| 1 | L1₹1.4 LAccepted-Finance | L1 | Accepted-Finance QUALIFIED | |
| 2 | L2₹1.9 L+₹52,645.10 (37.6%)Accepted-Finance | L2 | Accepted-Finance QUALIFIED | |
| 3 | L3₹2.0 L+₹58,614 (41.9%)Accepted-Finance | L3 | Accepted-Finance QUALIFIED | |
| 4 | L4₹2.0 L+₹60,037.50 (42.9%)Accepted-Finance | L4 | Accepted-Finance QUALIFIED |
Tender Value
₹2 L
EMD Value
₹2,000
Closing Date
30 Mar 2020, 11:00 amClosed
SUPERINTENDING ENGINEER
EDC III BULANDSHAHR
DIFFERENT TYPE OF ELECTRIFICATION WORK IN FULL DEPOSIT SCHEME UNDER THE AREA OF EDD DEBAI
2020_PVVNL_452737_1
T-30/EDC-III/BSR/2019-2020
Open Tender
Electrical Works
Lump-sum
15 days
DIBAI
DIFFERENT TYPE OF ELECTRIFICATION WORK IN FULL DEPOSIT SCHEME UNDER THE AREA OF EDD DEBAI
2 documents required · 2 mandatory
₹1,180
ICICI BANK
₹2,000
Yes
1 Apr 2020
20 Mar 2020
30 Mar 2020
20 Mar 2020
30 Mar 2020
20 Mar 2020
Amount
fo|qr forj.k [k.M&fMckbZ ds vUrxZr iw.kZ tek;kstUkkUrxZr fofHkUu izdkj ds fo|qrhdj.k ,oa la;kstu fuxZr djus laca/kh dk;ZA
Carriage of fallowings from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms.
PCC Pole 8.5 mtr Long.
Carriage of All line Material from store center BSR to j.e store Sub station as ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Erection of Single pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Erection of Double pole/Scation Pole support including complete 1 IT fittings as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Single support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Grouting of Double pole support shall be grouted with cement, sand and birck ballast/stone ballast in ratio 1:4:8 =30x3030 cms. including the cost of cement, sand, birck ballast/stone ballast, etc. as per actual size requirement, as per RESPO manual and as per direction of Engineer in charge including the cost of labour, T&P and carrier etc. required for proper completion of work.
Carriage of All line Material from J.E store Sub station to Pit Site ACSR Weasel conductor, ABC conductor GI Wire, Earth Wire. M.S. Chanel, Angle, Stay & Earthig Rods, Barbed Wire. Disc Insulator etc.
Cutting /drilling /Welding of MS Angle iron for making guarding angle size 65x65x6/50x50x6 mm including the work of fixing the bracket on PCC/ST pole for construction of the line.
Carriage of T/F from ESC. BSR to pit site on kachcha pacaa road including loading and unloading chagres at both ends, rcquricd for proper completion of work, distance about to 60 Kms.
10 KVA T/F
63 KVA T/F
25 KVA T/F
fixing of 11 Kv Stay rod with Stay wire in proper way with Nozelling
Grouting of 11 Kv Stay rods
Laying, sagging. Stringing and binding and jumpering of ACSR Weisal , rabbit, dog newly erected pole as per RESPO manual and as per direction of supervising engineer. It includes the cost of labour, T&P, carrier etc. requried for proper completion of work.
ACSR weisal conductor
ABC Cable 3*95 Square MM
Fixing of Earthing rod
Fixing of pin insulator
Fixing disc insulator
Fixing of Sub station Set for T/F
Mounting & Installation of T/F From D/P
10 KVA T/F
63 KVA T/F
25 KVA T/F
The folloing material is required to be supplied by the contractor.
Holding clamp
Double Pole clamp
F clamp
Distribution Box
Distribution Box Clamps.
LT Clamp
PG Clamp
J hook
Piercing Connector
Earth clamp
Stay clamp
dead & clamps
Stay insulator for 11 Kv
Suspension clamps
LT Insulator
X Arm Holding clamp.
Bolt & nut off size.
M S Enterprises
NEHA ENTERPRISES
M/S TUSHAR CONSTRUCTION
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .