Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹4.6 LAdmitted-Fee/PreQual/Technical/Finance PALLA STREET VENGANTHUR VILUPPURAM | ₹4.6 L | L1 | Admitted-Fee/PreQual/Technical/Finance |
| 2 | L2₹5.1 L+₹53,921.57 (11.8%)Admitted-Fee/PreQual/Technical/Finance | ₹5.1 L+₹53,921.57 (11.8%) | L2 | Admitted-Fee/PreQual/Technical/Finance |
| Sl No | Description | Qty | Unit | DHIYA INFRASTRUCTURE L2 | NAVEEN CONSTRUCTIONS L1 |
|---|---|---|---|---|---|
| 1.00 | Providing Pile foundation of size 300 mm dia using augur including labour charges and all other tools and plants charges etc. , as per direction ofdept officers (Local Rate) | 42 | M | 300 ₹12,600 Lowest | 300 ₹12,600 Lowest |
| 2.00 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 28 | M3 | 100 ₹2,800 Lowest | 200 ₹5,600 |
| 3.00 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification. | 6 | M3 | 5,900 ₹35,388.2 | 5,500 ₹32,989 Lowest |
| 4.00 | Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as RCC COLUMN FOOTING, PLINTH BEAM, STAIRCASE STEPS etc., in all floors using mild steel sheets of size 90cm X 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 90 | M2 | 1,000 ₹90,000 Lowest | 1,000 ₹90,000 Lowest |
| 5.00 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification | 13 | Qtl | 9,500 ₹1,23,500 | 8,000 ₹1,04,000 Lowest |
| 6.00 | Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 13 | M3 | 8,400 ₹1,09,189.77 | 7,885 ₹1,02,495.4 Lowest |
| 7.00 | Supplying and fixing chain link fencing 2" x 2"using 10 gauge Galvanised iron wire includingthe 40mm GI Post with horizontal and verticalframe section size of 30 x 30mm and fixing theGI post foundation concrete including all costand conveyance of all materials and labourcharges etc complete as directed by departmental officers | 180 | M2 | 660 ₹1,18,800 | 500 ₹90,000 Lowest |
| 8.00 | Supply and fixing of L angle, Grill including cutting, bending , welding and erection charges etc. | 150 | Kg | 100 ₹15,000 Lowest | 100 ₹15,000 Lowest |
| 9.00 | Conveying the excavated earth and debries Using Tipper as directed by the CCMC officials etc complete | 28 | M3 | 75 ₹2,100 Lowest | 99 ₹2,772 |
| 10.00Add GST 18 % | |||||
Tender Value
₹6.5 L
EMD Value
₹6,500
Closing Date
12 Aug 2026, 3:00 pmClosed
The Assistant Commissioner,
North Zone, Coimbatore Corporation, Balasundaram Road,Oppsite Womens Polytechnic
Providing Fencing at Balamurugan nagar Channel in ward no 19, North Zone
2026_MAWS_690592_37
E2/NorthZone/2026-27
Open Tender
Civil Works
Works
90 days
North Zone, Coimbatore Corporation
As per the tender condition attached
5 documents required · 5 mandatory
₹0
₹6,500
14 Aug 2026
5 Aug 2026
13 Aug 2026
5 Aug 2026
12 Aug 2026
5 Aug 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Providing Pile foundation of size 300 mm dia using augur including labour charges and all other tools and plants charges etc. , as per direction ofdept officers (Local Rate) | 42 | M | - | - |
| 2 | Earth work excavation in all kinds of soil including sand, silt, wet sand under water, black cotton, stiff black cotton, clay, hard stiff clay, hard red earth, murram, stoney earth, gravel and shales etc. excepting all kinds of rock and boulders exceeding 0.014 cum. in volume including rough dressing and dumping the excavated materials away from work site manually within 10m initial lead and 2m initial lift as per the direction of Engineer-in-charge. | 28 | M3 | - | - |
| 3 | Cement concrete 1:4:8 (one cement, four sand and eight aggregate) using 40mm hard broken granite stone jelly for foundation including dewatering if found necessary and laid in layers of not more than 15 cm thick and compacted etc., complete complying with standard specification. | 6 | M3 | - | - |
| 4 | Supplying and erecting SHUTTTERING including necessary supports for plane surfaces such as RCC COLUMN FOOTING, PLINTH BEAM, STAIRCASE STEPS etc., in all floors using mild steel sheets of size 90cm X 60Cm and BG 10 stiffened with welded mild steel angles for boarding supported by Casuarinas props at suitable intervals etc., complete complying with standard specification and as directed. | 90 | M2 | - | - |
| 5 | Supplying, fabricating and placing in position TMT/CTD rods for all RCC works including cost of steel and binding wire also in all floors complete complying with standard specification | 13 | Qtl | - | - |
| 6 | Cement concrete 1:1.5:3 (one cement, one and a half sand and three aggregate) using 20mm hard broken granite stone jelly for All RCC items of work excluding centering, shuttering, and cost of reinforcement grill but including curing finishing, vibrator charges etc., complete and also including fixing fan clamps and fixtures in RCC works wherever necessary as directed by departmental officer etc., complete. | 13 | M3 | - | - |
| 7 | Supplying and fixing chain link fencing 2" x 2"using 10 gauge Galvanised iron wire includingthe 40mm GI Post with horizontal and verticalframe section size of 30 x 30mm and fixing theGI post foundation concrete including all costand conveyance of all materials and labourcharges etc complete as directed by departmental officers | 180 | M2 | - | - |
| 8 | Supply and fixing of L angle, Grill including cutting, bending , welding and erection charges etc. | 150 | Kg | - | - |
| 9 | Conveying the excavated earth and debries Using Tipper as directed by the CCMC officials etc complete | 28 | M3 | - | - |
| 10 | Add GST 18 % | - | - | - | - |
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.39 MB
NITE2-Buildings.pdf
Tender Documents • 0.38 MB
BOQ_830901.xls
BOQ • 0.28 MB
ITBE2.pdf
Additional Documents • 0.05 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .