item & as per direction of engineer-in-charge.
Earth work in Ordinary soil with all leads and lifts to proper slope and profile as per the requirement including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not exceeding 0.30M in depth to proper slope and profile with supply of all labour and tools and plants, all materials all taxes & supervision charges to complete the item of work as per design drawing and specification and as per the direction of the Engineer in charge. (Measurement will be taken on the finished approved level section).
Excavation of foundation to proper profile in all kinds of soil with all leads and lifts including dressing and leveling the bed to proper slope and level and making it fit for laying concrete and depositing the excavated materials clear of work site within all leads and lifts etc including dewatering from foundation if necessary etc with supply of all labour, all taxes as per prevailing norm and T&P required for the work etc complete in all respects as directed by the Engineer-in-charge.
Excavation of the approved type of soil in approved borrow area by mechanical means, loading into and transportation by mechanical means and unloading the soil on properly prepared and scientifically approved surface including spreading & levelling the earth in layers of 22.5cm thick to make ready for watering and compaction with dozers/ by standard vibrator / short drum width vibratory power roller but excluding watering & compaction in dams and dykes for all heights including construction, maintenance, watering and lighting of haul road and borrow area including hire & running charges of all materials, labour all taxes as per prevailing norm etc. complete as per direction of Engineer-in-Charge.(Measurement will be taken in the finished approved level section. 1/6th volume will be deducted towards settlement for embankment only)
Providing Cement Concrete M15 grade with nominal reinforcement (excluding cost of M.S. rod, carriage and labour for cutting, bending, binding and fixing of M.S. rod) using 20mm and down, graded, crusher broken hard granite stone aggregates of approved quality quarried, free from weathered skin, quarry debris and foreign materials, using clean and sharp sand of approved grading and quality confirming to the design specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrators and finishing the exposed surface smooth, curing for required time, providing beads and grooves wherever necessary including cost, conveyance, royalty and other taxes of all materials, with all cost of tools and plant, cost and carriage of water etc, with supply of all labour, taxes as per prvailing normand supervision Charges including mobilisation & de-mobilisation of men & machineries, T&P with all incidental Charges required for the work complete in all respect as directed by the Engineer-in-Charge.
Providing Reinforced Cement Concrete M20 grade for RCC works on approved surface or shape and size using 20mm and down graded crusher broken hard granite stone aggregates of approved quality quarried, free from weathered skin, quarry debris and foreign materials, clean and sharp sand of approved grading and quality confirming to the design specifications including hoisting & lowering to all heights, watering & dewatering, laying the concrete in position to proper slope and level, compacting in layers with vibrators and finishing the exposed surface smooth, curing for required time, providing beads and grooves including cost, conveyance, royalty and other taxes of all materials, ( excluding cost, carriage of M.S. rod and labour for cutting, bending, binding and fixing of M.S. rod) with all cost of tools and plant, cost and carriage of water etc, with supply of all labour and supervision Charges including mobilisation & demobilisation of machineries, T&P with all incidental Charges required for the work complete in all respect as directed by the Engineer-in-Charge.
Supplying, fitting & placing HYSD bars reinforcement and tying the grills as per approved design & drawing and placing in position including cost, conveyance, royalty and other taxes binding wires of 18 to 20 gauge with supply of all labour, taxes as per prvailing norm and T&P required for the work etc, complete in all respect as directed by the Engineer-in-Charge. (Weight of the binding wire will not be included in the measurement for payment)
Filling foundation & plinth with excavated materials including watering & ramming to all heights with all leads & lifts with supply of all labour, all taxes as per norm and T&P required for the work etc complete in all respects as directed by the Engineer-in-charge.
Providing rigid, smooth centering & shuttering for concrete works including false work and including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismantling the same after casting and curing with water for specified period including depositing the debris clear of work site with all leads & lifts, delfts including supply of all labour, all tases as per prevailing norm and T & P required for the items etc. complete in all respect as directed by Engineer-in-charge. (For Foundation and Plinth)
Providing rigid, smooth centering & shuttering for concrete works including false work and including cost, conveyance, royalty & other taxes of all materials required for the work complete in all respect and dismantling the same after casting and curing with water for specified period including depositing the debris clear of work site with all leads & lifts, delfts including supply of all labour, all tases as per prevailing norm and T & P required for the items etc. complete in all respect as directed by Engineer-in-charge. (For Super Structure)
Rough Stone Dry packing in approns and revetments to all height, profile and level using hard granite broken stone of 30 cm. and above size and above of approved quality, quarried, free from weathered skin including filling the interstices with small stone wedges including cost, conveyance, royality and other taxes of all materials, labour, all taxes as per prevailing norm and T&P alongwith supply of all labour required for the work complete in all respects as directed by the Engineer-in-Charge. (Using New Stone)
Rough Stone Dry packing in approns and revetments to all height, profile and level using hard granite broken stone of 30 cm. and above size and above of approved quality, quarried, free from weathered skin including filling the interstices with small stone wedges including cost, conveyance, royality and other taxes of all materials, labour, all taxes as per prevailing norm and T&P alongwith supply of all labour required for the work complete in all respects as directed by the Engineer-in-Charge. (Using Deptt. Stone)
Filling in foundation and plinth with sand well watered and rammed in layers of 23.5cm thick including cost, conveyance of materials and supply of all labour, taxes as per prvailing norm and T&P, dewatering if required for the work etc. complete and as directed by Engineer-in-charge.
Providing weep holes in plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipes, extending through the full width of the structure with slope 1V : 20H towards draining face including cost, carriage, royalties and taxes of all materials, supply of all labour and T & P and supervision charges required for the item etc. complete in all respect as per approved design, drawing, specificiton and as per the direction of the Engineer-in-Charge.
Labour for laying and fixing reinforced cement concrete hume pipes with collars jointed with cement mortar (1:3) complete including cost, conveyance royalty and other taxes of all materials required for the work with supply of all labour and T& P required for the item etc. complete in all respects as directed by the Engineer-in-charge. (RCC HP 150 mm dia NP3)
Pradeep Kumar Satapathy
SANTOSH KUMAR MOHANTY
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .