Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Tender Value
₹2.0 Cr
EMD Value
₹2.0 L
Closing Date
27 Nov 2026, 5:30 pm5d left
Eligibility, documents, scope, Go/No-Go checksEligibility, required documents, scope of work and Go/No-Go checks for this tender, in one click.
Superintending Engineer
O/o Superintending Engineer RWSS Division Jagatsinghpur at-Punanga Near Police Barek
CONSTRUCTION OF LABORATORY BUILDING FOR RWSS DIVISION, AT JAGATSINGHPUR IN THE DISTRICT OF JAGATSINGHPUR
2026_RWSS_145487_1
RWSS / 37 / 2026-2027
Open Tender
Civil Works - Water Works
Percentage
330 days
Jagatsinghpur
Please refer Tender documents.
2 documents required · 2 mandatory
₹10,000
₹2.0 L
Yes
Jagatsinghpur
27 Nov 2026
9 Nov 2026
30 Nov 2026
9 Nov 2026
27 Nov 2026
9 Nov 2026
9 Nov 2026 - 13 Nov 2026
13 Nov 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earth work in excavation hard soil in foundation with initial lead and lift including rough dressing and breaking the clods to maximum 5cm to 7cm in size and laying the layers notexceeding 0.30m in depth as per specification and approved by the department. | 163.65 | Cum | 235.74 | ₹38,578.05 |
| 2 | Single under reamed pile foundation with RCC M25 using 12mm size black hard granite crusher broken chips including cost of borring but excluding cost of M.S./Tor steel and labour charges for cutting, bending and binding of steel. | 67 | nos | 10,239.5 | ₹6,86,046.5 |
| 3 | Filling in foundation trenches and plinth, with excavated earth including laying the earth in layers not exceeding 23.5 cm thick ramming & watering with all leads & lifts including cost of all labour,T&P completed as directed by the Engineer-in-charge. | 109.64 | Cum | 157.16 | ₹17,231.53 |
| 4 | Supplying Filling foundation and plinth (F&P) with sand well watered and rammed including all cost and complete finished in all respect as per direction of the Engineer-in-charge. | 132.58 | Cum | 597 | ₹79,147.87 |
| 5 | Cement concrete (1:3:6) with 4cm HG crusher broken metal in foundation and plinth including all cost and complete as per direction of the Engineer-in-charge. | 54.42 | Cum | 6,703.65 | ₹3,64,785.82 |
| 6 | Brickwork with Fly Ash Bricks 25cmx12cmx8cm having crushing not less than 35kg/cm² in C.M (1:6) in Foundation and Plinth including cost of all and complete finished in all respect. | 20.48 | Cum | 5,574.73 | ₹1,14,170.52 |
| 7 | Brickwork with Fly Ash Bricks 25cmx12cmx8cm having crushing not less than 35kg/cm² in C.M (1:6) in Superstructure including cost of all and complete finished in all respect. | 9.74 | Cum | 5,608.06 | ₹54,622.53 |
| 8 | R.C.C. work of M-25 using 20mm and down graded hard granite Crusher broken chips including laying, hoisting, Centring & shuttering with all cost, conveyance etc. complete. (a) RCC Footing | 65.6 | Cum | 7,558.23 | ₹4,95,819.89 |
| 9 | RCC Plinth Beam | 12.98 | Cum | 8,432.63 | ₹1,09,455.54 |
| 10 | RCC Column in Super Structure | 7.31 | Cum | 16,941.08 | ₹1,23,839.29 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 1.00 MB
pdf.pdf
Tender Documents • 4.52 MB
BOQ_618954.xls
BOQ • 0.47 MB
1st_Coorigendum.pdf
PDF • 0.50 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .