Loading…
Tenderkart now works inside Claude and ChatGPT: search and analyse tenders right from your chat
Loading…
Tender ID
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
| # | Company | Status |
|---|---|---|
| 1 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 2 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
| 3 | Admitted-Fee/PreQual/Technical/Finance | Admitted-Fee/PreQual/Technical/Finance |
Tender Value
Refer Docs
Closing Date
14 Mar 2022, 3:00 pmClosed
Eligibility, documents, scope and key termsEligibility, required documents, scope of work and key terms of this tender, in one click.
EXECUTIVE ENGINEER REW KUPWARA
EXECUTIVE ENGINEER REW KUPWARA
Construction of three Roomed MS Building at Gotlipora , Block Hyhama, Pyt Gutlipora
2022_RDPR_163447_1
NIT NO182Fresh
Open Tender
Civil Works
Item Rate
150 days
EXECUTIVE ENGINEER REW KUPWARA
Please refer Tender documents.
2 documents required · 2 mandatory
₹300
Yes
EXECUTIVE ENGINEER REW KUPWARA
Yes
14 Mar 2022
8 Mar 2022
14 Mar 2022
8 Mar 2022
14 Mar 2022
8 Mar 2022
8 Mar 2022 - 8 Mar 2022
150 days
Amount
Providing and laying of dry stone soling (hand packed tightly ) incliuding all carriages of Material upto site of work complete Job by MT aas well as HL
Providing and laying in position cement concrete of specified grade including curing but excluding the cost of centring and shuttering. All work upto plinth level with:1:3:6 (1 cement : 3 coarse sand : 6 graded stone aggregate 20 mm nominal size), including all carriages by MT as well as HL of material up to site of work complete job.
Brick work with common burnt clay (non-modular) bricks of class designation 7.5 in foundation and plinth including curing in :Cement mortar 1:6 ( 1 cement : 6 coarse sand) including Extra for brick work with common burnt clay bricks in superstructure above plinth level upto floor five level incl all carriages
Providing and laying in position specified grade of reinforced cement concrete including curing but excluding the cost of centering, shuttering, finishing and reinforcement. 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size incl all carriages
Steel Reinforcement for R.C.C work, including straightening, cutting, bending, placing in position and binding all complete up to plint level with Hot rolled deformed bars, including all carriages by MT as well as HL up to site of work complete.
Centering and shuttering including strutting, propping etc. and removal of form work for: Foundations, footings, bases for columnswith all carriages of material by MT as well as HL up to site of work Complete job
Providing wood work in frames of doors, windows, clerestory windows and other frames, wrought framed and fixed in position with hold fast lugs or with dash fasteners of required dia and length (K D wood)
CEMENT PLASTER (IN COARSE SAND) 12mm Cement plaster of mix: 1 : 4 ( 1 cement : 4 coarse sand)
Providing and fixing glazed shutters for doors, windows and clerestory windows using 4mm thick float glass panes including ISI marked M.S. pressed butt hinges bright finished of required size with necessary screws. 30mm thick KD wood
Structural steel work in built up sections, framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete.
Providing and fixing of Community Inforamtion board (CIB)
SAJAD AHMAD RESHI
SHAMSHAD ALI KHAN
stage.html
html • 0.02 MB
boq_comp_chart.xlsx
xlsx
Tap a document below to read it instantly. You can also download everything as a ZIP if you prefer.
details.html
html • 0.03 MB
Download all tender documents and submit your bid
Disclaimer: TenderKart has made every reasonable effort to ensure that the information on this page is accurate and authentic, however it cannot be held liable for any third-party claims or losses or any damages. TenderKart makes no warranty, expressed or implied, as to the results obtained from the use of this information. If you notice any error or omission, please let us know at .