Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.1 CrAdmitted-Finance | ₹5.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹5.1 CrAdmitted-Finance | ₹5.1 Cr | L2 | Admitted-Finance |
| 3 | L3₹5.2 CrAdmitted-Finance | ₹5.2 Cr | L3 | Admitted-Finance |
| 4 | L4₹5.3 CrAdmitted-Finance 302 SHIV SADAN OPP ANAND MILAN SOC NEAR FIVE SHOP BHATIA CHOWK ULHASNAGAR 421004 | THANE | MAHARASHTRA | 421004 | ₹5.3 Cr | L4 | Admitted-Finance |
| 5 | L5₹5.4 CrAdmitted-Finance | ₹5.4 Cr | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | NAV BHARAT BUILDCON PRIVATE LIMITED L3 | Hari Ram Bhanwar Lal L2 | KAILASH CHOUDHARY L1 | Bharti Construction Company L8 | M/S RAM NARAYAN CONTRACTOR L5 | Praman Constructions pvt.ltd. L7 | MVK PROJECTS PRIVATE LIMITED L6 | DEEPAK CONSTRUCTION COMPANY L4 |
|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00 | Based on WR BSR-2023 of Zone Banswara(District Pratapgarh)
Cutting & clearance of jungle, bushes, shrubs Ankra/Ipomoea, Juliflora typna etc. on canal and bunds in dry/moist/slushy conditions including disposal as per instructions of the Engineer-in-charge. Cost of wood has been deducted from rates and thus will be property of contractor after cutting.
(a) Ordinary | 46,164 | Sqm | 1.45 ₹66,937.80 | 1 ₹46,164 | 1.31 ₹60,474.84 | 1.57 ₹72,477.48 | 2 ₹92,328 | 5.45 ₹2.5 L | 1.41 ₹65,091.24 | 1.34 ₹61,859.76 |
| 2.00 | Ploughing and picking of surface of old embankment | 4,667.42 | 10Sqm | 4.6 ₹21,470.13 | 2 ₹9,334.84 | 4.14 ₹19,323.12 | 4.97 ₹23,197.08 | 3 ₹14,002.26 | 4.6 ₹21,470.13 | 4.46 ₹20,816.69 | 4.25 ₹19,836.54 |
| 3.00 | Benching base and disposal of the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m | 3,312 | Cum | 97 ₹3.2 L | 90 ₹3.0 L | 87.31 ₹2.9 L | 104.79 ₹3.5 L | 80 ₹2.6 L | 97 ₹3.2 L | 94.05 ₹3.1 L | 89.71 ₹3.0 L |
| 4.00 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect
(ii) Hard/dense soil | 14,367.95 | Cum | 95 ₹13.6 L | 90 ₹12.9 L | 85.51 ₹12.3 L | 102.63 ₹14.7 L | 100 ₹14.4 L | 95 ₹13.6 L | 92.11 ₹13.2 L | 87.86 ₹12.6 L |
| 5.00 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect
(iii) Hard soil mixed with Kankar / boulders, Morrum | 8,209.2 | Cum | 110 ₹9.0 L | 100 ₹8.2 L | 106.21 ₹8.7 L | 127.48 ₹10.5 L | 140 ₹11.5 L | 118 ₹9.7 L | 114.41 ₹9.4 L | 109.13 ₹9.0 L |
| 6.00 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.
(i) Soft/Disintegrated rock | 4,415.26 | Cum | 150 ₹6.6 L | 150 ₹6.6 L | 144.92 ₹6.4 L | 173.93 ₹7.7 L | 165 ₹7.3 L | 161 ₹7.1 L | 156.11 ₹6.9 L | 148.9 ₹6.6 L |
| 7.00 | Excavation including loading unloading disposal and dressing of excavated rock within initial lead of 50m and lift upto 1.5m in dry or moist including dressing of excavated area, de-watering wherever required complete in all respect.
Hard rock not requiring blasting | 1,154.46 | Cum | 200 ₹2.3 L | 200 ₹2.3 L | 216.92 ₹2.5 L | 260.35 ₹3.0 L | 190 ₹2.2 L | 241 ₹2.8 L | 233.67 ₹2.7 L | 222.9 ₹2.6 L |
| 8.00 | Re-handling of excavated material including loading unloading and dressing within initial lead of 50 m and lift of 1.5m with cost of de-watering wherever required and all applicable taxes and levies etc. complete in all respect | 8,281 | Cum | 95 ₹7.9 L | 75 ₹6.2 L | 79.21 ₹6.6 L | 95.07 ₹7.9 L | 100 ₹8.3 L | 88 ₹7.3 L | 85.33 ₹7.1 L | 81.39 ₹6.7 L |
| 9.00 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.
Withintial lead of 250 m | 5,981.34 | Cum | 100 ₹6.0 L | 100 ₹6.0 L | 115.21 ₹6.9 L | 138.28 ₹8.3 L | 110 ₹6.6 L | 128 ₹7.7 L | 124.11 ₹7.4 L | 118.38 ₹7.1 L |
| 10.00 | Earth work in rough (borrow area) excavation for embankments in hard soil, morrum or highly weathered strata dry or moist, including laying in 20 cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted by vibro compactor, vibro sheep foot roller, sheep foot roller/pneumatic tyred roller to obtain dry density of at least 98% of Standard Proctor's density with initial lift of 1.5m (Excluding charges for compaction and watering) including loading and un-loading wherever required complete in all respect.
With lead beyond 250 m and up to 750 m (½ Km) | 31,970.46 | Cum | 100 ₹32.0 L | 120 ₹38.4 L | 114.76 ₹36.7 L | 137.74 ₹44.0 L | 160 ₹51.2 L | 110 ₹35.2 L | 123.62 ₹39.5 L | 117.92 ₹37.7 L |
Tender Value
₹5.7 Cr
EMD Value
₹11.4 L
Closing Date
13 Nov 2025, 6:00 pmClosed
Addl. Chief Engineer, WR Zone-Banswara
Addl. Chief Engineer, WR Zone-Banswara
Rehabilitation of Gadola Minor Irrigation Project, Tehsil and District Pratapgarh
2025_WRDAS_508752_1
ACE, WR Zone Banswara NIT 06/2025-26
Open Tender
Civil Works - Canal
730 days
Pratapgarh
Please refer Tender documents.
3 documents required · 3 mandatory
₹10,000
EE, Pipalkhunt HLCP Dn-II Pratapgarh
₹11.4 L
Addl. Chief Engineer, WR Zone-Banswara
23 Dec 2025
21 Oct 2025
14 Nov 2025
21 Oct 2025
13 Nov 2025
21 Oct 2025
30 Oct 2025
stage.html
html • 0.04 MB
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.60 MB
Bid_Document_Gadola_RWSLIP.pdf
Tender Documents • 4.39 MB
BOQ_906091.xls
BOQ • 0.32 MB
Download all tender documents and submit your bid