Beautification of Pond at Pindarkom (Balumath) under Amrit Sarovar Yojana CSR Action Plan 2026-27, near TTK OCP, Rajhara Area.
2026_CCL_365609_1
SO(C)/RA/e-tender/15/26-27/252 dt-16.09.2026
Open Tender
Civil Works - Others
Percentage
120 days
TTKOCP
as per NIT
8 documents required · 8 mandatory
₹98,900
16 Sept 2026
16 Sept 2026
5 Oct 2026
17 Sept 2026
2 Oct 2026
17 Sept 2026
17 Sept 2026 - 24 Sept 2026
This is a percentage-rate BOQ. The schedule below shows estimated quantities and rates. Bidders quote a single percentage above or below the total estimated cost.
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Earthworkinexcavationbymechanicalmeans(Hydraulicexcavator)/manualmeansoverareas(exceeding30cmindepth,1.5minwidthas well as 10 sqm on plan) including getting out and disposal of excavated earth lead upto 50 m and for all lift, as directed by Engineer-in-charge. 2.6.1 All kinds of soil | 5,020.08 | cum | 139.7 | ₹7,01,305.18 |
| 2 | Providing and laying in position cement concrete ofspecifiedgradeexcludingthecostofcenteringandshuttering-Allworkuptoplinth level : 1:4:8(1 Cement :4coarsesand(zone-Ill)derivedfromnaturalsources:8gradedstoneaggregate40mmnominal sizederivedfromnatural
sources) | 63.55 | cum | 6,072.4 | ₹3,85,876.73 |
| 3 | Providing and laying in position cement concrete ofspecifiedgradeexcludingthecostofcenteringandshuttering-Allworkuptoplinth level : 1:2:4(1 cement :2coarsesand(zone-Ill)derivedfromnaturalsources:4gradedstoneaggregate20mmnominalsizederivedfromnatural
sources | 95.7 | cum | 7,424.45 | ₹7,10,549.56 |
| 4 | Providingandlayinginpositionspecifiedgradeof reinforcedcementconcrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 5.1.2 1:1.5:3(1cement:1.5coarsesand(zone-Ill)derivedfromnaturalsources:3gradedstoneaggregate20mmnominalsizederivedfromnatural sources) | 32.58 | cum | 8,343.45 | ₹2,71,854.63 |
| 5 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing inpositionandbindingall completeuptoplinth level. | 2,798.88 | kg | 105.6 | ₹2,95,561.73 |
| 6 | Centering and shuttering including strutting, propping etc. and removal of form for Foundations, footings, bases of columns, etc. for mass concrete | 26.04 | sqm | 277.9 | ₹7,236.52 |
| 7 | Centering and shuttering including strutting, propping etc. and removal of form for Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. | 189.6 | sqm | 562.75 | ₹1,06,697.4 |
| 8 | Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 900 mm dia RCC pipes. | 15 | m | 9,088.75 | ₹1,36,331.25 |
| 9 | Providing and laying Non Pressure NP-4 class (Heavy duty) R.C.C. pipes including collars/spigot jointed with stiff mixture of cement mortar in the proportion of 1:2 (1 cement : 2 fine sand) including testing of joints etc. complete 1200 mm dia RCC pipes. (Laying by manual/ machanical means) | 15 | m | 6,111.3 | ₹91,669.5 |
| 10 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in foundation and plinth in: Cement mortar 1:6(1 cement :6 coarse sand) | 123.34 | cum | 6,770.05 | ₹8,35,011.2 |
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.05 MB
Tendernotice_1.pdf
PDF • 2.57 MB
BOQ_378562.xls
BOQ • 0.27 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .