| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.9 LAccepted-AOC | L1 | Accepted-AOC Awarded | |
| 2 | L2₹15.5 L+₹1.6 L (11.4%)Rejected-Finance R O VILLAGE NALAG P O PAHAL SUB TEH SUNI DISTT SHIMLA | SHIMLA | HIMACHAL PRADESH | 171001 | L2 | Rejected-Finance 2nd Lowest | |
| 3 | L3₹16.1 L+₹2.2 L (15.7%)Rejected-Finance | L3 | Rejected-Finance 3rd Lowest |
Tender Value
Refer Docs
EMD Value
₹37,000
Closing Date
15 Jun 2021, 4:00 pmClosed
Executive Engineer Division No-IHPPWD Shimla-3
Executive Engineer Division No-IHPPWD Shimla-3
Widening /Improvement Khalini Vihar road (SH C/O Retaining Wall, P/F crash barrier and formation defencies
2021_PWD_48150_7
SD-ICTR-Tender-2021-3012 dt 24-05-2021
Open Tender
Civil Works
Item Rate
60 days
Simla
As per SBD
14 documents required · 14 mandatory
₹500
₹37,000
2 Mar 2023
7 Jun 2021
16 Jun 2021
7 Jun 2021
15 Jun 2021
7 Jun 2021
Amount
Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm (Thirty centimetre) in depth, 1.5 m (One point five metre) in width as well as 10 sqm (ten Square Metre) on plan) including getting out and disposal of excavated earth all lead and lift as directed by Engineer-in-charge and sorting out useful and unuseful material and transportation of the unuseful material for disposing at dumping site (To be arranged by the contractor) as per satisfaction of Engineer- in -charge through all modes of transportation including head load ,animal load or mechanical means along with its leveling fine dressing and with all kinds of labour, machineries, tools equipments and safety measures and incidentals necessary to complete the work by mechanical means and labour ( if required ) Any loss to the public and private propriety, human being, machinery during the course of execution and disposal of serviceable and unserviceable materials shall be the absolute responsibility of the contractor and shall have to be duly compensated by him in all respects including all incidental charges. (i)All kinds of soil
Earth work in excavation by mechanical means (Hydraulic excavator) / manual means in foundation trenches or drains (not exceeding 1.5 m (One point five metre) in width or 10 sqm (ten Square Metre)on plan) in all kinds of soil. including dressing of sides and ramming of bottoms including setting out, construction of shoring and bracing, removal of stumps and other deleterious materials and disposal in all leads and lifts including dressing of sides and bottom and back filling in trenches with excavated suitable materials. All work of rock cutting by blasting shall be carried out by taking all necessary precautions against soil erosion damage to hill side water pollution etc. and to protect stability of hill side rock shall be excavated with chiseling and wedging out rock (where blasting is prohibited) all earth work in cutting/ excavation including rock excavation shall be carried out true to lines grades, side slopes, width , camber super elevation and level as shown on the drawings or as directed by the Engineer-in-charge hauling and stacking of materials useful for construction at suitable sites and safe disposal of unsuitable cut materials in specified dimension or as directed by the Engineer-in-Charge. If the foundation of the structure is in an area with stagnant water or water is met with in the excavation due to spring seepage rain and other causes it shall be remove by suitable diversion bailing out or pumping as directed and the area of the foundation or embankment shall be kept dry. All the surplus excavated earth to be dumped at dumping site(dumping sites will be arranged by the contractor on his own cost).Any loss to the public or private property during the course of excavation shall be the sole responsibility of the contractor which shall have to be dully compensated by him at his on cost in all cases. including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge.
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(i)1:5:10 (one cement : five fine sand : ten graded stone aggregate 40 mm(forty milimetre) nominal size)
Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge. (i)1:4:8 (one Cement : four coarse sand) : eight graded stone aggregate 40 mm(forty milimetre) nominal size)
Centering and shuttering including strutting, propping etc. and removal of form for including carriage of materials in all leads and lifts as per directions of the Engineer-in-Charge.(i)Foundations, footings, bases of columns, etc. for mass concrete.
Supplying, filling, spreading & leveling stone boulders of size range 5 cm to 20 cm (five centimetre to twenty centimetre), in recharge pit, in the required thickness, for all leads & lifts, all complete as per direction of Engineer-in-Charge.
Providing weapholes in brick masonry / stone masonry /plain reinforced concrete abutment, wing wall, return wall with 100 mm(One hundred milimetre) dia PVC pipe extending through the full with of the structures with slop of 1(v):20(H) towards drawing face complete as per drawing and technical specification clauses 614, 709, 1204.3.7 including carriage of materials in all leads and lifts as per the directions of the Engineer-in-Charge.
Providing and Fixing Single "W" Metal beam crash barrier comprishing of cold formed W profiled section having thickness of 3 mm (three milimetre)(uncoated thickness ) with frame width of 311 mm(three hundred eleven milimetre) depth 83 mm (eighty three milimetre)and length 4318 mm(four thousand three hundred eighteen milimetre) (made of ISI marked HR coil conforming to IS : 5986/2011) , to be fixed on cold formed channel section post of size 150x75x5 mm (One hundred fifty into seventy five into five milimetre)( Made from ISI marked Hr Coils conforming to IS 5986/2011) spaced 1.50 metre(one point five zero metre) centre to centre of the post which will be of total height of 1.80 metre(One point eight zero metre) with its height of 1.1 metre(One point one metre) below ground level and 0.70 metre(zero point seven zero metre) above ground level. Metal beam rail to be fixed on the vertical post with spacer channel of cold formed channel section size 150x75x5 mm and 330 mm(One hundred fifty into seventy five into five milimetre) and (three hundred thirty milimetre) long (made from ISI Marked HR coils conforming to IS : 5986/2011 ) , All the above components shall - conform to clause 810 of MORTH &H specifications including all fittings required for erection on road side W-Beams, Posts , Spacers shall be hot dip galvanised with Zinc coating of 550 gm/Sqm(five hundred fifty gramt/swquare metre). All bolts , nuts and washers shall be hot dip galvanised to IS :1367 pt-XIII/1983 ( Reaffirmed 2011 ) for bolts and IS 14394/1996 ( reaffirmed 2011 ) for nuts (including high intesity grade all weather proof reflective sheeting multi colour tape fixed with mechenically means with high visibility (CAUTIONARY) from long distance) i.e. in fog porn area black spot and narrow curves etc. including carriage of materials in all leads and lifts as per the direction of Engineer-in- charge.
Kuldeep Sharma
Devi Prakash Sharma
stage.html
html • 0.05 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .