| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹25.9 LAccepted-Finance | ₹25.9 L | L1 | Accepted-Finance Quoted Below |
| 2 | L2₹26.0 L+₹11,163.90 (0.43%)Rejected-Finance | ₹26.0 L+₹11,163.90 (0.43%) | L2 | Rejected-Finance Quoted Above |
| Sl No | Description | Qty | Unit | VRK Construction L1 | PTK and CO L2 |
|---|---|---|---|---|---|
| 1.00Name of Work:Renewal to the road at Mettupalayam Teachers colony road opposite CTC (R-110) H/o Chikkadasampalayam panchayat | |||||
| 2.00 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | 30.91 | Cum | 4,871 ₹1,50,562.61 Lowest | 4,890 ₹1,51,149.9 |
| 3.00 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 5,543.75 | Sqm | 34.8 ₹1,92,922.5 Lowest | 35 ₹1,94,031.25 |
| 4.00 | Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508. | 138.59 | Cum | 11,366 ₹15,75,213.94 Lowest | 11,400 ₹15,79,926 |
| 5.00 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS Km 0/0 - 1/0 | 30 | Cum | 499 ₹14,970 Lowest | 500 ₹15,000 |
| 6.00 | Km 1/0 - 1/430 | 12.9 | Cum | 510 ₹6,579 Lowest | 520 ₹6,708 |
| 7.00 | Road Marking by providing and laying of hot applied Thermoplastic Compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes. | 289.38 | Sqm | 890 ₹2,57,548.2 Lowest | 900 ₹2,60,442 |
| 8.00 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | 1 | GST Amount (in Rupees) | 3,95,603 ₹3,95,603 Lowest | 3,97,306 ₹3,97,306 |
Tender Value
₹26.4 L
EMD Value
₹26,350
Closing Date
17 Feb 2026, 3:00 pmClosed
Block Development Officer (BP), Karamadai
Block Development Office, Karamadai
Renewal to the road at Mettupalayam Teachers colony road opposite CTC (R-110) H/o Chikkadasampalayam panchayat under UGF 2025-26 in Karamadai Block,Coimbatore District
2026_RDTN_656286_1
Roc No.912/2025/A2 Dt.11.02.2026
Open Tender
Civil Works
Item Rate
90 days
Karamadai
Please refer Tender documents.
5 documents required · 5 mandatory
₹0
₹26,350
15 Sept 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
17 Feb 2026
13 Feb 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Name of Work:Renewal to the road at Mettupalayam Teachers colony road opposite CTC (R-110) H/o Chikkadasampalayam panchayat | - | - | - | - |
| 2 | Advance patch work for making up the undulation in the existing B.T surface to an average thickness of of 25mm using 13.20mm IRC size HBG metal | 30.91 | Cum | - | - |
| 3 | Providing and laying Tack coat over BT surface using 3Kg of bitumen 60/70 for 10sqm area including cost and conveyance of bituminous binder including labour charges for preparing the surface and applying the required quantity of bitumen as tack coat | 5,543.75 | Sqm | - | - |
| 4 | Providing and laying Bituminious concrete which shall consists of construction of a single course binder /wearing corse on a previosly prepared Bituminous base to the requirements of the specification using 60/70 grade bitumen as per MorRTH specificaton CI.508. | 138.59 | Cum | - | - |
| 5 | Collection and supply of gritty gravel from appd quarry including cost and conveyance of all materials to site including all labour charges for spreading and compaction with power roller etc.complete, for SHOULDERS Km 0/0 - 1/0 | 30 | Cum | - | - |
| 6 | Km 1/0 - 1/430 | 12.9 | Cum | - | - |
| 7 | Road Marking by providing and laying of hot applied Thermoplastic Compound 2.5 mm thick including reflectorising glass beads @ 250 gms per sqm area, thickness of 2.5mm exclusive of surface applied glass beads as per IRC:35. The finished surface to be level, uniform and free from streaks and holes. | 289.38 | Sqm | - | - |
| 8 | GST Amount for providing Service to Government Contract Works for the above Construction Works. { GST Amount is the Total GST Amount for total overall quoted amount above this row in column "BB" for all works in this package} | - | GST Amount (in Rupees) | - | - |
stage.html
html • 0.03 MB
tech_eval.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 0.48 MB
pricebid.pdf
Tender Documents • 0.97 MB
BOQ_786977.xls
BOQ • 0.32 MB
technicalbid.pdf
Tender Documents • 1.13 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .