Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.5 LAccepted-AOC FLAT NO 2 AMEYA APARTMENT SHIV COLONY NEAR PANDAV NAGARI INDIRA NAGAR NASHIK 422009 | NASHIK | NASHIK | MAHARASHTRA | 422009 | L1 | Accepted-AOC BeingL1 | |
| 2 | L2₹15.8 L+₹2.0 L (14.4%)Rejected-Finance 02 SIDDHANT RESIDENCY NEAR AMBAD POLICE STATION SINHASTHA NAGAR CIDCO NASHIK MAHARASHTRA 422009 UDYAM MH 23 0069304 | NASHIK | MAHARASHTRA | 422009 | L2 | Rejected-Finance BEING NOT L1 | |
| 3 | L3₹15.8 L+₹2.0 L (14.6%)Rejected-Finance SR NO 331 2B PLOT NO 43 R H NO 02 BALDEWA RAO BUNGLOW NEWA NMC WATER TANK PATHARDI SHIVAR NASHIK 422 009 INDEX NO E 84CWE AF LOHEGAON PUNE | NASHIK | MAHARASHTRA | 422009 | L3 | Rejected-Finance BEING NOT L1 | |
| 4 | L4₹16.6 L+₹2.8 L (20.5%)Rejected-Finance | L4 | Rejected-Finance BEING NOT L1 | |
| 5 | L5₹17.7 L+₹3.9 L (28.1%)Rejected-Finance | L5 | Rejected-Finance BEING NOT L1 |
Tender Value
₹20 L
EMD Value
₹40,000
Closing Date
19 Mar 2022, 6:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
GE AF OJHAR
GE AF OJHAR
COMPREHENSIVE REPAIRS TO AC PLANTS AT AIR FORCE STATION DEOLALI
2022_MES_509770_1
8857/E8
Open Tender
Electrical and Maintenance Works
Item Rate
335 days
DEOLALI
Please refer Tender documents.
8 documents required · 8 mandatory
₹500
GE AF OJHAR
₹40,000
Yes
22 Apr 2022
22 Feb 2022
21 Mar 2022
23 Feb 2022
19 Mar 2022
7 Mar 2022
60 days
Amount
Comprehensive maintenance of water cooled chillar water central air conditioning plant of capacity 100 TR (2 x 50 TR Working + 1x 50 TR Stanby) Make-Voltas, comprising of following equipment mentioned below complete all as specified and directed by Engineer-in-Charge at tyre shed bldg No P-19 & P-20 a) Chillar unit Make-Voltas = 03 Sets Compressor suitable for 2X50 TR ,415 V ,50 HZ, Model No SZ185S4RC Make- Danfoss = 03 Sets b) Condensar Unit Make Voltas =03 Sets c) Chillar water pump set back pull out type monoblock, 2900 RPM,Discharge-125USGPM,Head-44 M ,Model-KCMB1055,Cap- 10HP Make Kirloskar =3 Nos. d) Condenser water pump set back pull out type monoblock,RPM 2900 Discharge 190 USGPM,Head-25 M ,Model-KCMB 537,Cap- 5HP Make Kirloskar =3 Nos.
e) Precision air conditioning unit (PAC) Make-GEA = 24 Nos Servicing & periodical maintenance of Precesion type Air conditioner of capacity 2.65TR wall mounted,Make GEA. 24 Nos installed in bldg. No. 19 & 20, by replacing unserviceable/ worn out parts of the machine cleaning of Cooling Coil unit, all filters Checking/repairs to Electrical panels ,sensor unit for proper functioning and testing and checking where required complete all as directed. (Spares for items should be measured and paid under relevent items .) ) Cooling tower round shape induced draft type water flow rate 400 US GPM,direct driven propelar fan motor of cap 5 HP, fan dia meter 1500 mm,srpay nozzle arrngement with HDPE water tank Make-Mihir -01No. g) Electrical control panel cubical type with multi funtion display unit, MCBs, Fuse,MPD with auxilary contactor etc. complete -03 Nos. h) Motor control centre cum APFC Electrical LT panel cubical type floor mounted with MCCB,MPCB,Push botton , Flash pattern voltmeter, Ammeter, ,SFU with ROH,APFC relay with contractor ,multi function meter etc. complete-01 No. j) LT panel for PAC unit, cubical type floor mounted with MCCB, MCB,Push botton , Flash pattern voltmeter, Ammeter,contractor , etc. complete- 02 Nos k) Control devices such as thermostatic expansion valve,solenoid valve and cooling thermostatic & humidity contorl switch -03 Set l) Chilled water/ Condenser/cooling tower MS/GI piping up to 125mm dia with valves pressure gauge temperature gauge complete-01Set
Note for item No 1:- Quoted rate deemed to be include with cost of following : (a) Complete maintenance and Inspection by responsible qualified and trained staff in order to keep all the euipment inservisible condition to achieve desired parameter inside the air conditional space. (b) To carry out the periodical maitenace of AC plant if necessary for effective functioning. (c) The contractor shall be responsible for proper functioning of all electrical/mechanical equipment and maintain the same in sound condition to aviod the accident and breakdown. (d) Routine checks necessary for satisfactory running the above plant and cooling tower complete all as diected by Engineer-in-charge. (e) Topping up of gas in case of leakage,compressor oil refill,descaling,repair to compressor, Condensor, motor,pump electrical panel,water supply valves,leakage,leaking refrigerant valves etc. (f) To attend the breakdown during day and night including holiday and putting the plant in working condition in shortest possible time and including suffiecient stock of spares avilable always to insure smooth and regular functioning of AC plant .The employee shall required to keep their own T&P to attend the fault/break down in quick succession also contractor require to provide PVC insulation tape roll /Teflon tape roll,rubber gasket & safety equipments etc. (g) Major Spares parts & Gas etc shall be measured &paid under respective item. (h) Spares for items should be measured and paid under relevent srl items 2 to 18, 23 to 25 (j) Contractor should provide skilled man power for comprensive maintenance ie 01 FGM for two days and 02 Helpers for two days per every month
Supply only Power transformer 240/24 volt AC,6.67 A. as per sample Sutabile for PAC's Make GEA Completed all as directed
Supply only water pressure switch as sutibale at site Complete all as directed by Enggener- In- Charge.
Supply only water pressure gauge 4"dia of range 0 to 150 PSI Make - Febig as sutibale at site Complet all as directed by Enggener- In- Charge.
Supply only crankcase heater of compressor Make- Danffos SM 185 Complet all as directed by Enggener- In- Charge.
Supply only control cut out online of central type AC plant.
Supply only High Pressure Cut Out sutable as per sample complete all as directed.
Supply only Low Pressure Cut Out sutable as per sample complete all as directed.
Supply only universal/Strainer filter cum dryier suitable for Chilled Water Plant as per site requirement complete all as directed.
M&L for checking and testing of interlock panel wiring,detecting the fault/defects including replacement of minor burnt wires, lugs, terminal, etc.complete all as directed.
Supply only wet & dry bulb thermometer of A/C plant room.
Supply only single phase preventor in electric panel board of central type AC plants all as per direction of Eng-in-charge.
Supply only pilot solenoid valve assembly for central type AC plant as per sample complete all as directed.
Supply only water pressure gauge 4" dia with tube to match & cypon cock 3/8" for range 0 to 7 kg Pressure complete all as directed.
Supply only 3 pole power contactor, coil voltage 230/415 Volts for capacity 18 Amps to 25Amps, MNX type, 240,50Hz motors
All as per item no-above but Contactor with coil voltage of capacity 70 A, MNX70,2NO+2NC, 240/415V, AC,
All as per item no-16 above but ADDON Block .2NO+2NC,AC.
Supply only electronic timer type ST 100, 240 volts 50 HZ suitable for base mounting and DIN mounting complete all as dircted. Make : L&T.
M&L for leak repairing & gas charging of Central Type AC. Plant (Chilled Water Systems) AT Bldg. 19 & 20, 216 & 217 (Capacity 50 TR Each) a)Repairs in refrigeration systems leak of any by "O" Ring and Gland Packing ,services Valves / Oil seal b) charging dry nitrogen & holding pressure for 24 hours. c) Vacuum with double stage Vacume pump of (-) 2Kg/cm2 vaccum pressure d) Charging R 407, Including top up the Compressor Oil and charging the gas at various Plant all as specified and directed by Eng- in- charge. Note:- Refregarant gas R 407 and Nitrogen gas compressor Oil will be measured and paid separately under revelent Item. 20 & 21
Supply only Nitrogen gas at required perssure for leak testing of central A/C Plant complete all as directed by engineer-In- Charge .
Supply Only Refregrant Gas R 407C complete all as directed by engineer-In- Charge .
M&L for De-scaling the shell and tube type condensser (Four Condensers each plant) by circulating de- scaling chemical through for 4/ 6 hours Opening the end cover of condenser and cleaning inner tube manually with the help of nylon / wire brush until complete scale to be removed and flush out with fresh water. Reassembling the end cover including replacment of gasket, nuts bolts ,washer etc. as required and testing complete all as directed by Eng.- in Charge. ) Central Type AC. Plant (Chilled Water Systems) AT Bldg. 19 & 20, 216 & 217 of capacity 50 TR Each.
Supply only electronic auto sensor unit (PC card with all component) suitable for GEA.Make 2.65 TR And 3.25 TR capacity complete all as directed.
Supply only tempreture sensor of PAC unit complete wall/floor mounted type complete all as per directed.
Supply only humidity sensor of PAC unit wall/floor mounted type complete all as per directed.
Disconnecting the electrical and mechanical connection of burnt electrical motors of blower of PAC unit from the existing site / location, transporting to and return back from work shop. Rewinding of electrical motors by dismantling and removing the burnt copper winding wire, cleaning the slots of stator with petrol and brushes, winding polyster based super enamelled copper wire of same gauge of original one with proper class of insulation including varnishing and heating the coil and remove air bubbles complete stator / roter after rewinding reassembling all parts including re-installing connection to original position and testing on full load all as directed by Engineer -in -charge.(tyre shed bldg No P-19 & P-20 & P-216,217).
All as per item No-1 as above 100 TR (2 x 50 TR Working + 1x 50 TR Stanby) Make-Voltas but with and including 16 Nos PAC at bldg No P-216 & P- 217. Comprehensive maintenance of water cooled chillar water central air conditioning plant of capacity 100 TR (2 x 50 TR Working + 1x 50 TR Stanby) Make-Voltas, comprising of following equipment mentioned below complete all as specified and directed by Engineer-in-Charge at tyre shed bldg No P-216 & P-217 a) Chillar unit Make-Voltas = 03 Sets Compressor suitable for 2X50 TR ,415 V ,50 HZ, Model No SZ185S4RC Make- Danfoss = 03 Sets b) Condensar Unit Make Voltas =03 Sets c) Chillar water pump set back pull out type monoblock, 2900 RPM,Discharge-125USGPM,Head-44 M ,Model-KCMB1055,Cap- 10HP Make Kirloskar =3 Nos. d) Condenser water pump set back pull out type monoblock,RPM 2900 Discharge 190 USGPM,Head-25 M ,Model-KCMB 537,Cap- 5HP Make Kirloskar =3 Nos.
(e) Servicing & periodical maintenance of Precesion type Air conditioner of capacity 3.65 TR floor mounted, Make GEA 18 Nos installed in Bldg. no. P-216 & P- 217. by replacing unserviceable/ worn out parts of the machine cleaning of Cooling Coil unit, all filters Checking/repairs to Electrical panels ,sensor unit for proper functioning and testing and checking where required complete all as directed (Spares for items should be measured and paid under relevent srl items 38 (a) & (b) f) Cooling tower round shape induced draft type water flow rate 400 US GPM,direct driven propelar fan motor of cap 5 HP, fan dia meter 1500 mm,srpay nozzle arrngement with HDPE water tank Make-Mihir -01No. g) Electrical control panel cubical type with multi funtion display unit, MCBs, Fuse,MPD with auxilary contactor etc. complete -03 Nos. h) Motor control centre cum APFC Electrical LT panel cubical type floor mounted with MCCB,MPCB,Push botton , Flash pattern voltmeter, Ammeter, ,SFU with ROH,APFC relay with contractor ,multi function meter etc. complete-01 No. j) LT panel for PAC unit, cubical type floor mounted with MCCB, MCB,Push botton , Flash pattern voltmeter, Ammeter,contractor , etc. complete- 02 Nos k) Control devices such as thermostatic expansion valve,solenoid valve and cooling thermostatic & humidity contorl switch -03 Set l) Chilled water/ Condenser/cooling tower MS/GI piping up to 125mm dia with valves pressure gauge temperature gauge complete-01Set
Note for item No 27 :- A) Quoted rate deemed to be include with cost of following : (a) Complete maintenance and suprvision by responsible qualified and trained staff in order to keep all the euipment inservisible condition to achieve desired parameter inside the air conditional space. (b) To carry out the periodical maitenace of AC plant if necessary for effective functioning. (c) The contractor shall be responsible for proper functioning of all electrical/mechanical equipment and maintain the same in sound condition to aviod risk of the accident and breakdown. (d) Routine checks necessary for satisfactory running the above plant and cooling tower complete all as diected by Engineer-in-Charge. (e) Topping up of gas in case of leakage,compressor oil refill,descaling,repair to compressor, Condensor, motor,pump electrical panel,water supply valves,leakage,leaking refrigerant valves etc. (f) To attend the breakdown during day and night including holiday and putting the plant in working condition in shortest possible time and including suffiecient stock of spares avilable always to insure smooth and regular functioning of AC plant .All employee shall required to keep their own T&P to attend the fault/break down in quick succession also contractor require to provide PVC insulation tape roll /Teflon tape roll,rubber gasket & safety equipments etc. (g) Major Spares part shall be measured &paid under respective item. (h) Spares for items should be measured and paid under relevent srl items 28 to 44
Supply only Pressure relif valve 0 to 300 PSI Sutable as per sample complete all as directed.
Supply only catchall filters for Liquid line, working pressure 500 PSI Suitable for R 407 C Gas including arragement for installation of filter if required ( Make:- Sporlon or Equivalent
Supply only butterfly valve with maching double flanges ,gasket, necessary hardware complete all as specified and all as directed for the 65 mm bore size
All as per item no-30 above but 80mm bore
All as per item no-30 above but100mm bore
Supply only 15 mm bore Gun-metal, globe or gate valves, with iron wheel head, screwed both ends for iron pipe and fixed globe valve cast copper alloy to match with the existing of following size including cutting welding/brazing required if any all as required at site.
All as per item no-33 above but 25 mm bore
All as per item no-33 above but 40 mm bore
Supply only Ball / Roller bearing for Sprinlkler top and bottom Hub for 100 TR Capacity complete all as directed.
Supply only thermal expansion valve suitable for 50 TR Chilled water Central type AC plant system all as per sample, including brazing at both ends all as required and directed.
Supply only circuit board for Presion A.C. unit suitable for make- GEA. or equivalent connecting to existing system complete all as directed.
Supply only bimetal over load RELAY MN2 9-15A Range
All as per item no-above but RELAY MN2 14- 23A
Supply only balancing valves for Chilled water line of 32 mm dia sizes
All as per item no-41 above but 25 mm dia.
All as per item no-41 above but 80 mm dia.
Supply and Fix in replacement of universal/Strainer filter cum dryier suitable for Chilled Water Plant as per site requirement complete all as directed.
Taking Out burnout / unservicebale blower with Motor of PAC unit Floor / Wall mounted type 3.65 TR, 2.6 TR and Supply & fix New Blower with motor Model:- ebmpapst R4E355-AG02-05-230v-50Hz ( Made In Germany) complete suitable fixing arrangement for existing Phase as per existing model and makeof capacity 3.65 TR PAC' unit complete all directed-
Supply only 3 way motorised modulating valves suitable for Precision air conditioning unit (PAC) of 25 mm dia size
All as per item no-46 above but 32 mm dia.
M&L for disconnecting electrical connections of motor located at the top of cooling tower,keep cables at safe custody for reconnection and dismantling and taking out fan blade assembly along with motor mounted on base frame at the top of cooling tower after cutting/dismentaling all nuts, bolts and fixtures from the mounting frame and removing whole assembly including motor and base frame from the top of cooling tower with the help of T&P for servicing of cooling tower suitable for 100 TR capcity including following complete :- (i) Cleaning /scrapping of inner& outer surface of FRP basin, repair of damaged portion if any incuding FRP lining of all surfaces joints to avoid leakage including replacement of all nuts and bolts joining all parts of Basin complete. (ii) servicing cooling tower plant through cleaning re-agent complete pipe line,including servicing of cooling tower motor and fan and make the necessary alignment with motor. (iii) Replacement of bearing if any of suitable cap if any after necessory work including gressing and replacement of nut bolts and preventing leakage if any by means of suitable adetives etc all as directed and specified. (iv) Taking out PVC fills blocks, cleaning , refixing and replacing if unserviceable as per existing location and channel direction. (v) Servicing of spray header and sprinkler assy complete. (vi) Cleaning of water strainer complete. Spares should be measured and paid under relevent srl items 49 to 52
Supply only cooling tower fan blade set as per existing model and site requirment all as specified and directed by Engr - in - Charge.
Supply only PVC Fills (small size) in colums of size 60 x 15 x 15 cm or next higher size as per existing specification and requirement complete all as directed.
S& F in replacment of Float valve (brass) 25MM complete all as directed.
Supply only Ball / Roller bearing for Sprinlkler top and bottom Hub for Central AC Plant complete all as directed.
M&L for repairs to condenser/chiller pumps including dismantling of Pump of 5 HP capacity and segregating to its parts for repairs replacement of shaft bearing, impeller key, shaft sleeve, impeller and grinding/ polishing, bend removing etc complete including painting by two coats of synthetic enamel paint reassembling of pump after completion of work & testing satisfaction complete all as directed by Engineer in charge. Notes : (i) Supply of bearing and sleeve, impeller will be measured and paid separetly under respective items. 55 to 62
All as per item no-53 above but10 HP
Supply only of spare parts of Shaft bearing of 5 HP pumpset as per existing specifications.
All as per item no-55 above but Shaft sleeve of 5 HP pumpset
All as per item no-55 above but Impeller of 5 HP pumpset
All as per item no-55 above but Impeller Keys of 5 HP pumpset
All as per item no-55 above but Shaft bearing of 10 HP pumpset
All as per item no-55 above but Shaft sleeve of 10 HP pumpset
All as per item no-55 above but Impeller of 10 HP pumpset
All as per item no-55 above but Impeller Keys of 10 HP pumpset
Disconnecting the electrical and mechanical connection of burnt electrical motors from the existing site / location, transporting to and return back from work shop. Rewinding of electrical motors by dismantling and removing the burnt copper winding wire, cleaning the slots of stator with petrol and brushes, winding polyster based super enamelled copper wire of same gauge of original one with proper class of insulation including varnishing and heating the coil and remove air bubbles complete stator / roter after rewinding reassembling all parts including re-installing connection to original position and testing on full load all as directed by Engineer -in -charge for different capacity of motor as per 10 HP Chiller Pump set
All as per item no-63 above but 5 HP Condensser Pump set
All as per item no-63 above but 3 HP CT Fan Motor
M&L for Painting of air conditioning plant with equipments,pump set,water suction /discharge / liquid piping of any specification with enamel paint of approved quality after prepration of surface including fitments e.g., condenser , chillar,valves etc as per colour code of Cental air cinditioning plants including writing MES / SM No complete all as directed.
S& F in repair MCCB 125 amp, 16 KA ,3 Pole,415 V, AC complete all as directed.
S& F in repair MCCB 100 amp, 16 KA ,3 Pole,415 V, AC complete all as directed.
S& F in repair MCCB 63 amp, 35 KA ,3 Pole,415 V, AC complete all as directed.
S& F in repair MPCB range 9-14 amp, AC complete all as directed.
S& F in repair MPCB Range 14-23 amp, AC complete all as directed.
S& F in repair MCB DP 32 amp, 10 KA ,230 V, AC complete all as directed.
S& F in repair MCB DP40 amp, 10 KA ,230 V, AC complete all as directed.
Supply Fix in repair digital volt meter 0 to 500 volt complete all as directed
Supply Fix in repair digital ammeter 0 to 400 A complete all as directed
Supply & Fix in replacment of HRC Fuse 63 AMP Fuselink HF 63A Cylindrical complete all as directed.
Supply & Fix in replacment of Indication Lamp R-Y-B Set complete all as directed.
Supply & Fix in replacment of Push Button in Red/Blue/Yellow complete all as directed.
Material & Labour for removal of 32 mm dia size of pipe as existing Unservicable damaged insulation from chilled water pipe and M&L for chilled water pipe insulation half section PUF shall be bonded to the Surface of pipe with adhesive and binded with metal binding wire. This lnsulation should be covered with fibre glass clothing and finally be finished with zylon base weather proof coating with two coats of AC ducting E 96 (Fevicol Make) as under:- (a) M&L for cleaning the pipe surface (to be insulated) by scrapping carefully with wire brush etc. to make the surface completely free of millscale, dirt, dust, grease and other foreign materials, taking special care so that all Pipe joints are sealed against any leakage. (b) The adhesive shall be used for bonding the seams securely together including butt & logitudinal joints, fittings and coverings must be closed with adhesive. (c) The adhesive shall be specially formulated fot the pipe insulation applicationand supplied by the insulatin manufacturer and have excellent bonding to porousand non porous surfaces.
All as per item no-79 above but 40 mm Dia
All as per item no-79 above but 50mm Dia
All as per item no-79 above but 65mm Dia
All as per item no-79 above but 80mm Dia
All as per item no-79 above but100mm dia.
All as per item no-79 above but 125 mm Dia
M& L for replacement of existing worn out MS AC duct with made out of 5 mm thick MS sheet and necessary required welding, bend to shape, cutting and fixing with nut bolt and washer and providing necessary wire mesh for prevent to rats in the duct including painting with 2 coats of synthetic enamel paint over a coat of redoxide primer complet all as directed..
SHRI SULAI ELECTRICALS
Shree Sai Samarth Enterprises
M/s Yash Trading Company
YASHRAJ ELECTRICALS
Shri Sai Enterprises
DIAMOND ENTERPRISES
M/s Vijay Airconditioning Pvt Ltd
BALAJI REFRIGERATION
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .