| # | Company | Amount | Rank | Status |
|---|---|---|---|---|
| 1 | L1₹95.2 LAccepted-AOC | ₹95.2 L | L1 | Accepted-AOC 1st lowest |
| 2 | L2₹1.0 CrRejected-AOC NOT SPECIFIED | ₹1.0 Cr | L2 | Rejected-AOC 2nd lowest |
| 3 | L3₹1.1 CrRejected-AOC HOUSE NO 8 SHYAM SHAKUNYH DHAM GALI NO 5 DEFENCE COLONY HUNAMAL PYAU BHIWANI HARYANA 127021 | BHIWANI | BHIWANI | HARYANA | 127021 | ₹1.1 Cr | L3 | Rejected-AOC 3rd lowest |
| 4 | L4₹1.4 CrRejected-AOC ASADUNA TODRAN TEHSIL BAHADURGARH DISTRICT JHAJJAR 124505 HARYANA | BAHADURGARH | JHAJJAR | HARYANA | 124505 | ₹1.4 Cr | L4 | Rejected-AOC 4th lowest |
| Sl No | Description | Qty | Unit | M/S Navdeep Singh and Co. L2 | JITENDER CONTRACTOR L4 | MOHAN LAL GOYAL CONTRACTOR L3 | The Dhani Mithi Shree Ganesh Coop Multipurpose Society Limited L1 |
|---|---|---|---|---|---|---|---|
| 1.00 | Credit for old brickbats | 25.36 | Cum | 950 -₹24,092 | 880 -₹22,316.80 | 880 -₹22,316.80 | 950 -₹24,092 |
Tender Value
₹1.2 Cr
EMD Value
₹2.3 L
Closing Date
5 Mar 2026, 6:00 pmClosed
RAHUL
Bhiwani W.S. Divn. Bhiwani
Estimate for providing pitching and bank strengthening for protecting seepage and breaches including structures from RD 118700 to 122500 of Bhiwani Ghaggar Drain.
2026_HRY_503711_1
202648E46F07 B732 4B61 B400 2DCC6DD12D7F127IRR
Open Tender
Civil Works
100 days
RATERA
2 documents required · 2 mandatory
₹15,000
₹2.3 L
Yes
9 Apr 2026
19 Feb 2026
6 Mar 2026
19 Feb 2026
5 Mar 2026
19 Feb 2026
Credit for old brickbats
Percentage BoQ
BoQ_Ver3.0
Name of the Bidder/ Bidding Firm / Company :
PRICE SCHEDULE (This BOQ template must not be modified/replaced by the bidder and the same should be uploaded after filling the relevent columns, else the bidder is liable to be rejected for this tender. Bidders are allowed to enter the Bidder Name and Values only )
NUMBER #
[11.25.2]Pointing on brick work or brick flooring with cement mortar 1:3 (1 cement : 3 fine sand): 2. Raised and cut pointing [Through Rate]
[11.5.2]12 mm cement plaster of mix : 2. 1:3 (1 cement: 3 fine sand) [Through Rate]
[14.1]Dressing bed and preparation of sub grade for lining by mechanical/ mannual means [Through Rate]
[14.18]Filling expansion joints, with special impervious hot pour, 12.5 mm wide. [Through Rate]
[14.2]Dressing side slopes and preparation of sub grade for lining by mechanical/ mannual means [Through Rate]
[21.95.11]Providing lowering cutting jointing and testing RCC pipe class NP3 as per IS-458-2003 with spigot and socketed joints manufactured with ISI marked sulphate resistance cement as per ISI 12330 with rubber rings ISI marked antiternmite as required at site in to trenches for all depths and laying out the same to correct alignment gradients and levels including dressing and trimming and cutting of concrete beds and side of trenches, if required jointing with rubber rings in trenches and jointing with 1:3/2 cement sand mortar and with end dowels filled with 1:3/2 cement sand mortar and finishing the joints at an angle of 45 degree with faces of spigot of socket joints cutting and finishing the cut surface to a uniform finish etc. as fully described in item No. 21.38, item 21.44, item 21.45, and item 21.46 including cartage loading and unloading complete in all respects. the internal diametric of the sewer being: 11. 1400 mm [Through Rate]
[4.12.1]Earth work in excavation by mechanical means (Hydraulic excavator)/manual means over areas (exceeding 30 cm in depth, 1.5 m in width as well as 10 sqm on plan) including getting out and disposal of excavated earth lead up to 50 m and lift up to 1.5 m, as directed by Engineer-in-charge. 1. All kinds of soil [Through Rate]
[4.33]Excavating, supplying and filling of local earth (including royalty) by mechanical transport up to a lead of 1 km also including ramming and watering of the earth in layers not exceeding 20 cm in trenches, plinth, sides of foundation etc. complete. [Through Rate]
[5.7.4]Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge. 4. In cement mortar [Through Rate]
[6.1.4]Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work below plinth level and up to Floor IV level: 4. 1:3:6 (1 Cement : 3 coarse sand (zone-III) : 6 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.14.1]Providing and laying in position specified grade of reinforced cement concrete, excluding the cost of centering, shuttering, finishing and reinforcement - All work up to plinth level : 1. 1:1.5:3 (1 cement : 1.5 coarse sand (zone-III): 3 graded stone aggregate 20 mm nominal size) [Through Rate]
[6.22.1.2]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 1.2. All works above plinth and up to floor IV level : M-15 grade plain cement concrete (cement content considered @ 240 kg/cum) [Through Rate]
[6.22.2.3]Providing and laying in position ready mixed plain cement concrete, with cement content as per approved design mix and manufactured in fully automatic batching plant and transported to site of work in transit mixer for all leads, having continuous agitated mixer, manufactured as per mix design of specified grade for plain cement concrete work, including pumping of R.M.C. from transit mixer to site of laying and curing, excluding the cost of centering, shuttering and finishing, including cost of curing, admixtures in recommended proportions as per IS : 9103 to accelerate/ retard setting of concrete, improve workability without impairing strength and durability as per direction of the Engineer-in-charge. 2.3. All works up to Plinth Level : M-10 grade plain cement concrete (cement content considered @ 220 kg/cum) [Through Rate]
[6.29.3]Centering and shuttering including strutting, propping etc. and removal of form work for : 3. Columns, piers, abutments, pillars, posts and struts [Through Rate]
[6.30.5]Centering and shuttering including strutting, propping etc. and removal of form for 5. Lintels, beams, plinth beams, girders, bressumers and cantilevers [Through Rate]
[6.33.6]Steel reinforcement for R.C.C. work, where not included in the complete rate of RCC, including straightening, cutting, bending, placing in position, binding, wastage, overlaps, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire etc. complete in all respect below plinth level Note: Reinforcement shall be measured in length including hooks, if any, separately for different diameters as actually used in work , excluding overlaps. Wastage, overlaps, couplings, welded joints, spacer bars, chairs, stays, hangers and annealed steel wire or other methods of binding & placing shall not be measured and cost of these items shall be deemed to be included in the rates for reinforcement. 6. Thermo-Mechanically Treated bars of grade Fe-500D or more [Through Rate]
[7.21.3]Brick work with common burnt clay non-modular bricks of class designation 10.5 in foundation and plinth in: 3. Cement mortar 1:3 (1 cement : 3 coarse sand) [Through Rate]
[7.22.3]Brick work with common burnt clay non-modular bricks of class designation 10.5 in superstructure above plinth level up to floor IV level in all shapes and sizes in : 3. Cement mortar 1:3 (1 cement : 3 coarse sand) [Through Rate]
Please Enable Macros to View BoQ information
stage.html
html • 0.05 MB
technical_582405.pdf
techsummary_582405.pdf
finance_582405.pdf
BOQ Comparative Chart
xlsx
finsummary_582405.pdf
aoc.pdf
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Tendernotice_1.pdf
PDF • 0.76 MB
BOQ_582405.xls
BOQ • 0.28 MB
Download all tender documents and submit your bid