Loading…
Loading…
| # | Company | Quoted % | Amount | Rank | Status |
|---|---|---|---|---|---|
| 1 | L1₹4.8 LAdmitted-Finance | -44.33% | ₹4.8 L | L1 | Admitted-Finance |
| 2 | L2₹5.4 LAdmitted-Finance | -38.33% | ₹5.4 L | L2 | Admitted-Finance |
| 3 | L3₹5.4 LAdmitted-Finance | -37.91% | ₹5.4 L | L3 | Admitted-Finance |
| 4 | L4₹7.4 LAdmitted-Finance | -15.21% | ₹7.4 L | L4 | Admitted-Finance |
| 5 | L5₹7.5 LAdmitted-Finance | -14.00% | ₹7.5 L | L5 | Admitted-Finance |
Updated dates
Tender Value
₹8.7 L
EMD Value
₹17,360
Closing Date
30 Dec 2025, 6:55 pmClosed
Executive Engineer
Executive Engineer RCC Lower Division Hiranagar
Improvement Renovation of Main Ravi Canal from RD 64400 to 66800M at places
2025_IFC_298713_8
e-NIT No. 03 of 2025-26
Open Tender
Civil Works - Canal
30 days
Hiranagar
As per NIT
2 documents required · 2 mandatory
₹600
Executive Engineer RCC Lower Division Hiranagar
₹17,360
Executive Engineer RCC Lower Division Hiranagar
13 Jan 2026
22 Dec 2025
31 Dec 2025
22 Dec 2025
30 Dec 2025
22 Dec 2025
22 Dec 2025 - 26 Dec 2025
26 Dec 2025
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth upto 30 cm measured at a height of 1 m above ground level and removal of rubbish upto a distance of 50 m outside the periphery of the area cleared.
Silt clearance from canals. Inclusive of initial lead and lift ( 50m & 1.5m respectively ) Dry
Extra for Two additional lift of 1.5 m or part thereof in excavation/banking excavated or stacked material : All kinds of soil :
Disposal of Silt 1Km by MT
Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-incharge: 1:3:6 or richer mix (i/c equivalent design mix)
Providing and laying in-situ concrete lining using M-10 nominal mix concrete (max. size of aggregates: 20mm nominal). In side slopes, - at a height over 3.5 m but upto 5.5m above bed
Providing and laying in-situ concrete lining using M-10 nominal mix concrete (max. size of aggregates: 20mm nominal). In beds
Curing canal lining for 28 days. In beds
Curing canal lining for 28 days. In side slopes
Extra towards allowance for scaffolding
Carriage of Materials from Source to site of work a) Carriage of Sand and bajri av. 8 Kms by Mechincal Transport
Please Enable Macros to View BoQ information
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.67 MB
BOQ_968403.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid