| 1 | L1₹14.8 LAccepted-AOC NO 33 15 GROUND FLOOR MANALI NEW TOWN CHENNAI 600 103 | THIRUVALLUR | TAMIL NADU | 600103 | L1 | Accepted-AOC Accept | |
| 2 | L2₹15.3 L+₹2.7 L (21.5%)Rejected-AOC | L2 | Rejected-AOC Reject |
| Sl No | Description | Qty | Unit | VASANTHA ENGINEERING WORKS L2 | MOOGAMBIGAI ENGINEERING WORKS L1 |
|---|---|---|---|---|---|
| 1.00 | Charges for dismantling the 300 NB worn-out MS ERW pump discharge over head Hydrant mains (up to 6 m level) in RWPH area by isolating the Hydrant System cutting of mains, dewatering, removal of mains, Fabrication & erection of new 300 NB MS ERW pump discharge over head Hydrant mains (upto 6 m level) in RWPH area and up to U/G main header, mitre bends, connecting with the Hydrant System and normalizing including cost of consumables, scoffolding charges, leading, lifting and T&P hire charges. | 140 | Metre | 2,000 ₹2,80,000 | 1,950 ₹2,73,000 Lowest |
| 2.00 | Charges for Fabrication & erection of new 300 NB MS ERW pump discharge over head Hydrant mains (upto 6 m level) in RWPH area , mitre bends, ,connecting with the Hydrant System and normalizing including cost of consumables, scoffolding charges, leading, lifting and T&P hire charges. | 140 | Metre | 4,000 ₹5,60,000 | 3,120 ₹4,36,800 Lowest |
| 3.00 | Charges for loading and unloading and Transporting of 300 NB M.S. ERW pipes from Ware house stores to work spot in various locations including cost of T&P and consumables. | 140 | Metre | 1,000 ₹1,40,000 | 500 ₹70,000 Lowest |
| 4.00 | Charges for loading and unloading and Transporting of 350 NB M.S. ERW pipes from Ware house stores to work spot in various locations including cost of T&P and consumables. | 8 | Metre | 1,000 ₹8,000 | 500 ₹4,000 Lowest |
| 5.00 | Charges for dismantling of worn-out 300/350 NB Fire Hydrant/HVWS suction mains up to suction side sluice valve in Raw Water Pump House by isolating from the hydrant/HVWS system and fabrication and erection of new suction mains with mitre bend and reducer one by one without affecting the Hydrant/HVWS mains in service which are in ready to use condition round the clock including cost of flange consumables and T & P hire charges. | 5 | Activity | 30,000 ₹1,50,000 | 28,300 ₹1,41,500 Lowest |
| 6.00 | Charges for dismantling of 200 mm dia.damaged M.S ERW pipe by cutting etc. | 9 | Metre | 400 ₹3,600 | 360 ₹3,240 Lowest |
| 7.00 | Charges for erection of new200 mm dia. M.S ERW pipe by cutting and welding etc. | 9 | Metre | 800 ₹7,200 | 730 ₹6,570 Lowest |
| 8.00 | Charges for dismantling of 100 mm dia. damaged M.S ERW pipe by cutting etc. | 55 | Metre | 200 ₹11,000 | 183 ₹10,065 Lowest |
| 9.00 | Charges for erection of new100 mm dia. M.S ERW pipe by cutting and welding etc. | 55 | Metre | 400 ₹22,000 | 367 ₹20,185 Lowest |
| 10.00 | Charges for replacement of wornout suction and discharge of MS ERW 80 NB pipeline network of Jockey Pump A & B by isolating from the PS in the RWPH and fabrication and erection of new network | 1 | System | 45,000 ₹45,000 | 41,700 ₹41,700 Lowest |
Tender Value
Refer Docs
EMD Value
₹13,700
Closing Date
13 May 2025, 2:00 pmClosed
The Chief Engineer
The Chief Engineer, North Chennai Thermal Power Station - I, Chennai - 120
NCTPS I Operation Circle O and E division Fire Fighting Replacement of worn out hydrant mains inside and outside of Raw Water Pump House
2025_EB_552593_1
CE/NCTPS-I/SE/OPN/02/2025-26
Open Tender
Power/Energy Projects/Products
Works
60 days
NCTPS - I
Please refer Tender documents.
3 documents required · 3 mandatory
₹0
₹13,700
Yes
23 Sept 2025
29 Apr 2025
14 May 2025
29 Apr 2025
13 May 2025
29 Apr 2025
Amount
Charges for dismantling the 300 NB worn-out MS ERW pump discharge over head Hydrant mains (up to 6 m level) in RWPH area by isolating the Hydrant System cutting of mains, dewatering, removal of mains, Fabrication & erection of new 300 NB MS ERW pump discharge over head Hydrant mains (upto 6 m level) in RWPH area and up to U/G main header, mitre bends, connecting with the Hydrant System and normalizing including cost of consumables, scoffolding charges, leading, lifting and T&P hire charges.
Charges for Fabrication & erection of new 300 NB MS ERW pump discharge over head Hydrant mains (upto 6 m level) in RWPH area , mitre bends, ,connecting with the Hydrant System and normalizing including cost of consumables, scoffolding charges, leading, lifting and T&P hire charges.
Charges for loading and unloading and Transporting of 300 NB M.S. ERW pipes from Ware house stores to work spot in various locations including cost of T&P and consumables.
Charges for loading and unloading and Transporting of 350 NB M.S. ERW pipes from Ware house stores to work spot in various locations including cost of T&P and consumables.
Charges for dismantling of worn-out 300/350 NB Fire Hydrant/HVWS suction mains up to suction side sluice valve in Raw Water Pump House by isolating from the hydrant/HVWS system and fabrication and erection of new suction mains with mitre bend and reducer one by one without affecting the Hydrant/HVWS mains in service which are in ready to use condition round the clock including cost of flange consumables and T & P hire charges.
Charges for dismantling of 200 mm dia.damaged M.S ERW pipe by cutting etc.
Charges for erection of new200 mm dia. M.S ERW pipe by cutting and welding etc.
Charges for dismantling of 100 mm dia. damaged M.S ERW pipe by cutting etc.
Charges for erection of new100 mm dia. M.S ERW pipe by cutting and welding etc.
Charges for replacement of wornout suction and discharge of MS ERW 80 NB pipeline network of Jockey Pump A & B by isolating from the PS in the RWPH and fabrication and erection of new network
Charges for fabrication of 1 No, 300 NB spool piece with end flanges by cutting the 300 NB pipe to the required length, grinding the edges, setting, erection and welding the end flanges, repairing the wornout 300 NB bend by patch welding the wornout portion and flange joint area etc., as per site condition welding the end flanges including transporting, hire charges for T&P and consumables etc.
Charges for erection of 300 mm gate valve in newly erected line including cost of gaskets and Bolts & nuts.
Erection of NRV on the original position connecting with pipe line and providing proper supporting commissioning, attending leakages if any etc.,
Charges for providing pedestal for supporting the ERW hydrant line including excavation of earth, providing PCC, RCC, shuttering work including cost of materials.
VASANTHA ENGINEERING WORKS (BID ID -1331516)
stage.html
html • 0.04 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .