Loading…
Loading…
Tender ID
Tender Value
₹1.0 Cr
EMD Value
₹7.1 L
Closing Date
23 Mar 2026, 12:00 pmClosed
OFFICE OF THE SE ALIGARH CIRCLE PWD ALIGARH
OFFICE OF THE SE ALIGARH CIRCLE PWD ALIGARH
Reconstruction work of 3x3 meter 3 cell RCC box culvert at Km 27 of Chhatari-Atrauli-Kasganj road (SH-105) in Aligarh district
2026_CEALG_1126056_2
1285-Cashier (P.D.A)-A.C-25-26 dt-07.03.2026
Open Tender
Civil Works
Fixed-rate
180 days
OFFICE OF THE EE PD PWD ALIGARH
Please refer Tender documents.
2 documents required · 2 mandatory
₹2,354
₹7.1 L
Yes
8 Apr 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
23 Mar 2026
16 Mar 2026
Box Culvert 3x3m Span (3 Cell) Dismantling of existing structures like culverts, bridges, retaining walls and other structure comprising of masonry, cement concrete, wood work, steel work, including T&P and scaffolding wherever necessary, sorting the dismantled material, disposal of unserviceable material and stacking the serviceable material with all lifts and lead of 1000 metres. As per Morth Clause 2.04 (I)C, & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Earth work in excavation of foundation of structures as per drawing and technical specification, including setting out, construction of shoring and bracing, removal of stumps and other deleterious matter, dressing of sides and bottom, backfilling the excavation earth to the extent required and utilising the remaining earth locally for road work. As per Morth Clause 304B & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Sand Filling in Foundation Trenches as per Drawing & Technical Specification (As per Morth Sl.N. 15.03) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC Grade M15) As per Morth Clause 15.11 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
PCC M15 Grade leveling course below approach slab complete as per drawing and Technical specification As per Morth Clause 15.15 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (PCC Grade M20) As per Morth Clause 15.11 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Plain/Reinforced Cement Concrete in Open Foundation complete as per Drawing and Technical Specifications. (RCC Grade M25) As per Morth Clause 15.11€ & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Plain/Reinforced Cement Concrete for wall & slab etc. complete as per Drawing and Technical Specifications. (RCC Grade M25). As per Morth Clause 15.12(B) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Reinforced cement concrete approach slab including reinforcement and formwork complete as per drawing and Technical specification. As per Morth 15.16 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Supplying, Fitting and Placing un-coated HYSD bar Reinforcement in Foundation complete as per Drawing and Technical Specifications. As per Morth Clause 15.13 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Back filling behind abutment, wing wall and return wall complete as per drawing and Technical Specification (As per Morth Sl.N. 15.23) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Providing and laying Cement concrete wearing coat M-30 grade including reinforcement complete as per drawing and Technical Specifications. As per Morth Clause 15.18 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Providing weep holes in Brick masonry/ Plain/ Reinforced concrete abutment, wing wall/ return wall with 100 mm dia AC pipe, extending through the full width of the structure with slope of 1V:20H towards drawing face. Complete as per drawing and Technical Specifications (As per Morth Sl.N. 15.14) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Drainage Spouts complete as per drawing and Technical specification (As per Morth Sl.N. 15.17) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Flexible Apron: Construction of flexible apron 750mm thick comprising of loose stone boulders weighing not less than 40 kg beyond curtain wall. (As per Morth Sl.N. 16.11) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Providing and laying Flooring complete as per drawing and Technical specifications laid over cement Concrete bedding. (As per Morth Sl.N. 16.08(A)) (Including 100 mm thick PCC Bed) & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Dewatering work of undergroung water as well as surface water with the help of diesel engine pumping set during earth work in excavation of foundation for laying lean concrete and brick work in foundation including cost of Boring charges @ 5 mtr c/c distance (or as required ), hire chargeg of pumping set, fuel charges, labour and other T&P including cost of operation as per requierment at site & as directed by the Engineer-in-charge & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Diversion work Construction of sub-grade and earthen shoulders with approved material obtained from borrow pits with all lifts & leads, transporting to site, spreading, grading to required slope and compacted to meet requirement of table No. 300-2 Carted earth 2 km & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Construction of granular sub-base by providing close graded material, spreading in uniform layers with motor grader on prepared surface, mixing by mix in place method with front end loader at OMC, and compacting with vibratory roller to achieve the desired density, complete as per clause 401 & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Supply, Laying & Fixing NP-4 Hume Pipe 900 mm dia & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Box Culvert 3x3m Span (3 Cell) Providing, laying, spreading and compacting graded stone aggregate to wet mix macadam specification including premixing the Material with water at OMC in mechanical mix plant carriage of mixed Material by tipper to site, laying in uniform layers with grader in sub- base / base course on well prepared surface and compacting with vibratory roller to achieve the desired density & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Providing and applying primer coat with SS2 grade bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.70 kg/sqm using mechanical means. & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Providing and laying 55 mm Dense graded Bituminous Macadam with higher capacity batch type HMP using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 4.5 per cent by weight of total mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MoRTH specification clause No. 505 complete in all respects & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Providing and applying tack coat with bitumen (VG-10) using bitumen pressure distributor at the rate of 0.30 kg per sqm on the prepared bituminous surface cleaned with mechanical broom & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
Providing and laying 30 mm bituminous concrete with higher capacity batch type hot mix plant using crushed aggregates of specified grading, premixed with bituminous binder (VG-30) @ 5.4 per cent of mix and filler, transporting the hot mix to work site, laying with a hydrostatic paver finisher with sensor control to the required grade, level and alignment, rolling with smooth wheeled, vibratory and tandem rollers to achieve the desired compaction as per MORTH specification clause No. 507 complete in all respects & Including cost of all material, labour, T&P, labour cess and all other taxes but excluding G.S.T.
stage.html
html • 0.02 MB
cancelled_1.pdf
pdf • 0.65 MB
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 2.34 MB
BOQ_2099673.xls
BOQ • 0.25 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .