| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹6.0 CrAccepted-AOC 04 L BLOCK MARKET SECTOR 11 NOIDA 201301 UP GAUTAM BUDHA NAGAR | GAUTAM BUDDHA NAGAR | UTTAR PRADESH | 201301 | ₹6.0 Cr | L1 | Accepted-AOC AOC |
| 2 | L2₹6.0 Cr+₹4.3 L (0.73%)Rejected-Finance I 910 JAHANGIR PURI NEAR BY ANAND MAYA HOSPITAL NORTH WEST DELHI DELHI 110033 UDYAM DL 06 0040830 | NORTH DELHI | DELHI | 110033 | ₹6.0 Cr+₹4.3 L (0.73%) | L2 | Rejected-Finance not lowest |
| 3 | L3₹6.4 Cr+₹42.8 L (7.19%)Rejected-Finance | ₹6.4 Cr+₹42.8 L (7.19%) | L3 | Rejected-Finance not lowest |
| 4 | L4₹6.6 Cr+₹69.1 L (11.6%)Rejected-Finance 5037 5038 URBAN ESTATE PH 1 PATIALA 147002 PUNJAB | PATIALA | PATIALA | PUNJAB | 147002 | ₹6.6 Cr+₹69.1 L (11.6%) | L4 | Rejected-Finance Not lowest |
| 5 | L5₹6.8 Cr+₹88.8 L (14.9%)Rejected-Finance 2 11 SADAR BAZAR DELHI CANTT 110010 | DELHI | NEW DELHI | DELHI | 110010 | ₹6.8 Cr+₹88.8 L (14.9%) | L5 | Rejected-Finance not lowest |
| Sl No | Description | Qty | Unit | Megha Construction Co. L5 | SATISH AND CO L2 | GEPS PROJECTS L1 | Sant Construction Co. L4 | mayur enterprises L9 | R D Bansal L8 | M P TYAGI ENGINEERS AND CONTRACTORS L7 | SAGGI ELECTRIC COMPANY L6 | B D RAIZADA PROJCTS PVT LTD L3 |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| 1.00SCHEDULE `A' PART - I (Building / Structure Works) is not prepriced by MES and prepriced rates indicates 0.00 under column 5 signifies this fact only. | ||||||||||||
| 1.01 | M&L for construction of sub station building with duty room and toilet complete all as specified and shown on drawings. | 1 | Each Block | 48,23,000 ₹48,23,000 | 56,90,000 ₹56,90,000 | 57,00,000 ₹57,00,000 | 65,00,000 ₹65,00,000 | 90,00,000 ₹90,00,000 | 39,10,000 ₹39,10,000 | 24,99,999 ₹24,99,999 Lowest | 69,99,300 ₹69,99,300 | 59,00,000 ₹59,00,000 |
| 2.00NOTE: Schedule ‘A’ Part II to VI under Ser No 2.01 to 2.05 are Prepriced by MES. | ||||||||||||
| 2.01 | Lump sum price worked out by the Contractor for “ SITE CLEARANCE, EXCAVATION AND EARTH WORK” as listed in Schedule ‘A’ Part-II | 1 | Pre priced | 13,96,850.94 ₹13,96,850.94 | 9,50,000 ₹9,50,000 | 12,60,000 ₹12,60,000 | 13,96,850.94 ₹13,96,850.94 | 11,25,000 ₹11,25,000 | 13,45,000 ₹13,45,000 | 9,99,999 ₹9,99,999 | 1,81,711 ₹1,81,711 Lowest | 10,49,000 ₹10,49,000 |
| 2.02 | Lump sum price worked out by the Contractor for “INTERNAL ELECTRIC SUPPLY" as listed in Schedule ‘A’ Part-III | 1 | Pre priced | 1,63,000 ₹1,63,000 | 80,000 ₹80,000 Lowest | 1,50,000 ₹1,50,000 | 1,87,355.25 ₹1,87,355.25 | 1,50,000 ₹1,50,000 | 1,48,000 ₹1,48,000 | 1,49,999 ₹1,49,999 | 1,42,335 ₹1,42,335 | 2,19,000 ₹2,19,000 |
| 2.03 | Lump sum price worked out by the Contractor for “INTERNAL WATER SUPPLY ” as listed in Schedule ‘A’ Part-IV | 1 | Pre priced | 14,000 ₹14,000 | 13,500 ₹13,500 | 7,500 ₹7,500 Lowest | 12,638.89 ₹12,638.89 | 12,000 ₹12,000 | 14,800 ₹14,800 | 9,999 ₹9,999 | 7,531 ₹7,531 | 13,190 ₹13,190 |
| 2.04 | Lump sum price worked out by the Contractor for “EXTERNAL ELECTRIC SUPPLY" as listed in Schedule ‘A’ Part-V | 1 | Pre priced | 60,00,000 ₹60,00,000 | 57,00,000 ₹57,00,000 | 60,00,000 ₹60,00,000 | 47,86,593.86 ₹47,86,593.86 | 48,00,000 ₹48,00,000 | 44,50,000 ₹44,50,000 | 39,99,999 ₹39,99,999 Lowest | 1,06,26,000 ₹1,06,26,000 | 67,19,000 ₹67,19,000 |
| 2.05 | Lump sum price worked out by the Contractor for “LIGHTENING PROTECTION ” as listed in Schedule ‘A’ Part-VI | 1 | Pre priced | 1,20,000 ₹1,20,000 | 1,50,000 ₹1,50,000 | 8,40,000 ₹8,40,000 | 1,16,196.12 ₹1,16,196.12 | 1,10,000 ₹1,10,000 | 94,000 ₹94,000 Lowest | 99,999 ₹99,999 | 1,13,336 ₹1,13,336 | 1,74,890 ₹1,74,890 |
| 3.00SCHEDULE `A' PART - VII MISC ITEMS (B/R & E/M) is not prepriced by MES and prepriced rates indicated as 0.00 under column 5 signifies this fact only. | ||||||||||||
| 3.01 | M&L for sand cushoning with a layer of sand 80mm thick before laying of cable and 150mm thick after laying of cable C and punned down 100mm to trenches complete all as specified and directed by Engineer-in-Charge | 131.87 | Cum | 550 ₹72,528.5 | 800 ₹1,05,496 | 900 ₹1,18,683 | 1,500 ₹1,97,805 | 1,000 ₹1,31,870 | 1,400 ₹1,84,618 | 499 ₹65,803.13 Lowest | 755 ₹99,561.85 | 1,790 ₹2,36,047.3 |
Tender Value
₹7.7 Cr
EMD Value
₹7.1 L
Closing Date
3 Oct 2025, 6:00 pmClosed
HQ CE (AF) WAC PALAM
HQ CE (AF) WAC PALAM
PROVN OF ELECTRICAL INFRASTRUCTURE AT MCC AT AF STN BASANT NAGAR
2025_MES_722296_1
CEWAC/FBD/T-11/2025-26
Open Tender
Civil Works
Lump-sum
450 days
GE (AF) FARIDABAD
AS PER NIT AND TENDER DOCUMENTS
8 documents required · 8 mandatory
₹3,000
GE (AF) FARIDABAD
₹7.1 L
Yes
6 Nov 2025
22 Aug 2025
6 Oct 2025
22 Aug 2025
3 Oct 2025
26 Sept 2025
stage.html
html • 0.07 MB
tech_bid_open.pdf
tech_eval.pdf
fin_bid_open.pdf
boq_comp_chart.xlsx
xlsx
fin_eval.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.04 MB
Tendernotice_1.pdf
PDF • 6.95 MB
BOQ_813957.xls
BOQ • 0.37 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .