| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹13.4 LAccepted-AOC | ₹13.4 L | L1 | Accepted-AOC As per transparent lottery system. |
| 2 | L2₹13.4 L+₹1,845.95 (0.14%)Rejected-AOC | ₹13.4 L+₹1,845.95 (0.14%) | L2 | Rejected-AOC As per transparent lottery system. |
| 3 | L2₹13.4 L+₹1,845.95 (0.14%)Rejected-AOC | ₹13.4 L+₹1,845.95 (0.14%) | L2 | Rejected-AOC As per transparent lottery system. |
| 4 | L2₹13.4 L+₹1,845.95 (0.14%)Rejected-AOC | ₹13.4 L+₹1,845.95 (0.14%) | L2 | Rejected-AOC As per transparent lottery system. |
| 5 | L2₹13.4 L+₹1,845.95 (0.14%)Rejected-AOC AT WARD NO 6 PO BHUBAN DIST DHENKANAL | BHUBAN | DHENKANAL | ODISHA | ₹13.4 L+₹1,845.95 (0.14%) | L2 | Rejected-AOC As per transparent lottery system. |
Tender Value
₹16.8 L
EMD Value
₹16,781
Closing Date
9 Feb 2026, 5:00 pmClosed
EXECUTIVE OFFICER
HINJILICUT MUNICIPALITY
Construction of RCC Drain with Cover Slab near Mission Shakti Gruha in Ward No. 04 Under Hinjilicut Municipality
2026_ORULB_125103_3
HIN-MUN-05/2025-26
Open Tender
Civil Works - Others
Percentage
30 days
HINJILICUT MUNICIPALITY
Please refer Tender documents.
2 documents required · 2 mandatory
₹6,000
₹16,781
Yes
7 Sept 2026
30 Jan 2026
10 Feb 2026
30 Jan 2026
9 Feb 2026
30 Jan 2026
30 Jan 2026 - 5 Feb 2026
Earth work in excavation in Hard soil within 50 Mtr initial lead and 1.5 mtr. initial lift including rough dressing the bed as per direction of engineer in charge ( In Foundation & Plinth )
Conveyance of surplus materials i.e. earth , dimatalled materials within 5 K.M. lead without loading into tractor/tipper but with unloading at disposal site etc. complete.
Filling foundation and plinth with sand well watered and rammed as per direction of EIC.
Providing Cement Concrete (1:3:6) using 40mm size hard black granite Crusher broken metal approved quality from approved quarry including hoisting laying using concrete mixture and vibrators including cost, carriage, royalty, cost of all labour T.&P. etc complete and as directed by E.I.C.
Providing R.C.C. M-20 grade with 20mm and down grade C.B. chips of approved quality from approved quarry including hoisting, laying hire charges of concrete mixture, vibrator, watering, curing and cost of all materials and labour, T&P centering shuttering etc complete but excluding cost of reinforcement . RCC foundation, column bases etc.
RCC wall
R.C.C. slabs
Cutting, bending, binding M.S. or tor rod R.C.C. work including tying the grills and placing in position including cost of steel and binding wire.
Providing 6 mm thick CP (1:4) with slurry treatment to RCC / Masonmry surface etc compelte
Providing Cement concrete ( 1: 2 : 4 )_using 12 mm size hard granite crusher broken chips for PCC / R.C.C. works including hoisting and laying
Engagement of Excavator for Dismantling of Steps / Plinths & all type of encroachment & Engagement of Tractor Tralley for Disposal of Dismantling Materials from Encroachment . ( Actual Payment will be made as per the rate mentioned in Hire Charges of Plant & Machineries of SoR 2022 as certified by Engineer in Charge. )
Providing photographs, placing & fixing of transperancy board at work site, repairing of existing water supply connection etc complete.
stage.html
html • 0.05 MB
tech_eval.pdf
fin_eval.pdf
aoc.pdf
finance_577869.pdf
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 3.08 MB
BOQ_577869.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .