| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹5.0 LAdmitted-Finance | ₹5.0 L | L1 | Admitted-Finance |
| 2 | L2₹5.1 L+₹7,542.82 (1.51%)Admitted-Finance | ₹5.1 L+₹7,542.82 (1.51%) | L2 | Admitted-Finance |
| Sl No | Description | Qty | Unit | FAYAZ AHMAD DAR L1 | M/S Farooq Ahmad Bhat L2 |
|---|---|---|---|---|---|
| 1.00Construction of foundation Blocks of various Equipments at Rec/stn Kremshore | |||||
| 2.00 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by engineer in charge from cutting edge All kinds of soils. | 20.9 | cum | 199 ₹4,159.1 Lowest | 500 ₹10,450 |
| 3.00 | Providing and laying of Stone soling. | 3.2 | cum | 700 ₹2,240 Lowest | 1,000 ₹3,200 |
| 4.00 | Providing and laying of Mud Mat | 2.5 | cum | 2,900 ₹7,250 | 2,000 ₹5,000 Lowest |
| 5.00 | Providing and laying in position specified grade of reinforced cement conc. excluding the cost of centering, shuttering, finishing -and reinforcement All work upto plinth level, M20 grade concrete (1:1.5:3) | 20.3 | cum | 6,200 ₹1,25,860 | 5,000 ₹1,01,500 Lowest |
| 6.00 | Providing and laying in position specified grade cement conc. excluding the cost of centering, shuttering, finishing -and reinforcement All work upto plinth level, M15 grade concrete (1:2:4) | 1.13 | cum | 5,600 ₹6,328 | 5,000 ₹5,650 Lowest |
| 7.00 | Providing and fixing of Centering & shuttering incld. strutting, propping etc. & removal of form for:- Foundations, footings, bases for columns etc | 42.84 | sqm | 190 ₹8,139.6 Lowest | 200 ₹8,568 |
| 8.00 | Providing and laying of 12 mm thick cement plaster on the block faces above ground level of mix:1:6 (1: cement :6 fine sand) | 18.12 | sqm | 99 ₹1,793.88 Lowest | 200 ₹3,624 |
| 9.00 | Providing and fixing of re-inforcements 10mm and 12mm tor steel for foundations including bending and cutting | 1,665 | kg | 70 ₹1,16,550 Lowest | 73 ₹1,21,545 |
| 10.00 | providing and fixing of iron rail for transmormer foundation of size ISBM 200 | 223 | kg | 170 ₹37,910 | 100 ₹22,300 Lowest |
Tender Value
₹7.0 L
EMD Value
₹13,960
Closing Date
18 Jul 2026, 4:30 pmClosed
Executive Engineer, STD-II, Rajbagh,Srinagar
Office of the Executive Engineer, STD-II, Rajbagh
Civil Works Concreating Around Vital installtions at Receiving station Kremshore.
2026_PDD_313780_1
eNIT No STD-II / 42 of 2026-27 Dated 25-06-2026
Open Tender
Civil Works
Turn-key
Budgam
Please refer Tender documents.
3 documents required · 3 mandatory
₹500
Executive Engineer, STD-II, Rajbagh,Srinagar
₹13,960
29 Jul 2026
27 Jun 2026
20 Jul 2026
27 Jun 2026
18 Jul 2026
27 Jun 2026
| Sl No | Description | Qty | Unit | Est. Rate | Est. Amount |
|---|---|---|---|---|---|
| 1 | Construction of foundation Blocks of various Equipments at Rec/stn Kremshore | - | - | - | - |
| 2 | Earth work in excavation by manual means in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed by engineer in charge from cutting edge All kinds of soils. | 20.9 | cum | - | - |
| 3 | Providing and laying of Stone soling. | - | cum | - | - |
| 4 | Providing and laying of Mud Mat | - | cum | - | - |
| 5 | Providing and laying in position specified grade of reinforced cement conc. excluding the cost of centering, shuttering, finishing -and reinforcement All work upto plinth level, M20 grade concrete (1:1.5:3) | - | cum | - | - |
| 6 | Providing and laying in position specified grade cement conc. excluding the cost of centering, shuttering, finishing -and reinforcement All work upto plinth level, M15 grade concrete (1:2:4) | 1 | cum | - | - |
| 7 | Providing and fixing of Centering & shuttering incld. strutting, propping etc. & removal of form for:- Foundations, footings, bases for columns etc | - | sqm | - | - |
| 8 | Providing and laying of 12 mm thick cement plaster on the block faces above ground level of mix:1:6 (1: cement :6 fine sand) | - | sqm | - | - |
| 9 | Providing and fixing of re-inforcements 10mm and 12mm tor steel for foundations including bending and cutting | - | kg | - | - |
| 10 | providing and fixing of iron rail for transmormer foundation of size ISBM 200 | - | kg | - | - |
stage.html
html • 0.03 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.48 MB
Tendernotice_2.pdf
PDF • 1.61 MB
BOQ_1015711.xls
BOQ • 0.26 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .