| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L-1₹20.0 LAccepted-AOC 8TH WAD BCM ROAD BANDIKERI KAMALAPUR BELLARY KARNATAKA 583221 | VIJAYNAGAR | KARNATAKA | 583221 | L-1 | Accepted-AOC being L-1 | |
| 2 | L-2₹20.2 L+₹19,962.76 (1.00%)Rejected-AOC | L-2 | Rejected-AOC not being L-1 | |
| 3 | L-3₹20.4 L+₹40,069.50 (2.01%)Rejected-AOC | L-3 | Rejected-AOC not being L-1 | |
| 4 | L-4₹20.5 L+₹58,021.41 (2.91%)Rejected-AOC | L-4 | Rejected-AOC not being L-1 | |
| 5 | L-5₹20.7 L+₹78,563.15 (3.94%)Rejected-AOC | L-5 | Rejected-AOC not being L-1 |
Tender Value
₹19.5 L
EMD Value
₹48,700
Closing Date
13 Aug 2021, 11:00 amClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
SA ASI Bangalore
The superintending Archaeologist Bangalore Circle 5th Floor F Wing Kendriya Sadan Koramangala Bangalore 560034
MW Cons to Someshwara Temple at Kolar
2021_ASI_640018_1
T-15/11/Sep/20/5119031/CON
Open Tender
Miscellaneous Works
Works
365 days
kolar
Please refer Tender documents.
7 documents required · 7 mandatory
₹1,180
Yes
SA ASI BANGALORE
₹48,700
Yes
2 Sept 2021
24 Jul 2021
16 Aug 2021
24 Jul 2021
13 Aug 2021
24 Jul 2021
24 Jul 2021 - 13 Aug 2021
240 days
MW (Cons) to MW (Cons) to Someshwara Temple at Kolar.
Dismantling Damaged, water seeping lime concrete weather proof course of 45CM including removal of debris, disposing faraway from the monument premises etc., including cost erection of scaffolding, cost all materials, tools, labour cost Hiring charges of Machineries etc., complete as per the direction of the works in charge
Dismantling Damaged out of Plumb Enclosure wall with Mantapa adjacent to the Entrance Gopura in the South eastern side of the Main Temple, including dismantling out of plumb architectural members, beams, etc., stacking out required materials faraway from the working area after proper documentation, numbering etc., complete, disposal of unwanted materials from the monument premises
Earth work excavation for, mantapa, plinth portions, around temple for providing plinth protection course, tree rounds etc.,providing lime concrete for flooring inside the enclosure wall of Mantapa including cost of all materials labour, Hiring Charges of Machineries, tools etc., complete as per the instructions of the work in charge
Providing sand filling, providing Lime concrete to provide a hard surface for laying Plinth Protection Course or Stone Flooring average thickness of 10CM thickness, laid to fall with 20MM & 40MM nominal size Granite aggregate and 40% lime mortar 1:1:1(1 lime putty :1 Surkhi : 1Sand) rammed and finished with Gur Bhelgiri treatment, etc., including cost of all materials labour, Hired charges of Machineries, tools etc., complete as per the specifications and directions of the work in charge
Providing and laying Stone flooring to the Mantapa or plinth protection course with Granite Stone Slab of average 0.6M x 1.0M and 10CM thick, chisel dressed, with three line dressed, edge cutting for joints, with lime surkhi mortar 1:2 including flus pointing, curing etc., cost of all materials, labour, Hired Charges of Machineries etc., complete as per the instructions of the work in charge
Filling the joints of roof slab joints with Lime Surkhi Mortar 1:1:2 laid with fall to 40% 12mm Granite Jelly treated with Gur, Bhelgiri, Jaggery, AntuwalaKakkai, Kadukkai, yellow oxide, red oxide etc. including levelling the slab joints, curing, making ready surface for providing and laying W.P.C, one week before, cost of all materials, labours , Hiring charges of all Machineries, Tools etc., Complete
Construction of Storm water drain with Size Stone Masonry to distract the rainwater from water logging the area, to allow the storm water drain flow inside to stranded out, with CM 1:4 laid over 1:2:4 Concrete for flooring, plastering the size stone masonry with CM 1:6, flooring rounding, providing 1:2:4 concrete on top for coping, providing 2line dressed granite stone slabs on top of drains, etc.,etc., complete including cost of all materials, labour, HOM as per the specifications, directions of the work in charge
Rec construction of Cloister Mantapa Enclosure wall with 60% available stones and 40% of New Stones of three line chisel dressed, edge cutting, pulmane finishing, lining, camouflaged with the old pattern, ashlar masonry, paper joint finishing, with Lime Mortar 1:2 treated with treated with Gur, Bhelgiri, Jaggery, AntuwalaKakkai, Kadukkai, yellow oxide, red oxide etc. in traditional method, including cost of all materials labour, HOM complete as per the directions of the work in charge
Reconstruction of cloister Mantapa, stacked available stone members with Lime Mortar 1:2 treated with treated with Gur, Bhelgiri, Jaggery, AntuwalaKakkai, Kadukkai, yellow oxide, red oxide etc. in traditional method, including cost of all materials labour, HOM complete as per the directions of the work in charge
M V KASHINATH
M N NAIDU CONSTRUCTIONS
GURAYYA V NIMBALAGUNDI
GOPAL V KATTI
SRI RAGHAVENDRA CONSTRUCTION
stage.html
html • 0.05 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .