Loading…
Loading…
| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹2.1 CrAdmitted-Finance 184 TENGPUNA PULWAMA PULWAMA PULWAMA JAMMU KASHMIR 192301 UDYAM JK 15 0009999 | PULWAMA | JAMMU AND KASHMIR | 192301 | ₹2.1 Cr | L1 | Admitted-Finance |
| 2 | L2₹2.5 Cr+₹36.0 L (16.8%)Admitted-Finance | ₹2.5 Cr+₹36.0 L (16.8%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | M/S BASHIR AHMAD AND SONS L1 | M/S Rather and Sons L2 |
|---|---|---|---|---|---|
| 1.00Note: (i) Please refer Schedule 'A' Notes given in tender documents. (ii) The Schedule 'A' Part-VII is not estimated by MES and the estimated rate indicated as "Rs. 0.00" under Col. 5 signifies this fact only. | |||||
| 2.00LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | |||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I. | 1 | Each | 91,00,000 ₹91,00,000 Lowest | 1,10,00,000 ₹1,10,00,000 |
| 2.02 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS carried forward from Pre-Priced Schedule 'A' Part-II. | 1 | Each | 45,00,000 ₹45,00,000 Lowest | 55,00,000 ₹55,00,000 |
| 2.03 | Lump sum price worked out by the contractor for ROAD, PATH AND CULVERT WORKS carried forward from Pre-Priced Schedule 'A' Part-III. | 1 | Each | 3,90,000 ₹3,90,000 Lowest | 4,00,000 ₹4,00,000 |
| 2.04 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-IV. | 1 | Each | 59,00,000 ₹59,00,000 Lowest | 59,00,000 ₹59,00,000 Lowest |
| 2.05 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-V. | 1 | Each | 1,20,000 ₹1,20,000 Lowest | 1,50,000 ₹1,50,000 |
| 2.06 | Lump sum price worked out by the contractor for SITE CLEARANCE & EARTHWORKS carried forward from Pre-Priced Schedule 'A' Part-VI. | 1 | Each | 9,00,000 ₹9,00,000 Lowest | 15,00,000 ₹15,00,000 |
| 3.00MISCELLANEOUS ITEMS OF WORKS (SCHEDULE 'A' PART-VII) (A) SEWAGE DISPOSAL WORKS | |||||
| 3.01 | Demolition/Cutting of existing road, black top surfaces of any description and in any position not otherwise specified to through sewage line and making good to disturbed surfaces with returning & filling earth incl ramming, hard core 100mm thick, PCC 1:2:4 type B1 20mm graded crushed stone aggregate 75mm thick over subbase of PCC 1:4:8 type D2 40mm graded crushed stone aggregare 100 mm thick to match the existing surfaces complete all as specified and directed. | 10 | Running Metre | 300 ₹3,000 Lowest | 1,000 ₹10,000 |
Tender Value
₹2.3 Cr
EMD Value
₹3.0 L
Closing Date
18 Aug 2026, 6:00 pmClosed
CE 31 Srinagar Zone
HQ CE 31 Srinagar Zone
AUGUMENTATION OF EXISTING SEWAGE INFRA, AREA DRAINAGE INCLUDING PROVISION OF UNDERGROUND SUMPS AT HAFT CHINAR UNDER GE 970 EWS
2026_MES_772723_1
800184
Open Tender
Civil Works
Lump-sum
450 days
GE 970 EWS
As per tender documents
11 documents required · 11 mandatory
₹2,000
GE 970 EWS
₹3.0 L
Yes
27 Aug 2026
2 Jul 2026
20 Aug 2026
2 Jul 2026
18 Aug 2026
1 Aug 2026
2 Jul 2026 - 13 Jul 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 2LUMPSUM/ OTHER PRE-PRICED PROVISIONAL SCHEDULES OF WORKS | |||||
| 2.01 | Lump sum price worked out by the contractor for BUILDING WORKS carried forward from Pre-Priced Schedule 'A' Part-I. | 1 | Each | 99,12,454 | ₹99,12,454 |
| 2.02 | Lump sum price worked out by the contractor for SEWAGE DISPOSAL WORKS carried forward from Pre-Priced Schedule 'A' Part-II. | 1 | Each | 47,76,353.3 | ₹47,76,353.3 |
| 2.03 | Lump sum price worked out by the contractor for ROAD, PATH AND CULVERT WORKS carried forward from Pre-Priced Schedule 'A' Part-III. | 1 | Each | 3,62,306.18 | ₹3,62,306.18 |
| 2.04 | Lump sum price worked out by the contractor for AREA DRAINAGE WORKS carried forward from Pre-Priced Schedule 'A' Part-IV. | 1 | Each | 63,75,858.36 | ₹63,75,858.36 |
| 2.05 | Lump sum price worked out by the contractor for EXTERNAL WATER SUPPLY WORKS carried forward from Pre-Priced Schedule 'A' Part-V. | 1 | Each | 1,23,371.21 | ₹1,23,371.21 |
| 2.06 | Lump sum price worked out by the contractor for SITE CLEARANCE & EARTHWORKS carried forward from Pre-Priced Schedule 'A' Part-VI. | 1 | Each | 14,92,199.5 | ₹14,92,199.5 |
| 3MISCELLANEOUS ITEMS OF WORKS (SCHEDULE 'A' PART-VII) (A) SEWAGE DISPOSAL WORKS | |||||
| 3.01 | Demolition/Cutting of existing road, black top surfaces of any description and in any position not otherwise specified to through sewage line and making good to disturbed surfaces with returning & filling earth incl ramming, hard core 100mm thick, PCC 1:2:4 type B1 20mm graded crushed stone aggregate 75mm thick over subbase of PCC 1:4:8 type D2 40mm graded crushed stone aggregare 100 mm thick to match the existing surfaces complete all as specified and directed. | 10 | Running Metre | - | - |
| 4(B) EXTERNAL WATER SUPPLY WORKS | |||||
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.21 MB
BOQ_868823.xls
BOQ • 3.71 MB
TenderhalfChinarMerged.pdf
Tender Documents • 1.43 MB
DrgHalfChinar.pdf
Additional Documents • 4.43 MB
CorrigendumNo1OtherwithDrgMerged.pdf
PDF • 39.20 MB
CorrigendumNo1OtherwithDrgMerged.pdf
PDF • 39.20 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .