| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹1.4 CrAdmitted-Finance | ₹1.4 Cr | L1 | Admitted-Finance |
| 2 | L2₹1.4 Cr+₹4.5 L (3.35%)Admitted-Finance | ₹1.4 Cr+₹4.5 L (3.35%) | L2 | Admitted-Finance |
| 3 | L3₹1.5 Cr+₹11.3 L (8.30%)Admitted-Finance GOVT CONTRACTOR VPO DHASOLI TEHSIL JAWALI DISTT KANGRA H P | KANGRA | HIMACHAL PRADESH | 175013 | ₹1.5 Cr+₹11.3 L (8.30%) | L3 | Admitted-Finance |
| 4 | L4₹1.5 Cr+₹11.5 L (8.48%)Admitted-Finance | ₹1.5 Cr+₹11.5 L (8.48%) | L4 | Admitted-Finance |
| 5 | L5₹1.6 Cr+₹21.7 L (16.0%)Admitted-Finance | ₹1.6 Cr+₹21.7 L (16.0%) | L5 | Admitted-Finance |
| Sl No | Description | Qty | Unit | jrg constructions L7 | Sushil Kumar L3 | J&Sons Construction Pvt Ltd L9 | INDER MOHAN GUPTA L5 | ASHOK KUMAR SHARMA L6 | MOHD IDRIS SHAN L8 | GAFOOR AHMED L1 | RAJINDER SINGH L4 | M/S AJAY SINGH CONTRACTOR L2 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m. | ||||||||||||
| 1.10 | All kinds of soil. | 1,547.7 | Cum | 120 ₹1,85,724 | 70 ₹1,08,339 Lowest | 350 ₹5,41,695 | 150 ₹2,32,155 | 100 ₹1,54,770 | 100 ₹1,54,770 | 135 ₹2,08,939.5 | 70 ₹1,08,339 Lowest | 115 ₹1,77,985.5 |
| 2.00 | Extra over excavation for excavation in muddy excavation | 1,547.7 | cum | 120 ₹1,85,724 | 20 ₹30,954 Lowest | 89 ₹1,37,745.3 | 30 ₹46,431 | 100 ₹1,54,770 | 60 ₹92,862 | 70 ₹1,08,339 | 20 ₹30,954 Lowest | 150 ₹2,32,155 |
| 3.00 | Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared. | 4,002 | Sqm | 20 ₹80,040 | 10 ₹40,020 | 10 ₹40,020 | 5 ₹20,010 | 3 ₹12,006 Lowest | 70 ₹2,80,140 | 20 ₹80,040 | 10 ₹40,020 | 7 ₹28,014 |
| 4.00Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level. | ||||||||||||
| 4.10 | 1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 20 mm nominal size). | 2,422.93 | Cum | 3,900 ₹94,49,427 | 4,000 ₹96,91,720 | 6,200 ₹1,50,22,166 | 4,500 ₹1,09,03,185 | 4,000 ₹96,91,720 | 4,750 ₹1,15,08,917.5 | 3,450 ₹83,59,108.5 Lowest | 4,010 ₹97,15,949.3 | 3,500 ₹84,80,255 |
| 4.20 | 1:5:10 (1 cement : 5 coarse sand(zone-III) : 10 graded stone aggregate 40 mm nominal size) | 281.4 | Cum | 2,500 ₹7,03,500 | 3,000 ₹8,44,200 | 1,500 ₹4,22,100 Lowest | 2,500 ₹7,03,500 | 3,300 ₹9,28,620 | 1,900 ₹5,34,660 | 1,950 ₹5,48,730 | 3,000 ₹8,44,200 | 2,200 ₹6,19,080 |
| 5.00Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level. | ||||||||||||
| 5.10 | 1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size) | 281.4 | Cum | 6,500 ₹18,29,100 | 5,300 ₹14,91,420 | 8,700 ₹24,48,180 | 5,500 ₹15,47,700 | 5,500 ₹15,47,700 | 5,320 ₹14,97,048 | 5,420 ₹15,25,188 | 5,300 ₹14,91,420 | 5,100 ₹14,35,140 Lowest |
| 6.00Centring and shuttering including strutting, propping etc. and removal of form for | ||||||||||||
Tender Value
₹2.0 Cr
Closing Date
30 Jan 2023, 4:00 pmClosed
Estates Officer
Estates Division SKUAST Jammu Main Campus Chatha
Strengthening Modernization of University Farm by way of Restoration Training and reshaping of perennial nallahs and protection work in cement concrete alongside the banks of the nallah to prevent erosion of soil at Main Campus Chatha
2023_SKUST_202750_2
AU/Estates/22-23/10 dated 06-01-2023
Open Tender
Civil Works
Item Rate
540 days
Main Campus Chatha
Please refer tender documents
4 documents required · 4 mandatory
₹3,000
Yes
Assistant Comptroller Estates SKUAST Jammu
Exempted
6 Feb 2023
18 Jan 2023
31 Jan 2023
18 Jan 2023
30 Jan 2023
18 Jan 2023
Amount
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m in width or 10 sqm on plan) including dressing of sides and ramming of bottoms, lift up to 1.5 m, including getting out the excavated soil and disposal of surplus excavated soil as directed, within a lead of 50 m.
All kinds of soil.
Extra over excavation for excavation in muddy excavation
Clearing jungle including uprooting of rank vegetation, grass, brush wood, trees and saplings of girth up to 30 cm measured at a height of 1 m above ground level and removal of rubbish up to a distance of 50m outside the periphery of the area cleared.
Providing and laying in position cement concrete of specified grade excluding the cost of centring and shuttering. All work upto plinth level.
1:3:6 (1 Cement : 3 coarse sand(zone-III) : 6 graded stone aggregate 20 mm nominal size).
1:5:10 (1 cement : 5 coarse sand(zone-III) : 10 graded stone aggregate 40 mm nominal size)
Providing and laying in position specified grade of reinforced cement concrete excluding the cost of centring, shuttering, finishing and reinforcement- All work upto plinth level.
1:1.5:3 (1 cement: 1.5 coarse sand: 3 graded stone aggregate 20 mm nominal size)
Centring and shuttering including strutting, propping etc. and removal of form for
Foundations, footings, bases of columns etc. for mass concrete.
Walls (any thickness) including attached pilasters, buttresses, plinth and string courses etc.
Reinforcement for R.C.C work including straightening, cutting, bending, placing in position and binding all complete
Cold twisted bars/ mild steel and MT steel
15 mm cement plaster on the rough side of single or half brick wall of mix :
1:6 (1 cement: 6 fine sand)
Providing & laying stone solin in position with stone of specified size.
Filling earth beyond the walls for reclaimation of waste land.
Dewatering by way of using motor pumps of specified capacity.
M/S AJAY SINGH CONTRACTOR
Sushil Kumar
RAJINDER SINGH
INDER MOHAN GUPTA
ASHOK KUMAR SHARMA
jrg constructions
MOHD IDRIS SHAN
J&Sons Construction Pvt Ltd
stage.html
html • 0.04 MB
tech_bid_open.pdf
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .